text stringlengths 1 4.46k | employee_id stringclasses 45 values |
|---|---|
George Robinson | dev45 |
will do.... | dev45 |
Thanx George for the update. | dev45 |
Norm would you mind visiting with Ms. Bernacik and explaining to her the difference between the excavation area where the underground tanks were removed and the landfarm area? | dev45 |
If need be we can write her another letter requesting the closure and backfilling of the underground storage tanks. | dev45 |
George Robinson | dev45 |
Received the "permit by rule" approval for the turbine power unit changeout for the Keystone C/S. | dev45 |
The emissions testing results for the Plains Turbine Station was submitted to the TNRCC. | dev45 |
Discharge renewal applications for C/S No. 9 and Monument Turbine C/S were submitted to the OCD. | dev45 |
Notification to the New Mexico AQB was given for the power turbine changeout at the Atoka No. 2 C/S. | dev45 |
One employee was skill verified for level II environmental During the routine weekly sampling of the PG&E system, it was discovered that approx. | dev45 |
3 oz of liquid had collected in the new filter separator in the PG&E C/S yard. | dev45 |
A request was made to analyze the liquid for not only PCB's but also pH to determine if the liquids resulted from the caustic and water cleaning of the upstream portion of the pipe leading into the PG&E C/S . | dev45 |
This is the first occurance of liquids at this location since this new filter separator was installed and put inot service. | dev45 |
The Title V air permit for C/S No. 4 has been issued. | dev45 |
There are some requirements and conditions under this permit that the team should be aware of and will be required to comply with. | dev45 |
I would like to visit with the team at their safety meeting in June or july to go over the conditions of the permit. | dev45 |
Please give the the dates in June and July when your next safety meeting is. | dev45 |
This Title V presentation should last about 3 hours. | dev45 |
During the quarterly conference call with SoCal in which we discuss PCB costs on the SoCal system, for which Transwesten is 86% responsible, Ralph Komai, SoCal's PCB person provded some addtional information with respect to what is going on with the PCB activities on the SoCal system. | dev45 |
As a result of the PG&E press release, SoCal management directed additional sampling to be done at their interconnect with Transwestern and downstream of this interconnect. | dev45 |
Ralph reported that a number of liquid samples came back at around 7 ppm, however one sample at their Kelso Station, near Barstow, came back at 77 ppm. | dev45 |
Ralph had indicated that there has been an increase in the PCB's coming into their collection locations in the Needles area as evidenced by the following: Based upon 1997 data, almost no liquids greater than 50 ppm were revcovered Data collected in 1998 showed that approx. | dev45 |
8% of the liquids were greater than 50 ppm Data collected in 1999 showed that approx. | dev45 |
9% of the liquids were greater than 50 ppm Based upon this, Ralph had stated that SoCal would be collecting additional sampling information and possibly entering into an internal montoring program, somewhat like PG&E is currently doing now. | dev45 |
I had informed Ralph that our Needles M/S facility had seen almost no liquids in the last 5 years, other than a recent accumulation of a one time pigging in early 2000 when a small volume of liquids (less than 55 gallons) had been collected. | dev45 |
We discussed that the accumulations seen on the SoCal system were probably from existing liquids on their system which had collected in low points in their pipeline and were moving downstream due to the increased flows from TW into SoCal. | dev45 |
Ralph gave the impression that there were no immediate management tensions resulting from the recent "hits". | dev45 |
He just indicated that they would be watching their system and sampling at a more frequent basis. | dev45 |
Atttended the NMOGA meeting in Farmington, NM. | dev45 |
It appears that the BLM will implement its own noise criteria in areas within New Mexico that are deemed sensitive by the BLM. | dev45 |
The proposed noise threshold will be 48.6 DBA(A). | dev45 |
There are no Transwestern facilities in the Farmington resource area which will be impacted by this proposed level, however the potential exists for several Transwestern locations in southeast New Mexico to be impacted. | dev45 |
A meeting was held with the president of Del Mar, concerning the issues associated with the lead in their lead acetate tape for monitoring sulfur concentrations in the natural gas. | dev45 |
A request was made to the company to determine the feasability of recycling the tape and eleviate the management and disposal issues associated with the tape as a hazardous waste. | dev45 |
The quarterly SoCal Transwestern PCB conference call was held this week. | dev45 |
Transwesten's share (86%) of SoCal's PCB management activities was approx. | dev45 |
$79,000. | dev45 |
Due to the press release by PG&E concerning the increased occurance of PCB's into their system, SoCal has initiated increased sampling activities on their system and will be proposing to do additional monitoring to track liquids from Transwestern's M/S into the SoCal system. | dev45 |
Preliminary sampling results at strategic liquids locations on the SoCal system has revealed hits of PCB's in the range of 7-10 ppm, although, a hit of 77 ppm was discovered. | dev45 |
As a result of an isolated hit of PCB's into the new filter separator at the PG&E C/S in excess of regulated levels, a conference call was held the ET&S VP to determine forthcoming activities with PG&E. | dev45 |
