Document Name
stringclasses
11 values
URL
stringclasses
11 values
page_number
int64
1
1.26k
full_text
stringlengths
65
18.2k
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
647
Disconnecting the cable harness in the base Note Action DANGER Make sure that all supplies for electrical power, hydraulic pressure, and air pressure are turned off. 1 ![Image] xx1500003082 Remove the base cover. 2 ![Image] xx1500003083 Disconnect R1.MP-A and R1.MP-B. 3 Sparkplug wrench ![Image] xx1500003084 Disconnect...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
648
Note Action ![Image] xx1500003085 Remove the two earth cables. 5 ![Image] xx1500003088 For easier access: Remove connection plate and bottom plate. 6 Use caution and pull out the cable harness from the base. 7 Disconnecting the axis-1 motor cables Note Action DANGER Make sure that all supplies for electrical power, hyd...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
649
Note Action ![Image] xx1200001070 Note Make sure the o-ring is not lost when remov- ing the cover. 3 ![Image] xx1200001066 Disconnect the motor cables. 4 ![Image] xx1200001067 Remove the cable gland cover. Inspect the gasket. Note Replace if damaged. Tip Make a note in which direction the cable exit hole is facing, if ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
650
Note Action Lifting accessory (chain): 3HAC15556-1 Attach the lifting accessories. 2 Lifting accessory, motor: 3HAC14459-1. 24 VDC power supply To release the brakes, connect the 24 VDC power supply. 3 Connect to R2.MP1-connector: • + = pin 2 • - = pin 5 CAUTION The weight of the motor is 27 kg All lifting accessories ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
651
Note Action ![Image] xx1500002084 Use caution and lift the motor straight up to get the pinion parted from the gear. 9 Disconnect the 24 VDC power supply. 10 Removing the hub Note Action DANGER Make sure that all supplies for electrical power, hydraulic pressure, and air pressure are turned off. 1 ![Image] xx1500002038...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
652
Note Action Attachment screws: M6x110 (2 pcs) ![Image] xx1500002081 Fit two screws in opposite holes of the hub and use them as removal tools. 4 ![Image] xx1500002326 Lift out the hub carefully. 5 Separating base, including gearbox, from the arm system Note Action ![Image] xx1500003118 Remove the plastic plugs covering...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
653
Note Action ![Image] xx1500003119 Unscrew the M16x110 screws (18 pcs) that secure the gearbox to the frame. Tip This procedure is best done with two per- sons working together: • Person one: working under the base, holding the torque wrench in place, and making sure the bit is correctly fitted. • Person two: working be...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
654
Note Action ![Image] xx1500003121 Use caution and lift the complete arm sys- tem up. Note Lifting height needed for the complete arm system to go free from the axis-1 gearbox: 375 cm. 3 Remove the guide pins before the arm system is put down. 4 Put the arm system on a level foundation. DANGER DO NOT remove the lifting ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
655
Note Action Attach the lifting accessories to the axis-1 gearbox. 3 Stretch the lifting accessory (chain) to take the weight of the axis-1 gearbox. 4 Torque Multiplier ![Image] xx1500003122 Unscrew the M20x60 screws that secure the axis-1 gearbox to the base. Tip Use a Torque Multiplier between the screw and the torque...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
656
Refitting the gearbox Use these procedures to fit the gearbox. Preparations before fitting the gearbox Note Action CAUTION The gearbox weighs 150 kg. All lifting accessories used must be sized accordingly. 1 Lifting eye: M16 3HAC14457-4 (2 pcs) Fit lifting eyes in opposite holes. Note Do not tighten the lifting eyes co...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
657
Note Action Inspect the o-ring. Note Replace if damaged. 2 Put some grease on the o-ring and fit it in the oil hose groove. 3 Attach two guide pins in opposite holes of the gearbox. 4 One of the guide pins shall be fitted in the hole closest to the guiding pin. Before fitting the gearbox, make sure that the guiding pin...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
658
Note Action Tightening torque, step 1: 100 Nm Secure the gearbox to the base in two steps; • Secure the 18 attachment screws crosswise to 100 Nm. • Secure the screws crosswise to 450 Nm. Tip Use a torque converter between the screw and the torque wrench, to facilitate the tightening of the screws. 9 Tightening torque, ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
659
