text
stringlengths
1
4.46k
employee_id
stringclasses
45 values
Employees that works at any of the three facilities are required to be present for the training.
dev45.message.text
Your participation in this will be greatly appreciated.
dev45.message.text
Lorraine, Ill give you a call this afternoon.
dev45.message.text
By the way, did they test the liquids for PCBs?
dev45.message.text
I havent heard from the Gallup team on whether they have gone and checked for collected liquids at their I/C's.
dev45.message.text
Rick, can youcheck on this for me?
dev45.message.text
Louie, after the presentation MIchael gave, there were some issues about the data and predictions ie., like how much solvent do we really need to clean the pipeline and the injection intervals and locations, but not whether the solvent or technology would or would not work.
dev45.message.text
The data did show that terpenoline does remove PCB's from pipeline.
dev45.message.text
But because Penn State was so deeply involved in the modeling study, and we were still under the PG&E thumb, it appeared to be in the best interest of TW to see it to the end.
dev45.message.text
There wasnt anyone who had any better suggestions or ideas.
dev45.message.text
The thought was that because of the amount of $$$$$$ we had previously spent, not to see it through would have meant 0 return for the money we had invested.
dev45.message.text
And if it works, the money would have been wisely used.
dev45.message.text
The real truth of course is when we do a trial run.
dev45.message.text
I signed a six month extension to the contract for Penn State (I sent out a memo on this) but not for additional $$$$$$.
dev45.message.text
They needed the extra time to complete the modeling study and data evaluation.
dev45.message.text
Last summer/fall, Tiny had been overseeing the operational side of this (ie terpenoline storage locations and coordinating injection points and the pigging activities).
dev45.message.text
When the decision is made to begin the injections and pigging, Tiny will be ready and waiting......
dev45.message.text
Bret, what do you think about this?
dev45.message.text
We have pretty much proven that we are not the culprits is this activity.
dev45.message.text
I have a problem conducting an ongoing sampling for an issue that were not responsible for, even though we initiated the sampling activity.
dev45.message.text
I plan on visiting the OCD about this issue and either forcing them to justify why we should continue the sampling when the data points to our neighbors.
dev45.message.text
Additionally, because of the turnover and inability to get the guilty party to get moving on this, spending additional money and not receiving any return seems like a waste of time.
dev45.message.text
Thoughts....
dev45.message.text
George Robinson
dev45.message.text
i do not know this person.
dev45.message.text
i think you have the wrong larry campbell.
dev45.message.text
i do not know this person.
dev45.message.text
i think you have the wrong larry campbell.
dev45.message.text
your resume is good enough b/c i gave it directly to the hiring people.
dev45.message.text
your resume is good enough b/c i gave it directly to the hiring people.
dev45.message.text
Bill you may want to sit in on this if you have time.
dev45.message.text
It seems we have items of concern that were identified during the consolidated audit at Bakersfield which were tied into a previous agreement with Koch for which the action team did not know when the action items were prepared.
dev45.message.text
The action dates are approaching and Scott and I are having a hard time getting clearification on how to initiate getting the the action items started due to the responsibility of Koch for some of the items.
dev45.message.text
Ed, the attorney for EOTT, will be requested by Lou, to notify Koch concerning their responsiblity.
dev45.message.text
If this sounds convoluted, then you know as much as I.....
dev45.message.text
Laguna and or Moutainair team, because I dont know which team is responsible for the Belen delivery point, would someone check on liquids at this location and if present, collect a sample and have it analyzed for PCB's?
dev45.message.text
We're required to do this by the contract.
dev45.message.text
If no liquids are present, drop Lorraine and or myself a message stating such.
dev45.message.text
Thanx
dev45.message.text
Don Baughman and Juan Hernandez.
dev45.message.text
If the listing you saw says Edwin Coulter, he no longer is part of the group.
dev45.message.text
Bill, any delays on this project are NOT from the env.
dev45.message.text
matrix.
dev45.message.text
I received the matrix from the team sometime last week (tuesday -thursday) when I was out of town on business.
dev45.message.text
When I came back on friday, I completed the matrix and sent it back to the team.
dev45.message.text
Any delays on this issue are from the team, not from me.
dev45.message.text
As I remember the project, it involved work on the right of way and therefore was covered by the blankets we have for SHPO and F&W.
dev45.message.text
There were no project delays in terms of permits or approvals......
dev45.message.text
After reveiwing the documents entitled, "Baseline Environmental Investigation of Arco North Coles Levee Plant 8, Rogas Loading Facility and Associated Natural Gas Pipeline Systems Kern County, California" and "Report of Preliminary Asessment Sampling North Coles Levee Gas Plant Loading Rack Area Tupman, California", it appears that the following areas should be investigated further to detemine horizontal and vertical extent of identified contamination from the above referenced reports: Tank 15 area- total petroleum hydrocarbons Glycol reboiler area- total petroleum hydrocarbons Hot oil heater area- total petroleum hydrocarbons Wash rack area- lead Propane comp.
dev45.message.text
area lead total petroleum hydrocarbons Cooling tower area- chromates Compressor area- BTEX lead In the "Baseline Environmental Investigation" report, sampling was only conducted to an approximate depth of 2.5'.
dev45.message.text
I am not comfortable with basing decisions for further investigations on such a shallow depth, in leau of the fact that many times water soluble constituents may horizonatlly move vertically from surface shallow depths into the lower subsurface areas.
