hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.1 Intrafrequency System information acquisition for CSG cell
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.1.1 Definition and applicability
For intra frequency CSG cells, CSG SI decoding is typically triggered when a cell with primary scrambling code in a preconfigured range meets the criteria for measurement reporting. For intra frequency system information acquisition, interruption in downlink reception or uplink transmission shall not be performed to ac...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.1.2 Minimum requirement
The CSG SI reporting delay shall not be more than TCSG-SI-Report where TCSG-SI-Report in ms is given by TCSG-SI-Report = [630]+ 40*SIB3_REP SIB3_REP is the repetition period at which the CSG cell schedules SIB3 blocks in units of frames This requirement is applicable for CSG target cell configurations where the informa...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.1.3 Test purpose
The purpose of this test is to verify the requirement for intra frequency CSG SI acquisition in section 8.3.10.1.2.
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.1.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.1.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. The test parameters are given in Table 8.3.10.1.1 and 8.3.10.1.2 below. In the measurement control information cell 2 shall be included in the "Intra-frequency SI Acquisition" IE. The test consists of two succe...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.1.4.2 Procedure
1) The RF parameters are set up according to T1 in Table 8.3.10.1.3. 2) The UE is switched on. 3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4. 4) SS shall send a MEASUREMENT CONTROL message (event 1A) on Cell 1. Cell 2 is included in the "Intra-frequency SI Acquisition" I...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.1.5 Test requirements
For the test to pass, the total number of successful tests shall be at least 90% of the cases with a confidence level of 95 %. Table 8.3.10.1.3: Cell specific test parameters for intra frequency CSG SI acquisition Parameter Unit Cell 1 Cell 2 T1 T2 T1 T2 CPICH_Ec/Ior dB -9.3 -9.3 PCCPCH_Ec/Ior dB -11.3 -11.3 SCH_Ec/Ior...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.2 Inter frequency System information acquisition for CSG cell
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.2.1 Definition and applicability
For inter frequency CSG cells, CSG SI decoding is explicitly requested by RRC signalling. For the inter frequency case the UE may make autonomous gaps in both downlink reception and uplink transmission. The requirements in this section apply to a FDD UE release 9 and forward which supports CSG and inter-frequency syste...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.2.2 Minimum requirement
When inter frequency CSG SI decoding of a neighbour cell is requested by UTRAN, the UE may interrupt ongoing downlink reception, and uplink transmission to perform the decoding on another frequency. The total of the gaps in reception and the total of the gaps in transmission during the period TCSG-SI-Report shall not e...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.2.3 Test purpose
The purpose of this test is to verify the requirement for inter frequency CSG SI acquisition in section 8.3.10.2.2.
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.2.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.2.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. The test parameters are given in Table 8.3.10.2.1 and 8.3.10.2.2 below. The test consists of three successive time periods, with a time duration T1, T2 and T3. In the measurement control information it is indic...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.2.4.2 Procedure
1) The RF parameters are set up according to T1 in Table 8.3.10.2.3. 2) The UE is switched on. 3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4 with Compressed mode parameters as in Table 8.3.10.2.1. The compressed mode shall remain inactive. Data shall be sent on the DTCH ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.3.10.2.5 Test requirements
For the test to pass, the total number of successful tests shall be at least 90% of the cases with a confidence level of 95 %. Table 8.3.10.2.3: Cell Specific parameters for Handover to inter-frequency cell Parameter Unit Cell 1 Cell 2 T1 T2 T3 T1 T2 T3 UTRA RF Channel Number Channel 1 Channel 2 CPICH_Ec/Ior dB -9.2 -9...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4 RRC Connection Control
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1 RRC Re-establishment delay
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.1 Test 1
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.1.1 Definition and applicability
The UE Re-establishment delay requirement (TUE-RE-ESTABLISH-REQ) is defined as the time between the moment when radio link failure is considered by the UE, to when the UE starts to send preambles on the PRACH. TUE-RE-ESTABLISH-REQ is depending on whether the target cell is known by the UE or not. A cell is known if eit...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.1.2 Minimum requirement
The Re-establishment delay TRE-ESTABLISH to a known cell shall be less than 1.9 s. The rate of correct RRC re-establishments observed during repeated tests shall be at least 90%. NOTE: The Re-establishment delay in this case can be expressed as TRE-ESTABLISH= TRRC-RE-ESTABLISH+ TUE-RE-ESTABLISH-REQ-KNOWN. where TRRC-RE...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.1.3 Test purpose
To verify that the UE meets the minimum requirement.