Note Action Adjust if needed. 4 Lifting complete arm system onto base and axis-1 gearbox Note Action CAUTION The complete armsystem weighs 4,300 kg. All lifting accessories used must be sized accordingly. 1 Use caution and lift the complete arm sys- tem up. 2 Clean contact surfaces between base in- cluding gearbox, cro...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
660
Note Action ![Image] xx1600000043 Orient the small dowel pins in gearbox and frame, and at the same time, match cross roller bearing dowel pin to the hole in the base, while lowering the complete arm system carefully onto the long guide pins. Note It is possible to rotate the cross roller bearing and the gearbox by han...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
661
Note Action Attachment screws: M16x110 12.9 Gleitmo (18 pcs) ![Image] xx1500003119 With the complete arm system resting on base and axis-1 gearbox, fit the attachment screws that hold the gearbox to the frame. Tip This procedure is best done with two per- sons working together: • Person one: working under the base, hol...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
662
Note Action Tightening torque, step 1: 100 Nm Secure the cross roller bearing to the frame in two steps; • Secure the 18 attachment screws crosswise to 100 Nm. • Secure the screws crosswise to 300 Nm. Tip Use a torque converter between the screw and the torque wrench, to facilitate the tightening of the screws. 6 Tight...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
663
Note Action ![Image] xx1500002082 Examine the pinion and the splines in the hub for damages. 5 Grease: Castrol Molub. Alloy 777-1 NG ![Image] xx1500002346 Make sure that there is enough grease on the splines before fitting. If not, apply 3 gram of grease. 6 Refitting the hub Note Action Attachment screws: M6x110 (2 pcs...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
664
Note Action ![Image] xx1500002326 Refit the hub. 3 Attachment screws: M6x30 12.9. Remove the two M6x110 and fit the attach- ment screws for the hub. 4 Loctite 243 Apply locking liquid (Loctite 243) on the screws. Note The number of attachment screws differ depending on gearbox. Quantity: • Axis-1 = 6 pcs • Axis-2 = 8 p...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
665
Note Action O-ring, 3HAB3772-107 ![Image] xx1200001019 Inspect the o-ring. Note Replace if damaged. 4 ![Image] xx1200001020 Make sure the o-ring is seated in the groove. Tip Lubricate the o-ring with some grease for a better fitting in the groove. 5 Flange sealant: Loctite 574 ![Image] xx1500002357 Apply flange sealant...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
666
Note Action ![Image] xx1200001135 If the motor is a new spare part, remove the cover. 7 Securing the axis-1 motor Note Action Guide pin, M10x150: 3HAC15521-2 Fit guide pins in opposite holes. 1 Always use guide pins in pairs. CAUTION The motor weighs 27 kg. All lifting accessories used must be sized accordingly. 2 Lift...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
667
Note Action CAUTION Whenever parting/mating motor pinion and hub, the splines may be damaged if excess- ive force is used. 7 ![Image] xx1500002084 Lower the motor into position. • Make sure that the motor pinion is properly mated into the hub. • Make sure that the motor pinion does not get damaged. • Make sure that the...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
668
Attaching lifting accessories, complete robot Note Action CAUTION The IRB 8700 robot weighs 4,750 kg. All lifting accessories used must be sized accordingly! 1 Mobile platform ladder Use a mobile platform ladder (or similar) and attach the lifting accessories. DANGER Never use the robot as ladder. 2 Roundsling 2 m: Lif...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
669
Note Action Tightening torque: Secure the robot to the foundation. 6 550 Nm (screws lubricated with Molykote 1000) 600-725 Nm, typical 650 Nm (screws none or lightly lubricated) Refitting the cable harness in the base Note Action DANGER Make sure that all supplies for electrical power, hydraulic pressure, and air press...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
670
Note Action ![Image] ![Image] ![Image] ![Image] A B C F E D ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] xx1500003081 Cables down through hole in frame, to base plate A Axis-2 motor cables B SMB/BU cables C Cables up through lower arm and onwards D Axis-3 m...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
671
Note Action Make sure the signal cable R1.SMB runs under the oil hose and above the R1.MP cables, through the base. 7 Sparkplug wrench ![Image] xx1500003084 Refit the R1.SMB cable, with the large re- cess pointing upwards to the right. Tip Use a Sparkplug wrench (or similar). ![Image] ![Image] xx1200000888 8 Attachment...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
