hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.1 Intrafrequency System information acquisition for CSG cell | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.1.1 Definition and applicability | For intra frequency CSG cells, CSG SI decoding is typically triggered when a cell with primary scrambling code in a preconfigured range meets the criteria for measurement reporting. For intra frequency system information acquisition, interruption in downlink reception or uplink transmission shall not be performed to ac... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.1.2 Minimum requirement | The CSG SI reporting delay shall not be more than TCSG-SI-Report where TCSG-SI-Report in ms is given by
TCSG-SI-Report = [630]+ 40*SIB3_REP
SIB3_REP is the repetition period at which the CSG cell schedules SIB3 blocks in units of frames
This requirement is applicable for CSG target cell configurations where the informa... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.1.3 Test purpose | The purpose of this test is to verify the requirement for intra frequency CSG SI acquisition in section 8.3.10.1.2. |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.1.4 Method of test | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.1.4.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
The test parameters are given in Table 8.3.10.1.1 and 8.3.10.1.2 below. In the measurement control information cell 2 shall be included in the "Intra-frequency SI Acquisition" IE. The test consists of two succe... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.1.4.2 Procedure | 1) The RF parameters are set up according to T1 in Table 8.3.10.1.3.
2) The UE is switched on.
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4.
4) SS shall send a MEASUREMENT CONTROL message (event 1A) on Cell 1. Cell 2 is included in the "Intra-frequency SI Acquisition" I... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.1.5 Test requirements | For the test to pass, the total number of successful tests shall be at least 90% of the cases with a confidence level of 95 %.
Table 8.3.10.1.3: Cell specific test parameters for intra frequency CSG SI acquisition
Parameter
Unit
Cell 1
Cell 2
T1
T2
T1
T2
CPICH_Ec/Ior
dB
-9.3
-9.3
PCCPCH_Ec/Ior
dB
-11.3
-11.3
SCH_Ec/Ior... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.2 Inter frequency System information acquisition for CSG cell | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.2.1 Definition and applicability | For inter frequency CSG cells, CSG SI decoding is explicitly requested by RRC signalling. For the inter frequency case the UE may make autonomous gaps in both downlink reception and uplink transmission.
The requirements in this section apply to a FDD UE release 9 and forward which supports CSG and inter-frequency syste... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.2.2 Minimum requirement | When inter frequency CSG SI decoding of a neighbour cell is requested by UTRAN, the UE may interrupt ongoing downlink reception, and uplink transmission to perform the decoding on another frequency. The total of the gaps in reception and the total of the gaps in transmission during the period TCSG-SI-Report shall not e... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.2.3 Test purpose | The purpose of this test is to verify the requirement for inter frequency CSG SI acquisition in section 8.3.10.2.2. |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.2.4 Method of test | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.2.4.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
The test parameters are given in Table 8.3.10.2.1 and 8.3.10.2.2 below. The test consists of three successive time periods, with a time duration T1, T2 and T3. In the measurement control information it is indic... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.2.4.2 Procedure | 1) The RF parameters are set up according to T1 in Table 8.3.10.2.3.
2) The UE is switched on.
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4 with Compressed mode parameters as in Table 8.3.10.2.1. The compressed mode shall remain inactive. Data shall be sent on the DTCH ... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.3.10.2.5 Test requirements | For the test to pass, the total number of successful tests shall be at least 90% of the cases with a confidence level of 95 %.
Table 8.3.10.2.3: Cell Specific parameters for Handover to inter-frequency cell
Parameter
Unit
Cell 1
Cell 2
T1
T2
T3
T1
T2
T3
UTRA RF Channel Number
Channel 1
Channel 2
CPICH_Ec/Ior
dB
-9.2
-9... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4 RRC Connection Control | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1 RRC Re-establishment delay | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.1 Test 1 | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.1.1 Definition and applicability | The UE Re-establishment delay requirement (TUE-RE-ESTABLISH-REQ) is defined as the time between the moment when radio link failure is considered by the UE, to when the UE starts to send preambles on the PRACH.
TUE-RE-ESTABLISH-REQ is depending on whether the target cell is known by the UE or not. A cell is known if eit... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.1.2 Minimum requirement | The Re-establishment delay TRE-ESTABLISH to a known cell shall be less than 1.9 s.