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.1.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.1.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. The test parameters are given in table 8.4.1.1, table 8.4.1.1.A , and table 8.4.1.2 below. The maximum repetition period of the relevant system info blocks that needs to be received by the UE to camp on a cell ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.1.4.2 Procedure
1) The RF parameters are set up according to T0. 2) The UE is switched on. 3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4 without Compressed mode parameters. 4) The RF parameters are setup according to T1. 5) 10 s after step4 has completed, the parameters are changed to ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.1.5 Test requirements
For the test to pass, the total number of successful tests shall be more than 90% of the cases with a confidence level of 95%. Note: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.2 Test 2
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.2.1 Definition and applicability
The UE Re-establishment delay requirement (TUE-E-ESTABLISH-REQ) is defined as the time between the moment when radio link failure is considered by the UE, to when the UE starts to send preambles on the PRACH. TUE-RE-ESTABLISH-REQ is depending on whether the target cell is known by the UE or not. A cell is known if eith...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.2.2 Minimum requirement
The rate of correct RRC re-establishments observed during repeated tests shall be at least 90%. NOTE: The Re-establishment delay in this case can be expressed as TRE-ESTABLISH= TRRC-RE-ESTABLISH+ TUE-RE-ESTABLISH-REQ-UNKNOWN. where TRRC-RE-ESTABLISH= 160ms+(N313-1)*10ms+T313 TUE-RE-ESTABLISH-REQ-UNKNOWN=50ms+Tsearch*NF...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.2.3 Test purpose
To verify that the UE meets the minimum requirement.
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.2.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.2.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. The test parameters are given in table 8.4.1.3 and table 8.4.1.4 below. The maximum repetition period of the relevant system info blocks that needs to be received by the UE to camp on a cell shall be 1280 ms. A...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.2.4.2 Procedure
1) The RF parameters are set up according to T1. 2) The UE is switched on. 3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4 without Compressed mode parameters. 4) 10 s after step3 has completed, the parameters are changed to that as described for T2. 5) If the UE responds o...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.1.2.5 Test requirements
For the test to pass, the total number of successful tests shall be more than 90% of the cases with a confidence level of 95%. Note: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2 Random Access
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.1 Correct behaviour when receiving an ACK (Release 5 and earlier)
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.1.1 Definition and applicability
The random access procedure is used when establishing the layer 1 communication between the UE and UTRAN. The random access shall provide a fast access but without disturbing ongoing connections. The random access is specified in clause 6 of TS 25.214 [5] and the control of the RACH transmission is specified in clause ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.1.2 Minimum Requirements
The UE shall have capability to calculate initial power according to the open loop algorithm and apply this power level at the first preamble and increase the power on additional preambles. The absolute power applied to the first preamble shall have an accuracy as specified in table 6.3 of TS 25.101 [1]. The relative p...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.1.3 Test purpose
The purpose of this test is to verify that the behaviour of the random access procedure is according to the requirements and that the PRACH power settings are within specified limits.