672
Note Action ![Image] xx1200001067 Refit the cable gland cover. Note Replace the gasket if damaged. 2 ![Image] xx1200001066 Connect the motor cables. Connect in accordance with the markings on the connectors. 3 O-ring: 3HAC054692-002 ![Image] xx1200001070 Inspect the o-ring. Note Replace if damaged. 4 Wipe clean o-ring ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
673
Note Action ![Image] xx1200001135 Refit the motor cover with its attachment screws. Note Do not reuse the self-threading attachment screws. Replace with standard attachment screws or the threads will be damaged. Note Make sure the o-ring is undamaged and properly fitted. 8 Make sure that the covers are tightly sealed. ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
674
Note Action Corrosion protection: Mercasol ![Image] xx1500002094 Apply corrosion protection on the marked area on the stop pin and on the matching area in the hole. 3 CAUTION The mechanical stop pin weighs 13 kg. 4 ![Image] xx1500002091 Put a piece of wood (or similar) underneath the stop pin, to prevent it from fallin...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
675
Note Action ![Image] xx1500002092 Make sure that the set screw will find the groove in the stop pin, before securing the mechanical stop pin. Tip Use caution and move the stop pin a little up and down while at the same time care- fully fitting the set screw, making sure that the screw will secure the stop pin in the gr...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
676
4.8.3 Replacing the axis-2 gearbox Location of the axis-2 gearbox The axis-2 gearbox is located as shown in the figure. ![Image] xx1500002069 Required spare parts Note The spare part numbers that are listed in the table can be out of date. See the latest revision of Product manual, spare parts - IRB 8700 on ABB Libra...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
677
Required tools and equipment Note Article number Equipment, etc. Used to release the motor brakes. - 24 VDC power supply Used to secure lower arm and parallel arm. - Lock screw, M20x150 Fully threaded - Screw M6x110 Fully threaded - Screw M16x80 Always use guide pins in pairs. 3HAC15521-2 Guide pin, M10x150 Always use ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
678
Deciding calibration routine Decide which calibration routine to be used, based on the information in the table. Depending on which routine is chosen, action might be required prior to beginning the repair work of the robot, see the table. Note Action Decide which calibration routine to use for calibrating the robot. •...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
679
Note Action Remove any tool or other equipment fitted on the turning disc. 2 See Draining the axis-2 and axis-3 gear- boxes on page 153 . Drain the oil. 3 The three areas of screws that secure axis-2 gearbox to lower arm The axis-2 gearbox is attached to the lower arm with attachment screws arranged in three areas. Us...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
680
Removing the axis-2 gearbox from the lower arm, step 1 - screws in area 1 Note The 45 attachment screws are arranged in three areas with 15 screws in each area. All attachment screws can not be reached with the robot in the same position. This procedure describes how to reach the screws in area 1. Note Action DANGER Ne...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
681
Note Action ![Image] xx1500002334 Jog axis-2 to within the area shown in the figure. 2 ![Image] xx1500002320 Remove the plastic plugs covering axis-2 lock screw hole. Note Keep the plastic plugs. It shall be refitted after the work is done. 3 ![Image] xx1500002335 ![Image] xx1500002367 Jog axis-3 to the area shown in t...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
682
Note Action ![Image] xx1500002365 Remove the axis-3 plastic plug. Note Keep the plastic plugs. It shall be refitted after the work is done. 5 ![Image] xx1500002366 Attaching lock screws to axis-2 and axis-3 Note Action ![Image] xx1500002310 Jog the robot to calibration position. 1 Lock screw, M20x150 ![Image] xx1500002...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
683
Note Action 24 VDC power supply Release the brakes on axis-2 using the brake release button, and let the axis rest on the lock screw. 3 Lock screw, M20x150 ![Image] xx1500002321 Secure axis-3 with a lock screw. 4 24 VDC power supply Release the brakes on axis-3 using the brake release button, and let the axis rest on t...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
684