The rate of correct RRC re-establishments observed during repeated tests shall be at least 90%.
NOTE: The Re-establishment delay in this case can be expressed as
TRE-ESTABLISH= TRRC-RE-ESTABLISH+ TUE-RE-ESTABLISH-REQ-KNOWN.
where
TRRC-RE... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.1.3 Test purpose | To verify that the UE meets the minimum requirement. |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.1.4 Method of test | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.1.4.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
The test parameters are given in table 8.4.1.1, table 8.4.1.1.A , and table 8.4.1.2 below. The maximum repetition period of the relevant system info blocks that needs to be received by the UE to camp on a cell ... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.1.4.2 Procedure | 1) The RF parameters are set up according to T0.
2) The UE is switched on.
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4 without Compressed mode parameters.
4) The RF parameters are setup according to T1.
5) 10 s after step4 has completed, the parameters are changed to ... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.1.5 Test requirements | For the test to pass, the total number of successful tests shall be more than 90% of the cases with a confidence level of 95%.
Note: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.2 Test 2 | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.2.1 Definition and applicability | The UE Re-establishment delay requirement (TUE-E-ESTABLISH-REQ) is defined as the time between the moment when radio link failure is considered by the UE, to when the UE starts to send preambles on the PRACH.
TUE-RE-ESTABLISH-REQ is depending on whether the target cell is known by the UE or not. A cell is known if eith... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.2.2 Minimum requirement | The rate of correct RRC re-establishments observed during repeated tests shall be at least 90%.
NOTE: The Re-establishment delay in this case can be expressed as
TRE-ESTABLISH= TRRC-RE-ESTABLISH+ TUE-RE-ESTABLISH-REQ-UNKNOWN.
where
TRRC-RE-ESTABLISH= 160ms+(N313-1)*10ms+T313
TUE-RE-ESTABLISH-REQ-UNKNOWN=50ms+Tsearch*NF... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.2.3 Test purpose | To verify that the UE meets the minimum requirement. |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.2.4 Method of test | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.2.4.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
The test parameters are given in table 8.4.1.3 and table 8.4.1.4 below. The maximum repetition period of the relevant system info blocks that needs to be received by the UE to camp on a cell shall be 1280 ms. A... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.2.4.2 Procedure | 1) The RF parameters are set up according to T1.
2) The UE is switched on.
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4 without Compressed mode parameters.
4) 10 s after step3 has completed, the parameters are changed to that as described for T2.
5) If the UE responds o... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.1.2.5 Test requirements | For the test to pass, the total number of successful tests shall be more than 90% of the cases with a confidence level of 95%.
Note: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2 Random Access | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.1 Correct behaviour when receiving an ACK (Release 5 and earlier) | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.1.1 Definition and applicability | The random access procedure is used when establishing the layer 1 communication between the UE and UTRAN. The random access shall provide a fast access but without disturbing ongoing connections. The random access is specified in clause 6 of TS 25.214 [5] and the control of the RACH transmission is specified in clause ... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.1.2 Minimum Requirements | The UE shall have capability to calculate initial power according to the open loop algorithm and apply this power level at the first preamble and increase the power on additional preambles. The absolute power applied to the first preamble shall have an accuracy as specified in table 6.3 of TS 25.101 [1]. The relative p... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.1.3 Test purpose | The purpose of this test is to verify that the behaviour of the random access procedure is according to the requirements and that the PRACH power settings are within specified limits. |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.1.4 Method of test | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.1.4.1 Initial conditions | Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
1) Connect the SS to the UE antenna connector as shown in figure A.1 in the case of the PRACH power measurement. And in the case of the function test of the random access procedure, ... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.1.4.2 Procedure | 1) A call is set up according to the Generic call setup procedure. The test parameters are set up according to table 8.4.2.1.1, table 8.4.2.1.2 and table 8.4.2.1.3. The PRACH procedure within the call setup is used for the test. It is necessary that an ACK on the AICH shall be transmitted after 10 preambles have been r... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.1.5 Test requirements | The accuracy of the first preamble as specified in clause 6.4.1.1 of TS 25.101 [1] shall not be verified in this test. It is verified under the section 5.4.1, Open loop power control.