dev45.message.text
This is indeed the case for chromates.
dev45.message.text
I based my recommendations for metal concentrations on the federal RCRA Subtitle C hazardous waste target levels for metals and evaluated the TPH and BTEX levels with the underground storage tank guidlines for California.
dev45.message.text
There were references to a 1989 document in the "Baseline" report for specific parameters, but there may have been an update to target contamination level requirements since that date and therefore, I used 10,000 ppm which is a general action level for most states for total petroleum hydrocarbons.
dev45.message.text
Again, I did not evaluate the mercury or the loading rack issues.
dev45.message.text
One last issue.
dev45.message.text
As you know, identification of contamination is usually accomplished by sight observations of visible contamination, knowledge of processes and or history.
dev45.message.text
Report results of the surface contamination do not show there to be an immediate environmental concern.
dev45.message.text
Due to the age of the facility, there may be concerns which were not identified in the reports.
dev45.message.text
However, based upon the locations of the preliminary samplings which were conducted throughout the facility, it appears that the information presented in the reports would be adequate to address suspected contamination at the facility.
dev45.message.text
I spoke with Ken Jacobs, with the Forest Service in Flagstaff, concerning his agencies approval for the turbine construction at Station 2.
dev45.message.text
As a condition of the approval from his agency, he has requested that all the ponderosa pine trees to be removed for the turbine construction activities be flagged for identification.
dev45.message.text
After the trees have been marked, we are to then contact him so that he can visit the site and make an evaluation as to whether the Forest Service will charge us for the tree removal or whether no additional charges will be incurred as a result of the construction activity.
dev45.message.text
The charges will depend upon the calculation of how many board feet of lumber there are in the trees which are flagged.
dev45.message.text
As this activity is included in the time line for completion of all permits and approvals, please contact me when the trees have been tagged and flagged and I will contact Ken Jacobs so that he can make a site visit.
dev45.message.text
Tracy, thanks for the heads up.
dev45.message.text
Beginning in January of 2000, provide me with the new and old serial numbers for each unit and a closer exchange date, as things (scheduling, changeout activities etc.) tend to move dates around.
dev45.message.text
George, after Bret's memo, go ahead and conduct the sampling.
dev45.message.text
the soonest I can discuss the issue with the OCD is in the middle of November.
dev45.message.text
I have reviewed the reports and results of the studies conducted by us and them and the evidence weighs in our favor.
dev45.message.text
At your leisure and prior to the November OCD meeting, prepare a memo to file of the resaons and justification based upon the report results and data why Eunice is not the bad guy in this and why Texaco is.
dev45.message.text
Gradients, plume elevations and characteristics of the contaminants show that this is not our problem.
dev45.message.text
Id like to have sufficient evidence, both mine and yours, to force OCD to go afterTexaco and get us out of this issue.
dev45.message.text
I think this would also help Bret's case for having Texaco (or whoever is responsible) reimburse Northern for the costs we have incurred for what is Texaco's problem.
dev45.message.text
George Robinson
dev45.message.text
Byron/Tiny, I spoke to Ken Jacobs with the Forest Service and have attached his e mail below concerning the Forest Sevice's choice for the building.
dev45.message.text
I have informed him that our new piping and ancillary equipment will remain white which is consistent with the existing equipment.
dev45.message.text
He had no problems with this.
dev45.message.text
I also had asked him if there was a name for the brown which the FS uses on their signs and he did not know of a specific name, so I think the best thing would be to match as closely as possible.
dev45.message.text
The Forest Service would like the new Compressor Building to be painted dark brown.
dev45.message.text
The color should be close to the color that we use for our signs.
dev45.message.text
Call me at 520-214-2464 if you would like to discuss this.
dev45.message.text
Ken Jacobs Lands Staff Officer Ranger District Coconino National Forest
dev45.message.text
Michael, I will be discussing with John and others in the near future about the status of the study.
dev45.message.text
When will your progress report be ready for review?
dev45.message.text
It might be a good idea to let us review your report and then we can make comments and recommendations based upon your findings.
dev45.message.text
Im glad that things are going well with your data and that we may be able to apply something positive towards our situation.
dev45.message.text
Thanks for getting back with me.
dev45.message.text
Bob, James, Roger, Im having a hard time getting a response from the teams in the Midland Region in completing the attached EOTT tank spreadsheet.
dev45.message.text
Ive heard from some of the teams but nothing from others.
dev45.message.text
Im under the gun as to finding out where the MIdland Region is in term of permits and and environmental compliance and the only way I can begin to make the evaluation is to have the field data inputed onto the spreadsheet.
dev45.message.text
This is where the teams assistance is required.
dev45.message.text
I have attached the latest version of the spreadsheet in the hope that you will deliver it to the following teams for their valued input: Monahans Team Hamlin/Haskel Team Lamesa Team Big Lake Team Midland Team Eunice Team Your assistance in this will be greatly appreciated.
dev45.message.text
i fixed it.
dev45.message.text
until further notice PJM to NY deals will have a trans.
dev45.message.text
id of 5062820,5064308,or 5064505.
dev45.message.text
NY to PJM trans id is 5042199.
dev45.message.text
try to get it done by tommorow.
dev45.message.text
send me the resume
dev45.message.text
For the 100mw, use 622332.
dev45.message.text