Unloading the pressure of the balancing device CAUTION Make sure to relief the pressure of the correct balancing device. Relief pressure on axis 2 side when changing axis-2 gearbox, and relief pressure on axis 3 side when changing axis-3 gearbox. ![Image] xx1600001406 Axis-2 balancing device A Axis-3 balancing device B...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
685
Note Action ![Image] xx1500001971 Remove the screws, fitted in the screw holes on top of the balancing device. Note Keep the screws. They shall be refitted after the work is done. 3 M16x35 Apply Molykote on colored areas. ![Image] xx1500002303 Apply some Molykote on threads and at the bottom end of two fully threaded s...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
686
Note Action ![Image] xx1200001135 Unscrew the attachment screws with washers and remove the motor cover. 2 ![Image] xx1200001070 Make sure the o-ring is present. 3 ![Image] xx1200001066 Disconnect the motor cables. 4 Continues on next page Product manual - IRB 8700 685 3HAC052853-001 Revision: D © Copyright 2015-2017 A...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
687
Note Action ![Image] xx1200001067 Remove the cable gland cover. Inspect the gasket. Note Replace if damaged. Tip Make a note in which direction the cable exit hole is facing, if the motor will be re- moved too. The motor shall be refitted in the same position. 5 Use caution and pull out the motor cables. 6 Removing the...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
688
Note Action CAUTION Whenever parting/mating motor pinion and hub, the splines may be damaged if excess- ive force is used! 5 Removal tool M14: 3HAC047108-001 If required, press the motor out of position by using the removal tools in opposite holes of the motor. 6 CAUTION The motor weighs 27 kg. All lifting accessories ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
689
Note Action ![Image] xx1500002038 Unscrew the M6x30 hex socket head cap screws that secure the hub. Note Do not remove the M6x16 torx pan head screws. 2 CAUTION Whenever parting/mating the hub pinion and gearbox, the gears may be damaged if excessive force is used. 3 Attachment screws: M6x110 (2 pcs) ![Image] xx1500002...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
690
Removing the motor flange Note Action ![Image] xx1500002333 Remove two attachment screws in opposite holes. 1 Guide pin, M16x400 Fit guide pins in the holes. 2 Always use guide pins in pairs. ![Image] xx1500002315 Remove the remaining attachment screws (22 pcs) and the six-hole washers (4 pcs). 3 Note There will be som...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
691
Note Action ![Image] xx1500002316 Make sure the o-rings are present. 6 Removing the axis-2 gearbox from the lower arm, step 2 - screws in area 2 Note Action Guide pin, M16x400 Attach two additional guide pins in opposite hole, below the present ones. 1 Always use guide pins in pairs. ![Image] xx1500002336 ![Image] ![Im...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
692
Note Action ![Image] xx1500003111 Remove the attachment screws in area 2. 3 Removing the axis-2 gearbox from the lower arm, step 3 - screws in area 3 Note Action ![Image] ![Image] 1 2 3 1 2 3 xx1500002975 Find area 3. 1 ![Image] xx1500003112 Remove the attachment screws that secure the gearbox to the lower arm in area ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
693
Note Action Mounting set gear (axis 2 and 3), 3HAC059801-001 ![Image] xx1600001553 Insert the guide pins in four of the screw holes. Fasten the set collars. 3 ![Image] xx1500002337 Attach three screws in a triangle and use them as removal tools. 4 ![Image] xx1500002338 Slide the gearbox out on the four guide pins, just...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
694
Note Action Lifting accessory, gearbox: 3HAC054404- 001 ![Image] xx1600001554 Attach the lifting accessories. 6 ![Image] xx1600000067 When the gearbox is removed, make sure to keep the sealing ring. It must be fitted when the gearbox is refitted. Note On a new gearbox, the sealing ring must be removed from the old gear...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
695
Note Action Lifting accessory, gearbox: 3HAC054404- 001 ![Image] xx1600001554 Attach the lifting accessory to the gearbox. 2 Roundsling 2 m: Lifting capacity: 2,000 kg Attach a roundsling to the lifting accessory. 3 Roundsling 2 m: Lifting capacity: 2,000 kg Connect another roundsling to the first one with a shackle. 4...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
696
Refitting the gearbox Use these procedures to refit the axis-2 gearbox. DANGER Never remove both the axis-2 and axis-3 gearboxes at the same time. One of the gearboxes must stay fitted when the other one is replaced. The complete arm system will loose its connection to the frame and thereby be a great security risk. No...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