There are two relative powers, one is the power difference for preamble ramping and another is the power difference between last preambl... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.2 Correct behaviour when receiving an NACK | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.2.1 Definition and applicability | The random access procedure is used when establishing the layer 1 communication between the UE and UTRAN. The random access shall provide a fast access but without disturbing ongoing connections. The random access is specified in clause 6 of TS 25.214 and the control of the RACH transmission is specified in clause 11.2... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.2.2 Minimum Requirements | The UE shall stop transmitting preambles upon a NACK on the AICH has been received and then repeat the ramping procedure when the back off timer TB01 expires.
The UE shall transmit 10 preambles in the first ramping cycle and no transmission shall be done by the UE within 100 ms after the NACK has been transmitted by th... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.2.3 Test purpose | The purpose of this test is to verify that the behaviour of the random access procedure is according to the requirements. |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.2.4 Method of test | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.2.4.1 Initial conditions | Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
1) Connect the SS to the UE antenna connector as shown in figure A.8. A spectrum analyzer is set to 0 span mode.
See TS 34.108 [3] for details regarding generic call setup procedure. |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.2.4.2 Procedure | 1) A call is set up according to the Generic call setup procedure. The test parameters are set up according to table 8.4.2.1.1, table 8.4.2.1.2 and table 8.4.2.1.3. The PRACH procedure within the call setup is used for the test. It is necessary that an NACK on the AICH shall be transmitted after 10 preambles have been ... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.2.5 Test requirements | The UE shall stop transmitting preambles upon a NACK on the AICH has been received and then repeat the ramping procedure when the back off timer TB01 expires.
The UE shall transmit 10 preambles in the first ramping cycle and no transmission shall be done by the UE within 100 ms after the NACK has been transmitted by th... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.3 Correct behaviour at Time-out | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.3.1 Definition and applicability | The random access procedure is used when establishing the layer 1 communication between the UE and UTRAN. The random access shall provide a fast access but without disturbing ongoing connections. The random access is specified in clause 6 of TS 25.214 and the control of the RACH transmission is specified in clause 11.2... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.3.2 Minimum Requirements | The UE shall stop transmit preambles when reaching the maximum number of preambles allowed in a cycle. The UE shall then repeat the ramping procedure until the maximum number of preamble ramping cycles are reached. No ACK/NACK shall be sent by SS during this test.
The UE shall transmit 2 preambles cycles, consisting of... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.3.3 Test purpose | The purpose of this test is to verify that the behaviour of the random access procedure is according to the requirements. |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.3.4 Method of test | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.3.4.1 Initial conditions | Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
1) Connect the SS to the UE antenna connector as shown in figure A.8. A spectrum analyzer is set to 0 span mode.
See TS 34.108 [3] for details regarding generic call setup procedure. |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.3.4.2 Procedure | 1) A call is set up according to the Generic call setup procedure. The test parameters are set up according to table 8.4.2.1.1, table 8.4.2.1.2, and table 8.4.2.1.3. The PRACH procedure within the call setup is used for the test. It is necessary that SS shall transmit no AICH.
2) Measure the number of the preamble part... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.3.5 Test requirements | The UE shall stop transmit preambles when reaching the maximum number of preambles allowed in a cycle. The UE shall then repeat the ramping procedure until the maximum number of preamble ramping cycles are reached. No ACK/NACK shall be sent by SS during this test.
The UE shall transmit 2 preambles cycles, consisting of... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.4 Correct behaviour when reaching maximum transmit power | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.4.1 Definition and applicability | The random access procedure is used when establishing the layer 1 communication between the UE and UTRAN. The random access shall provide a fast access but without disturbing ongoing connections. The random access is specified in clause 6 of TS 25.214 [5] and the control of the RACH transmission is specified in clause ... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.4.2 Minimum Requirements | The UE shall not exceed the maximum allowed UL TX power, which is specified in Table 8.4.2.4.1 and configured by the SS, with more than the accuracy tolerances as defined in section 6.5 of TS 25.133 [2].
Section 6.5 of TS25.133 [2] states that for UE output powers that are outside the range covered by the UE transmitte... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.4.3 Test purpose | The purpose of this test is to verify that the PRACH power behaviour when reaching Maximum allowed UL TX power is correct. |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.4.4 Method of test | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.4.4.1 Initial condition | Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
1) Connect the SS to the UE antenna connector as shown in figure A.1.
