原文
stringlengths
1
149
译文
stringlengths
1
99
tunnel illumination or tunnel lighting
隧道照明
tunnel anti-disaster equipment
隧道防灾设施
refuge hole or refuge recess or refuge niche
避车洞
tunnel fire hazard
隧道火灾
tunnel warning equipment
隧道报警装置
tunnel fire-fighting system
隧道消防系统
tunnel gas explosion
隧道瓦斯爆炸
tunnel monitoring measurement
隧道监控量测
tunnel ground subsidence
隧道地表沉降
tunnel arch top settlement
隧道拱顶下沉
tunnel floor heave
隧道底鼓
tunnel perimeter deflection
隧道周边位移
tunnel surrounding mass deflection
隧道地中位移
tunnel reconstruction
隧道改建
under cut of tunnel
隧道落底
top picking of tunnel
隧道挑顶
cover arch of tunnel
隧道套拱
construction investigation
施工调查
construction preparation
施工准备
expropriation
征地
removing
拆迁
rented land
租地
delivery-receiving stake
交接桩
construction repetition or repetive survey or construction repetition survey
施工复测
staking out in survey
测量放样
cut-fill transition
土石方调配
volume diagram of earth-rock work
土石方体积图 or 土积图
hidden project or hidden construction work
隐蔽工程
abandoned project or abandoned construction work
废弃工程
engineering transportation
工程运输
cold weather construction or winter season construction
冬季施工
raining season construction or rainy season construction
雨季施工
calling for tenders of project or calling for tending of project
工程招标
bidding for project
工程投标
project quoted price
工程报价
contracting out of project
工程发包
contracting of project
工程承包
supervision of construction or supervision of project
工程监理
total budget
总预算
individual budget
单项预算
total output of building industry
建筑业总产值
design for guiding construction organization or guiding design for construction scheme
指导性施工组织设计
design for practical construction organization or practical design ofr construction scheme or operative construction organization design
实施性施工组织设计
temporary project
临时工程
large-scale temporary project
大型临时工程
small-scale temporary project
小型临时工程
transition project
过渡工程
dominant project
控制工程
key project
关键工程
auxiliary facilities
辅助设施
time limit for opening to traffic
通车期限
total time of construction or total construction time
施工总工期
construction scheme
施工组织方案
report on starting of construction work or commencement report of construction work or construction starting report
开工报告
completion repport of construction work
竣工报告
planned manangement of construction
施工计划管理
network planning technique
网络计划技术
construction technology process or construction process
施工工艺流程
construction method system
工法制度
construction output value
施工产值
construction profit
施工利润
utilization ratio of construction machinery
施工机械利用率
ratio of construction machinery in good condition
施工机械完好率
construction figuue progress or figurative progress of construction work
施工形象进度
excavating machine or excavator
挖掘机
power shovel
单斗挖土机
dragline
索铲挖土机
backhoe
反铲挖土机
clamshell bucket
蛤壳式抓斗
bulldozer
推土机
scoper or scraper or carrying scraper
铲运机
loader
装载机
belt conveyer
带式输送机
grader
平地机
vibration compactor vibration roller
振动碾压机
roller
压路机
diving drill
潜孔钻机
air hammer drill or rock drill
凿岩机
crusher
碎石机
trench cutting machine or trenching machine or trencher
挖沟机
tower crane or column crane
塔式起重机
automobile crane or autocrane or truck crane
汽车式起重机
rubber tired crane or rough-terrain crane
轮胎式起重机
crawler crane or caterpiller crane
履带式起重机
track crane or rail crane
轨道起重机
floating crane
浮式起重机 or 浮吊
cable crane
缆索起重机
aerial ropway
空中索道
electric winch
电动卷扬机
electric hoist
电动吊车 or 电动葫芦
jack
千斤顶
pile driver
打桩机
steam pile driver or steam pile hammer
蒸汽打桩机
diesel pile driver
柴油打桩机
hydraulic pile driver
液压打桩机
vibrating pile driver or vibratory driver
振动打桩机
vibro-driver extractor
振动沉拨桩机
static pressure pile extractor or static pressure pile drawing machine
静压力拨桩机
crawler pile frame
履带式桩架
swiveling drill machine or rotary drill machine
旋转式钻机