697
Note Action Clean the contact surfaces between gear- box and frame. 2 Grease ![Image] xx1500002340 Apply some grease on the thin chamfer on the lower arm. 3 Grease ![Image] xx1500002341 Apply some grease on the thin chamfer on the gearbox. 4 Guide pin, M16x400 (2+2 pcs) Fit guide pins as shown in the figure. 5 Always u...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
698
Attaching lifting accessories to the gearbox Note Action CAUTION The gearbox weighs 160 kg. All lifting accessories used must be sized accordingly! 1 Lifting accessory, gearbox: 3HAC054404- 001 Attach the lifting accessory to the gearbox. 2 Roundsling 2 m: Lifting capacity: 2,000 kg (2 pcs) Attach a roundsling to the l...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
699
Note Action Mercasol ![Image] xx1500002350 Apply Mercasol on the surface of the sealing ring and attach it on the gearbox. Note Make sure that the sealing ring is attached cor- rectly on the gearbox. 2 ![Image] xx1500002338 Lift the gearbox onto the guide pins. 3 ![Image] xx1500002347 Note The axis-2 gearbox shall, on ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
700
Attaching the axis-2 gearbox to lower arm - screws in area 3 Note Action ![Image] ![Image] 1 2 3 1 2 3 xx1500002975 Find area 3. 1 ![Image] xx1500002344 Make sure that the hole pattern of the three areas of attachment screws match before lifting the gearbox onto the guide pins. If the hole pattern does not match, caref...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
701
Attaching the axis-2 gearbox to lower arm - screws in area 2 Note Action ![Image] ![Image] 1 2 3 1 2 3 xx1500002975 Find area 2. 1 Begin attaching the screws (M16x70) in the outer- most holes of the outer ring of holes. Tip Make sure that the hole pattern match. If needed, use extreme caution and turn the small gear in...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
702
Note Action ![Image] xx1500002353 Clean o-rings and o-ring groove on gearbox. 3 Inspect the o-rings. Note Replace if damaged. 4 Grease Apply some grease on the o-rings. 5 Attach the smaller o-ring in the gearbox groove. 6 Attach the larger o-ring on the motor flange. 7 ![Image] xx1500002354 Before lifting the motor fla...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
703
Note Action Attachment screws: M16x130 12.9 Gleitmo 603 ![Image] xx1500002355 Attach 20 of the 24 attachment screws with the four six-hole washers. 12 ![Image] xx1500002356 Remove the guide pins and attach the remaining screws. 13 Securing the motor flange together with gearbox Note Action Tightening torque: 300 Nm ![I...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
704
Preparations before refitting the hub Note Action Wipe the hub clean. 1 Inspect the hole where the hub shall be refitted. Wipe clean if needed. 2 ![Image] xx1500002039 Make sure the o-ring on the hub is undam- aged. Note Replace if damaged. 3 Apply some grease on the o-ring for a bet- ter fitting. 4 ![Image] xx15000020...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
705
Refitting the hub Note Action Attachment screws: M6x110 (2 pcs) ![Image] xx1500002081 Attach two screws in opposite holes of the hub and use them as tools to fit the hub. 1 CAUTION Whenever parting/mating the hub pinion and gearbox, the gears may be damaged if excessive force is used. 2 ![Image] xx1500002326 Refit the ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
706
Performing a leak-down test Note Action See Performing a leak-down test on page 190 . Perform a leak-down test. 1 Preparations before refitting the motor Note Action DANGER Make sure that all supplies for electrical power, hydraulic pressure, and air pressure are turned off. 1 Remove old paint residues and other conta...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
707
Note Action Flange sealant: Loctite 574 ![Image] xx1500002357 Apply flange sealant on the motor flange. 6 ![Image] xx1200001135 If the motor is a new spare part, remove the cover. 7 Securing the axis-2 motor Note Action Guide pin, M10x150: 3HAC15521-2 Fit guide pins in opposite holes. 1 Always use guide pins in pairs. ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
708
Note Action Lift the motor and put it on the guide pins, as close as possible to its final position, without pushing the motor pinion into the gear. 5 Remove the lifting accessory and allow the motor to rest on the guide pins. 6 Rotation tool: 3HAC7887-1 Apply the rotation tool and use it to rotate the pinion when mati...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
709