See TS 34.108 [3] for details regarding generic call setup procedure.
Table 8.4.2.4.1: UE parameters for correct... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.4.4.2 Procedure | 1) A call is set up according to the Generic call setup procedure. The test parameters are set up according to table 8.4.2.1.1, table 8.4.2.4.1 and table 8.4.2.1.3. The PRACH procedure within the call setup is used for the test. It is necessary that SS shall transmit no AICH.
2) Set the TX output level of the SS to obt... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.2.4.5 Test requirements | The UE shall not exceed the Maximum allowed UL TX power configured by the SS with more than the tolerance specified in Table 8.4.2.4.2.
Table 8.4.2.4.2: Test requirement for maximum preamble power
Maximum preamble power
Test requirement(normal)
0dBm ±10 dB
Test requirement(extreme)
0dBm ±13 dB
NOT... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.3 Transport format combination selection in UE | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.3.1 Interactive or Background, PS, UL: 64 kbps | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.3.1.1 Definition and applicability | When the UE estimates that a certain TFC would require more power than the maximum transmit power, it shall limit the usage of transport format combinations for the assigned transport format set, according to the functionality specified in section 11.4 in TS25.321 [13]. This in order to make it possible for the network... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.3.1.2 Minimum requirements | The UE shall continuously evaluate based on the Elimination, Recovery and Blocking criteria defined below, how TFCs on an uplink DPDCH can be used for the purpose of TFC selection. The evaluation shall be performed for every TFC in the TFCS using the estimated UE transmit power of a given TFC. The UE transmit power e... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.3.1.3 Test purpose | The purpose is to verify the UE blocks (stops using) a currently used TFC when the UE output power is not sufficient to support that TFC. The test will verify the general requirement on TFC selection in section 8.4.3.1.2 for a RAB intended for packet data services, i.e. Interactive or Background, PS, UL: 64kbps as defi... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.3.1.4 Method of test | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.3.1.4.1 Initial conditions | Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
The test parameters are given in Tables 8.4.3.1.3, 8.4.3.1.4, 8.4.3.1.5 and 8.4.3.1.6 below. The test consists of 2 successive time periods, with a time duration of T1 and T2 respect... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.3.1.4.2 Procedure | 1) The SS activates cell 1 with T0 parameters defined in table 8.4.3.1.6.
2) The UE is switched on.
3) An RRC connection is set up according to the generic set-up procedure specified in TS 34.108 [3] subclause 7.3.2, using the test procedure to setup a PS call using the parameters defined in tables 8.4.3.1.3, 8.4.3.1.4... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.3.1.5 Test requirements | For the test to pass, the total number of successful tests shall be more than 90% of the cases with a confidence level of 95%.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4 E-TFC restriction in UE | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.1 10ms TTI E-DCH E-TFC restriction | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.1.1 Definition and applicability | When the UE estimates that a certain TFC and E-TFC would require more power than the maximum transmit power, it shall limit the usage of transport format combinations for the assigned transport format set, according to the functionality specified in section 11.8.1.4 in TS25.321 [13]. This is in order to make it possibl... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.1.2 Minimum requirements | The UE shall continuously evaluate based on the Elimination, Recovery and Blocking criteria defined below, how TFCs on an uplink DPDCH can be used for the purpose of TFC selection. The evaluation shall be performed for every TFC in the TFCS using the estimated UE transmit power.
The UE transmit power estimation for a g... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.1.3 Test Purpose | The purpose is to verify the UE stops using a currently used E-TFC when its remaining power margin is not sufficient to support that E-TFC, and resumes using that E-TFC when its remaining power margin is sufficient to support it. This test will verify the general requirement on E-TFC selection in section 8.4.4.1.2 for ... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.1.4 Method of test | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.1.4.1 Initial conditions | Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
1) Connect the SS (node B emulator) to the UE antenna connector as shown in figure A.1.
2) The UL Reference Measurement Channel and the Fixed Reference Channels (FRC H-Set 1, QPSK) a... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.1.4.2 Procedure | 1) The SS activates cell 1 with T0 parameters defined in table 8.4.4.1.4.