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.1.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.1.4.1 Initial conditions
Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect the SS to the UE antenna connector as shown in figure A.1 in the case of the PRACH power measurement. And in the case of the function test of the random access procedure, ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.1.4.2 Procedure
1) A call is set up according to the Generic call setup procedure. The test parameters are set up according to table 8.4.2.1.1, table 8.4.2.1.2 and table 8.4.2.1.3. The PRACH procedure within the call setup is used for the test. It is necessary that an ACK on the AICH shall be transmitted after 10 preambles have been r...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.1.5 Test requirements
The accuracy of the first preamble as specified in clause 6.4.1.1 of TS 25.101 [1] shall not be verified in this test. It is verified under the section 5.4.1, Open loop power control. There are two relative powers, one is the power difference for preamble ramping and another is the power difference between last preambl...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.2 Correct behaviour when receiving an NACK
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.2.1 Definition and applicability
The random access procedure is used when establishing the layer 1 communication between the UE and UTRAN. The random access shall provide a fast access but without disturbing ongoing connections. The random access is specified in clause 6 of TS 25.214 and the control of the RACH transmission is specified in clause 11.2...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.2.2 Minimum Requirements
The UE shall stop transmitting preambles upon a NACK on the AICH has been received and then repeat the ramping procedure when the back off timer TB01 expires. The UE shall transmit 10 preambles in the first ramping cycle and no transmission shall be done by the UE within 100 ms after the NACK has been transmitted by th...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.2.3 Test purpose
The purpose of this test is to verify that the behaviour of the random access procedure is according to the requirements.
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.2.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.2.4.1 Initial conditions
Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect the SS to the UE antenna connector as shown in figure A.8. A spectrum analyzer is set to 0 span mode. See TS 34.108 [3] for details regarding generic call setup procedure.
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.2.4.2 Procedure
1) A call is set up according to the Generic call setup procedure. The test parameters are set up according to table 8.4.2.1.1, table 8.4.2.1.2 and table 8.4.2.1.3. The PRACH procedure within the call setup is used for the test. It is necessary that an NACK on the AICH shall be transmitted after 10 preambles have been ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.2.5 Test requirements
The UE shall stop transmitting preambles upon a NACK on the AICH has been received and then repeat the ramping procedure when the back off timer TB01 expires. The UE shall transmit 10 preambles in the first ramping cycle and no transmission shall be done by the UE within 100 ms after the NACK has been transmitted by th...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.3 Correct behaviour at Time-out
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.3.1 Definition and applicability
The random access procedure is used when establishing the layer 1 communication between the UE and UTRAN. The random access shall provide a fast access but without disturbing ongoing connections. The random access is specified in clause 6 of TS 25.214 and the control of the RACH transmission is specified in clause 11.2...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.3.2 Minimum Requirements
The UE shall stop transmit preambles when reaching the maximum number of preambles allowed in a cycle. The UE shall then repeat the ramping procedure until the maximum number of preamble ramping cycles are reached. No ACK/NACK shall be sent by SS during this test. The UE shall transmit 2 preambles cycles, consisting of...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.3.3 Test purpose
The purpose of this test is to verify that the behaviour of the random access procedure is according to the requirements.
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.3.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.3.4.1 Initial conditions
Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect the SS to the UE antenna connector as shown in figure A.8. A spectrum analyzer is set to 0 span mode. See TS 34.108 [3] for details regarding generic call setup procedure.
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.3.4.2 Procedure
1) A call is set up according to the Generic call setup procedure. The test parameters are set up according to table 8.4.2.1.1, table 8.4.2.1.2, and table 8.4.2.1.3. The PRACH procedure within the call setup is used for the test. It is necessary that SS shall transmit no AICH. 2) Measure the number of the preamble part...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.3.5 Test requirements
The UE shall stop transmit preambles when reaching the maximum number of preambles allowed in a cycle. The UE shall then repeat the ramping procedure until the maximum number of preamble ramping cycles are reached. No ACK/NACK shall be sent by SS during this test. The UE shall transmit 2 preambles cycles, consisting of...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.4 Correct behaviour when reaching maximum transmit power
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.4.1 Definition and applicability
The random access procedure is used when establishing the layer 1 communication between the UE and UTRAN. The random access shall provide a fast access but without disturbing ongoing connections. The random access is specified in clause 6 of TS 25.214 [5] and the control of the RACH transmission is specified in clause ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.4.2 Minimum Requirements
The UE shall not exceed the maximum allowed UL TX power, which is specified in Table 8.4.2.4.1 and configured by the SS, with more than the accuracy tolerances as defined in section 6.5 of TS 25.133 [2]. Section 6.5 of TS25.133 [2] states that for UE output powers that are outside the range covered by the UE transmitte...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.4.3 Test purpose
The purpose of this test is to verify that the PRACH power behaviour when reaching Maximum allowed UL TX power is correct.