Connecting the axis-2 motor cables Note Action ![Image] xx1300000738 Push the motor cables through the cable gland opening. 1 ![Image] xx1200001067 Refit the cable gland cover. Note Replace the gasket if damaged. 2 ![Image] xx1200001066 Connect the motor cables. Connect in accordance with the markings on the connectors...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
710
Note Action O-ring: 3HAC054692-002 ![Image] xx1200001070 Inspect the o-ring. Note Replace if damaged. 4 Wipe clean o-ring and o-ring groove. 5 Refit the o-ring. 6 CAUTION When fitting the motor cover, make sure not to damage the cables inside the motor. 7 ![Image] xx1200001135 Refit the motor cover with its attachment ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
711
Restoring the pressure of the balancing device Note Action Mobile platform ladder ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] ![Image] xx1500001985 Use a Mobile platf...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
712
Note Action ![Image] xx1500002322 Begin unscrewing the axis-2 lock screw, while at the same time very slowly jogging axis-2, until it is possible to unscrew the lock screw completely. 2 ![Image] xx1500002321 Begin unscrewing the axis-3 lock screw, while at the same time very slowly jogging axis-3, until it is possible ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
713
Note Action ![Image] ![Image] 1 2 3 1 2 3 xx1500002975 Find area 1. 2 Attachment screws: M16x70 Secure the screws in area 1. Tip Mark the screw with a marker pen after each torque. This is to make sure that all screws have been torqued. 3 Tightening torque: 300 Nm ![Image] xx1500003110 Examine that all screws have been...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
714
4.8.4 Replacing the axis-3 gearbox Location of the axis-3 gearbox The axis-3 gearbox is located as shown in the figure. ![Image] xx1500002070 Required spare parts Note The spare part numbers that are listed in the table can be out of date. See the latest revision of Product manual, spare parts - IRB 8700 on ABB Libra...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
715
Required tools and equipment Note Article number Equipment, etc. Used to release the motor brakes. - 24 VDC power supply Used to secure lower arm and parallel arm. - Lock screw, M20x150 Fully threaded - Screw M6x110 Fully threaded - Screw M16x80 Always use guide pins in pairs. 3HAC15521-2 Guide pin, M10x150 Always use ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
716
Deciding calibration routine Decide which calibration routine to be used, based on the information in the table. Depending on which routine is chosen, action might be required prior to beginning the repair work of the robot, see the table. Note Action Decide which calibration routine to use for calibrating the robot. •...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
717
Note Action Remove any tool or other equipment fitted on the turning disc. 2 See Draining the axis-2 and axis-3 gear- boxes on page 153 . Begin draining the oil. 3 The three areas of screws that secure axis-3 gearbox to parallel arm The axis-3 gearbox is attached to the parallel arm with attachment screws arranged in ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
718
Removing the axis-3 gearbox from parallel arm, step 1 - screws in area 1 DANGER When removing the axis-3 gearbox, let the axis-2 gearbox stay fitted! Only remove the screws that either secure the axis-2 gearbox to the lower arm, or the screws that secure the axis-3 gearbox to the parallel arm, depending on which ge...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
719
Note Action ![Image] xx1500003114 Remove the screws in area 1. 3 Lower arm is hidden in this figure, to get a better view. Robot position when removing axis-3 from parallel arm - screws in area 2 Note Action Turn on the power and jog the robot to the specified position: • Axis 1: no significance as long as the robot is...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
720
Note Action ![Image] 1 2 3 1 2 3 xx1500002974 Find area 2. 2 ![Image] xx1500003115 Remove the screws in area 2. 3 Lower arm is hidden in this figure, to get a better view. Preparations before jogging the robot into calibration position Note Action Turn the power to the robot on. 1 ![Image] xx1500002334 Jog axis-2 to wi...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
721
Note Action ![Image] xx1500002320 Remove the plastic plugs covering axis-2 lock screw hole. Note Keep the plastic plug. It shall be refitted after the work is done. 3 ![Image] xx1500002335 ![Image] xx1500002367 Jog axis-3 to the area shown in the figure. 4 Continues on next page 720 Product manual - IRB 8700 3HAC052853...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
722