A meeting has been scheduled at the PG&E C/S next week to reveiw sampling on the PG&E system and discuss the recent hit of PCB's in the F/S and what forthcoming activities will be conducted at the site. | dev45 |
A meeting was held in Laughlin, Nv with PG&E to discuss the liquids which were received and analytical result of 505 ppm which occurred at the PG&E F/S. | dev45 |
Additional discussions centered around the latest migration of PCB's into the PG&E system and control technologies to stop additional migration of PCB's into PCB free portions of their distribution system. | dev45 |
Annual emission fees were paid to the ADEQ for C/S No. 1, Kingman in the amount of $31,145.26 Annual hazardous waste fees were paid to the DTSC for the facilities that operate in the state California A meeting was held in Albuquerque to discuss and apprise involved parties of histoirc and proposed activities for 2000 for the 10 groundwater remediation projects currently being conducted in Texas and New Mexico. | dev45 |
Received a call from the TNRCC about an air quality inspection at the Irion Co. No. 1 C/S on 6/30. | dev45 |
the team was notified and preparations are currently being completed to ensure that all recordkeeping, permits and monitoring reports are onsite during the inspection. | dev45 |
Leo, for my weekly report please use the following: Provided environmental oversight and sampling for the cleaning and decontamination of the filter separator at the PG&E C/S. | dev45 |
Assisted the San Juan team in preparing for the forthcoming consolidated audit in July. | dev45 |
Witnessed the post noise surveys for the Gallup and Bloomfield C/S's which were FERC requirements under the 7C certificate for construction. | dev45 |
Leo Nichols | dev45 |
As a result of the latest meeting with PG&E over the greater than 500 ppm PCB liquids collection at the PGE Topock C/S filter separator (F/S), presented below is a summary of the deconning and sampling activity which occurred Vector was instructed to use a high caustic detergent (Cimclean) as the cleaning agent for removing PCB's from the Topock F/S (50:50 Cimclean:water mixture). | dev45 |
Diesel was not used in the deconning process. | dev45 |
The only equipment cleaned by Vector was the PG&E F/S. | dev45 |
Transwestern's filters in its separator were replaced, but no cleaning or deconning was perfromed to this unit. | dev45 |
The filters were also replaced in the PG&E separator. | dev45 |
The following samples were collected during this project: On the Transwestern side: 1. | dev45 |
Wipes (3) of the interrior body of our filter separator after the filters were removed. | dev45 |
Large areas were wiped to determine presence/absence of PCB's. | dev45 |
(Not 100 sq. cm. sample) 2. | dev45 |
A composite sample of a used filter removed from the upstream separator at the Selexol Plant. | dev45 |
The filters appeared to be exceptionally clean 3. | dev45 |
Composite sample of the fine powdery rust which had collected in the bottom of the F/S. | dev45 |
Approximte volume one cup. | dev45 |
4. | dev45 |
Composite sample of the used filters from the F/S. | dev45 |
Visible appearance of the filters removed from this vessel showed them to be clean and virtually unstained. | dev45 |
A small discoloration was present on the ends of each filter confirming that the filters were sealed properly in the F/S. | dev45 |
5. | dev45 |
A sample of an unused clean stocked filter. | dev45 |
This was a control sample. | dev45 |
On the PG&E side: 1. | dev45 |
A liquids sample of the residual in the upstream leg of the Topock filter separator prior to deconning. | dev45 |
Approx. | dev45 |
volume one cup 2. | dev45 |
Sample of the solids (fine, blackened, powder) which had collected in the F/S. | dev45 |
An estimate of the volume of this material removed form the F/S prior to deconning was approximately one gallon. | dev45 |
3. | dev45 |
Wipe samples (3) of the interrior of the F/S prior to deconning (not 100 cm sq. wipe) 4. | dev45 |
Used filter media from the F/S. | dev45 |
The operation of the F/S filters are designed to be a twice pass through of the same filter. | dev45 |
Composite samples were collected of the upstream and downstream portions of the filters. | dev45 |
5. | dev45 |
Wipes (3) of the deconned filter separator interrior walls. | dev45 |
The only inconsistency observed during the cleaning and inspection process was the volume and buildup of the black fine powdery hydrcarbon material which was present in the F/S at the Topock C/S and conspicuously small amount of rust colored material which was present in Transwestern's F/S . | dev45 |
As previously mentioned, samples were collected of both materials. | dev45 |
The only difference between the two locations was the color of the materials and the volume. | dev45 |
It is suspected that the deconning activity conducted in August of 99 loosened hydrocarbon solids present in the 1850 feet of pipe which had over time moved and collected in the PG&E F/S. | dev45 |
The small amount of rust materials observed in the Transwestern F/S is the result of the pigging activity from the Selexol Plant into the Transwestern F/S. | dev45 |
I will have reprensentataive samples of both materials. | dev45 |
Photographs were also taken of the cleaning and inspection activities and will be available for review at the forthcoming meeting in Flagstaff with on the 13th of July. | dev45 |
Analytical results will also be completed at this time. | dev45 |
Thanx. | dev45 |
Very professionally written. | dev45 |
I only had to look up a couple of words. | dev45 |
test | dev45 |
Carmen--- My night differential has not posted to my last four paychecks. | dev45 |
The last time I received it was for pay period ending 05/15/2000. | dev45 |
Would you please include a retro adjustment to my next check? | dev45 |
SCROLL DOWN TO OHIO STATE. | dev45 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.