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.4.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.4.4.1 Initial condition
Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect the SS to the UE antenna connector as shown in figure A.1. See TS 34.108 [3] for details regarding generic call setup procedure. Table 8.4.2.4.1: UE parameters for correct...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.4.4.2 Procedure
1) A call is set up according to the Generic call setup procedure. The test parameters are set up according to table 8.4.2.1.1, table 8.4.2.4.1 and table 8.4.2.1.3. The PRACH procedure within the call setup is used for the test. It is necessary that SS shall transmit no AICH. 2) Set the TX output level of the SS to obt...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.2.4.5 Test requirements
The UE shall not exceed the Maximum allowed UL TX power configured by the SS with more than the tolerance specified in Table 8.4.2.4.2. Table 8.4.2.4.2: Test requirement for maximum preamble power Maximum preamble power Test requirement(normal) 0dBm ±10 dB Test requirement(extreme) 0dBm ±13 dB NOT...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.3 Transport format combination selection in UE
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.3.1 Interactive or Background, PS, UL: 64 kbps
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.3.1.1 Definition and applicability
When the UE estimates that a certain TFC would require more power than the maximum transmit power, it shall limit the usage of transport format combinations for the assigned transport format set, according to the functionality specified in section 11.4 in TS25.321 [13]. This in order to make it possible for the network...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.3.1.2 Minimum requirements
The UE shall continuously evaluate based on the Elimination, Recovery and Blocking criteria defined below, how TFCs on an uplink DPDCH can be used for the purpose of TFC selection. The evaluation shall be performed for every TFC in the TFCS using the estimated UE transmit power of a given TFC. The UE transmit power e...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.3.1.3 Test purpose
The purpose is to verify the UE blocks (stops using) a currently used TFC when the UE output power is not sufficient to support that TFC. The test will verify the general requirement on TFC selection in section 8.4.3.1.2 for a RAB intended for packet data services, i.e. Interactive or Background, PS, UL: 64kbps as defi...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.3.1.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.3.1.4.1 Initial conditions
Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. The test parameters are given in Tables 8.4.3.1.3, 8.4.3.1.4, 8.4.3.1.5 and 8.4.3.1.6 below. The test consists of 2 successive time periods, with a time duration of T1 and T2 respect...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.3.1.4.2 Procedure
1) The SS activates cell 1 with T0 parameters defined in table 8.4.3.1.6. 2) The UE is switched on. 3) An RRC connection is set up according to the generic set-up procedure specified in TS 34.108 [3] subclause 7.3.2, using the test procedure to setup a PS call using the parameters defined in tables 8.4.3.1.3, 8.4.3.1.4...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.3.1.5 Test requirements
For the test to pass, the total number of successful tests shall be more than 90% of the cases with a confidence level of 95%. NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4 E-TFC restriction in UE
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.1 10ms TTI E-DCH E-TFC restriction
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.1.1 Definition and applicability
When the UE estimates that a certain TFC and E-TFC would require more power than the maximum transmit power, it shall limit the usage of transport format combinations for the assigned transport format set, according to the functionality specified in section 11.8.1.4 in TS25.321 [13]. This is in order to make it possibl...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.1.2 Minimum requirements
The UE shall continuously evaluate based on the Elimination, Recovery and Blocking criteria defined below, how TFCs on an uplink DPDCH can be used for the purpose of TFC selection. The evaluation shall be performed for every TFC in the TFCS using the estimated UE transmit power. The UE transmit power estimation for a g...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.1.3 Test Purpose
The purpose is to verify the UE stops using a currently used E-TFC when its remaining power margin is not sufficient to support that E-TFC, and resumes using that E-TFC when its remaining power margin is sufficient to support it. This test will verify the general requirement on E-TFC selection in section 8.4.4.1.2 for ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.1.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.1.4.1 Initial conditions
Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect the SS (node B emulator) to the UE antenna connector as shown in figure A.1. 2) The UL Reference Measurement Channel and the Fixed Reference Channels (FRC H-Set 1, QPSK) a...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.1.4.2 Procedure
1) The SS activates cell 1 with T0 parameters defined in table 8.4.4.1.4. 2) The UE is switched on. 3) An E-DCH call is set up according to TS 34.108 [3] 7.3.9 with the following exceptions in the RADIO BEARER SETUP messages. These exceptions are derived from Table 8.4.4.1.3, and in addition allow the beta values to be...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.1.5 Test Requirements
For the test to pass, the ETFCI recovery success ratio shall be more than 90%, and also the ETFCI restriction success ratio shall be more than 90%, each with a confidence level of 95%. Table 8.4.4.1.6: Cell specific test parameters Parameter Unit Cell 1 T0 T1 T2 UTRA RF Channel Number Channel 1 P-CPICH -9.9 PCCPCH dB -...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.2 2ms TTI E-DCH E-TFC restriction
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.2.1 Definition and applicability
When the UE estimates that a certain TFC and E-TFC would require more power than the maximum transmit power, it shall limit the usage of transport format combinations for the assigned transport format set, according to the functionality specified in section 11.8.1.4 in TS25.321 [13]. This is in order to make it possibl...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.2.2 Minimum requirements
The UE shall continuously evaluate based on the Elimination, Recovery and Blocking criteria defined below, how TFCs on an uplink DPDCH can be used for the purpose of TFC selection. The evaluation shall be performed for every TFC in the TFCS using the estimated UE transmit power. The UE transmit power estimation for a g...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.2.3 Test Purpose
The purpose is to verify the UE stops using a currently used E-TFC when its remaining power margin is not sufficient to support that E-TFC, and resumes using that E-TFC when its remaining power margin is sufficient to support it. This test will verify the general requirement on E-TFC selection in section 8.4.4.2.2 for ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.2.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.2.4.1 Initial conditions
Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect the SS (node B emulator) to the UE antenna connector as shown in figure A.1. 2) The UL Reference Measurement Channel and the Fixed Reference Channels (FRC H-Set 1, QPSK) a...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.2.4.2 Procedure
1) The SS activates cell 1 with T0 parameters defined in table 8.4.4.2.4. 2) The UE is switched on. 3) An E-DCH call is set up according to TS 34.108 [3] 7.3.9 with the following exceptions in the RADIO BEARER SETUP messages. These exceptions are derived from Table 8.4.4.2.3, and in addition allow the beta values to be...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.4.4.2.5 Test Requirements
For the test to pass, the ETFCI recovery success ratio shall be more than 90%, and also the ETFCI restriction success ratio shall be more than 90%, each with a confidence level of 95%. Table 8.4.4.2.6: Additional cell specific test parameters Parameter Unit Cell 1 T0 T1 T2 UTRA RF Channel Number Channel 1 P-CPICH -9.9 ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.5 Timing and Signalling Characteristics
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.5.1 UE Transmit Timing
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.5.1.1 Definition and applicability
The UE transmit timing is defined as the timing of the uplink DPCCH/DPDCH frame relative to the first detected path (in time) of the corresponding downlink DPCCH/DPDCH frame from the reference cell. The reference point is the antenna connector of the UE. The requirements and this test apply to all types of UTRA of the ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.5.1.2 Minimum requirements
The UE initial transmission timing error shall be less than or equal to 1.5 chips. This requirement applies at the first transmission on the DPCCH/DPDCH. The reference point for the UE initial transmit timing control requirement shall be the time when the first detected path (in time) of the corresponding downlink DPC...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.5.1.3 Test purpose
The purpose of this test is to: 1) Verify that the UE initial transmit timing accuracy is within the limits specified in 8.5.1.5. 2) Verify that the UE transmit timing accuracy remains within the limits specified in 8.5.1.5 when the timing of a cell in the active set not used as the reference cell changes its timing. 3...
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.5.1.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
8.5.1.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. For this test, two cells on the same frequency are used. The reporting of event 1A and event 1B is configured with SIB 11. 1) Connect the test system to the UE antenna connector as shown in figure A.14. Table 8...