Note Action ![Image] xx1500002365 Remove the axis-3 plastic plug. Note Keep the plastic plug. It shall be refitted after the work is done. 5 ![Image] xx1500002366 Attaching lock screws to axis-2 and axis-3 Note Action ![Image] xx1500002310 Jog the robot to calibration position. 1 Lock screw, M20x150 ![Image] xx15000023...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
723
Note Action 24 VDC power supply Release the brakes on axis-2 using the brake release button, and let the axis rest on the lock screw. 3 Lock screw, M20x150 ![Image] xx1500002321 Secure axis-3 with a lock screw. 4 24 VDC power supply Release the brakes on axis-3 using the brake release button, and let the axis rest on t...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
724
Unloading the pressure of the balancing device CAUTION Make sure to relief the pressure of the correct balancing device. Relief pressure on axis 2 side when changing axis-2 gearbox, and relief pressure on axis 3 side when changing axis-3 gearbox. ![Image] xx1600001406 Axis-2 balancing device A Axis-3 balancing device B...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
725
Note Action ![Image] xx1500001971 Remove the screws, fitted in the screw holes on top of the balancing device. Note Keep the screws. They shall be refitted after the work is done. 3 M16x35 Apply Molykote on colored areas. ![Image] xx1500002303 Apply some Molykote on threads and at the bottom end of two fully threaded s...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
726
Note Action ![Image] xx1200001135 Unscrew the attachment screws with washers and remove the motor cover. 2 ![Image] xx1200001070 Make sure the o-ring is present. 3 ![Image] xx1200001066 Disconnect the motor cables. 4 Continues on next page Product manual - IRB 8700 725 3HAC052853-001 Revision: D © Copyright 2015-2017 A...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
727
Note Action ![Image] xx1200001067 Remove the cable gland cover. Inspect the gasket. Note Replace if damaged. Tip Make a note in which direction the cable exit hole is facing, if the motor will be re- moved too. The motor shall be refitted in the same position. 5 Use caution and pull out the motor cables. 6 Removing the...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
728
Note Action CAUTION Whenever parting/mating motor pinion and hub, the splines may be damaged if excess- ive force is used. 5 Removal tool M14: 3HAC047108-001 If required, press the motor out of position by using the removal tools in opposite holes of the motor. 6 CAUTION The motor weighs 27 kg. All lifting accessories ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
729
Removing the hub Note Action DANGER Make sure that all supplies for electrical power, hydraulic pressure, and air pressure are turned off. 1 ![Image] xx1500002038 Unscrew the M6x30 hex socket head cap screws that secure the hub. Note Do not remove the M6x16 torx pan head screws. 2 CAUTION Whenever parting/mating the hu...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
730
Note Action ![Image] xx1500002326 Lift out the hub carefully. 5 Removing the motor flange Note Action ![Image] xx1500002358 Remove two attachment screws in opposite holes. 1 Mounting set gear (axis 2 and 3), 3HAC059801-001 Fit guide pins in the holes. 2 ![Image] xx1500002359 Remove the remaining attachment screws and t...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
731
Note Action ![Image] xx1500002360 Use caution and move the motor flange out over the guide pins. 5 ![Image] xx1500002317 Make sure the o-rings are present. 6 Removing the axis-3 gearbox from parallel arm, step 3 - screws area 3 Note Action Mounting set gear (axis 2 and 3), 3HAC059801-001 ![Image] xx1600001553 Attach tw...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
732
Note Action ![Image] 1 2 3 1 2 3 xx1500002974 Find area 3. 2 ![Image] xx1500003116 Remove the attachment screws in area 3. 3 ![Image] xx1500002337 Attach three screws in a triangle and use as removal tools for the gearbox. 4 Continues on next page Product manual - IRB 8700 731 3HAC052853-001 Revision: D © Copyright 201...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
733
Note Action ![Image] xx1500002338 Slide the gearbox out on the four guide pins, just enough to be able to attach the lifting accessories. 5 Lifting accessory, gearbox: 3HAC054404- 001 ![Image] xx1600001554 Attach the lifting accessories. 6 ![Image] xx1600000067 Make sure to keep the sealing ring, when the gearbox is re...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
734
Attaching lifting accessories and removal of gearbox Note Action CAUTION The gearbox weighs 160 kg. All lifting accessories used must be sized accordingly. 1 Lifting accessories axes-2 and axis-3 gearboxes: Attach the lifting accessories to the gear- box. 2 Roundsling 2 m: Lifting capacity: 2,000 kg (2 pcs) Attach a ro...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