2) The UE is switched on.
3) An E-DCH call is set up according to TS 34.108 [3] 7.3.9 with the following exceptions in the RADIO BEARER SETUP messages. These exceptions are derived from Table 8.4.4.1.3, and in addition allow the beta values to be... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.1.5 Test Requirements | For the test to pass, the ETFCI recovery success ratio shall be more than 90%, and also the ETFCI restriction success ratio shall be more than 90%, each with a confidence level of 95%.
Table 8.4.4.1.6: Cell specific test parameters
Parameter
Unit
Cell 1
T0
T1
T2
UTRA RF Channel Number
Channel 1
P-CPICH
-9.9
PCCPCH
dB
-... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.2 2ms TTI E-DCH E-TFC restriction | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.2.1 Definition and applicability | When the UE estimates that a certain TFC and E-TFC would require more power than the maximum transmit power, it shall limit the usage of transport format combinations for the assigned transport format set, according to the functionality specified in section 11.8.1.4 in TS25.321 [13]. This is in order to make it possibl... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.2.2 Minimum requirements | The UE shall continuously evaluate based on the Elimination, Recovery and Blocking criteria defined below, how TFCs on an uplink DPDCH can be used for the purpose of TFC selection. The evaluation shall be performed for every TFC in the TFCS using the estimated UE transmit power.
The UE transmit power estimation for a g... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.2.3 Test Purpose | The purpose is to verify the UE stops using a currently used E-TFC when its remaining power margin is not sufficient to support that E-TFC, and resumes using that E-TFC when its remaining power margin is sufficient to support it. This test will verify the general requirement on E-TFC selection in section 8.4.4.2.2 for ... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.2.4 Method of test | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.2.4.1 Initial conditions | Test environment: normal, TL/VL, TL/VH, TH/VL, TH/VH; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
1) Connect the SS (node B emulator) to the UE antenna connector as shown in figure A.1.
2) The UL Reference Measurement Channel and the Fixed Reference Channels (FRC H-Set 1, QPSK) a... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.2.4.2 Procedure | 1) The SS activates cell 1 with T0 parameters defined in table 8.4.4.2.4.
2) The UE is switched on.
3) An E-DCH call is set up according to TS 34.108 [3] 7.3.9 with the following exceptions in the RADIO BEARER SETUP messages. These exceptions are derived from Table 8.4.4.2.3, and in addition allow the beta values to be... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.4.4.2.5 Test Requirements | For the test to pass, the ETFCI recovery success ratio shall be more than 90%, and also the ETFCI restriction success ratio shall be more than 90%, each with a confidence level of 95%.
Table 8.4.4.2.6: Additional cell specific test parameters
Parameter
Unit
Cell 1
T0
T1
T2
UTRA RF Channel Number
Channel 1
P-CPICH
-9.9
... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.5 Timing and Signalling Characteristics | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.5.1 UE Transmit Timing | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.5.1.1 Definition and applicability | The UE transmit timing is defined as the timing of the uplink DPCCH/DPDCH frame relative to the first detected path (in time) of the corresponding downlink DPCCH/DPDCH frame from the reference cell. The reference point is the antenna connector of the UE.
The requirements and this test apply to all types of UTRA of the ... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.5.1.2 Minimum requirements | The UE initial transmission timing error shall be less than or equal to 1.5 chips. This requirement applies at the first transmission on the DPCCH/DPDCH. The reference point for the UE initial transmit timing control requirement shall be the time when the first detected path (in time) of the corresponding downlink DPC... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.5.1.3 Test purpose | The purpose of this test is to:
1) Verify that the UE initial transmit timing accuracy is within the limits specified in 8.5.1.5.
2) Verify that the UE transmit timing accuracy remains within the limits specified in 8.5.1.5 when the timing of a cell in the active set not used as the reference cell changes its timing.
3... |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.5.1.4 Method of test | |
19eaceb417a28bf040422bcad9ef7619 | 34.121-1 | 8.5.1.4.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
For this test, two cells on the same frequency are used.
The reporting of event 1A and event 1B is configured with SIB 11.
1) Connect the test system to the UE antenna connector as shown in figure A.14.
Table 8... |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.