735
Robot position Note Action Note ![Image] Make sure that the position of the robot has not been changed. Correct position is cal- ibration position. 1 Preparations before refitting the gearbox Note Action ![Image] xx1500002342 Use caution and lift the gearbox up and let it rest on its side. CAUTION Make sure the gearbox...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
736
Note Action Grease ![Image] xx1500002341 Apply some grease on the thin chamfer on the gearbox. 4 Mounting set gear (axis 2 and 3), 3HAC059801-001 ![Image] xx1500002361 Fit guide pins as shown in the figure. 5 Apply some grease on the guide pins for a better fitting. 6 Attaching lifting accessories to the gearbox Note A...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
737
Note Action Lifting accessory, gearbox: 3HAC054404- 001 ![Image] xx1600001554 Attach the lifting accessories to the gear- box. 2 Roundsling 2 m: Lifting capacity: 2,000 kg (2 pcs) Attach a roundsling to the lifting accessor- ies. 3 Attach the roundslings to an overhead crane (or similar) and raise to take the weight of...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
738
Note Action Mercasol ![Image] xx1500002350 Apply Mercasol on the surface of the sealing ring. Note Make sure that the sealing ring is attached cor- rectly on the gearbox. 2 ![Image] xx1500002338 Lift the gearbox up onto the guide pins. 3 ![Image] xx1500002347 Note The axis-3 gearbox shall, on the side shown in the figu...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
739
Attaching the axis-3 gearbox to parallel arm - screws in area 3 Note Action ![Image] 1 2 3 1 2 3 xx1500002974 Find area 3. 1 ![Image] xx1500002344 Make sure that the hole pattern of the three areas of attachment screws, will match. If the hole pattern is not matching, use extreme caution and turn the small gear in the ...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
740
Refitting the motor flange Note Action ![Image] xx1500002347 Remove the three M16x130 screws and six-hole washers, previously attached in a triangle. 1 Clean the contact surfaces on gearbox and motor flange. 2 ![Image] xx1500002353 Clean o-rings and o-ring groove on gearbox. 3 Inspect the o-rings. Replace if damaged! 4...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
741
Note Action Make sure the o-rings are in position and slide the motor flange into position. 10 ![Image] xx1600000068 Note When the four six-hole washers are fitted, make sure that the three holes in the gearbox will be covered. See figure! 11 Attachment screws: M16x130 12.9 Gleitmo 603 ![Image] xx1500002355 Attach 20 o...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
742
Securing the axis-3 gearbox to parallel arm - screws in area 3 Note Action ![Image] 1 2 3 1 2 3 xx1500002974 Find area 3. 1 Tightening torque: 300 Nm Secure the already attached screws, in area 3. 2 Tip To make sure that all screws in this area are torqued, use a marker pen and mark each screw after it has been torqued...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
743
Note Action ![Image] xx1500002082 Examine the pinion and the splines in the hub for damages. 5 Grease: Castrol Molub. Alloy 777-1 NG ![Image] xx1500002346 Make sure that there is enough grease on the splines before fitting. If not, apply 3 gram of grease. 6 Refitting the hub Note Action Attachment screws: M6x110 (2 pcs...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
744
Note Action ![Image] xx1500002326 Refit the hub. 3 Attachment screws: M6x30 12.9. Remove the two M6x110 and fit the attach- ment screws for the hub. 4 Loctite 243 Apply locking liquid (Loctite 243) on the screws. Note The number of attachment screws differ depending on gearbox. Quantity: • Axis-1 = 6 pcs • Axis-2 = 8 p...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
745
Note Action O-ring, 3HAB3772-107 ![Image] xx1200001019 Inspect the o-ring. Note Replace if damaged. 4 ![Image] xx1200001020 Make sure the o-ring is seated in the groove. Tip Lubricate the o-ring with some grease for a better fitting in the groove. 5 Flange sealant: Loctite 574 ![Image] xx1500002357 Apply flange sealant...
ABB_IRB8700_Product_Manual.pdf
https://search.abb.com/library/Download.aspx?DocumentID=3HAC052853-001&LanguageCode=en&DocumentPartId=&Action=Launch&DocumentRevisionId=D
746
Note Action ![Image] xx1200001135 If the motor is a new spare part, remove the cover. 7 Securing the axis-3 motor Note Action Guide pin, M10x150: 3HAC15521-2 Fit guide pins in opposite holes. 1 Always use guide pins in pairs. CAUTION The motor weighs 27 kg. All lifting accessories used must be sized accordingly! 2 Lift...