hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.31.4 Method of test
Initial Condition System Simulator: 1 cell SYSTEM INFORMATION BLOCK TYPE 1 (see specific message contents). UE: PS_DCCH_FACH (state 6-8) as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD or TDD - UE supports HS-PDSCH Test Procedure The UE is in CELL_FACH state. Only signalling rad...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.31.5 Test requirements
After step 1, the UE shall transmit a RADIO BEARER SETUP COMPLETE message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.32 Radio Bearer Establishment for transition from CELL_FACH to CELL_DCH: Success (start of HS-DSCH reception with frequency modification)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.32.1 Definition and applicability
All UEs which support FDD or TDD and HS-PDSCH.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.32.2 Conformance requirement
In case the procedure was triggered by reception of a RADIO BEARER SETUP message, the UE shall: 1> transmit a RADIO BEARER SETUP COMPLETE as response message on the uplink DCCH using AM RLC. … The variable HS_DSCH_RECEPTION shall be set to "TRUE" only when all the following conditions are met: 1> the UE is in CELL_DCH ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.32.3 Test purpose
To confirm that the UE establishes a radio bearer mapped to HS-DSCH according to the received RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.32.4 Method of test
Initial Condition System Simulator: 2 cells–Cell 1 is active and cell 6 is inactive. SYSTEM INFORMATION BLOCK TYPE 1 (see specific message contents). SYSTEM INFORMATION BLOCK TYPE 3 (see specific message contents) UE: PS_DCCH_FACH (state 6-8) as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE s...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.32.5 Test requirements
After step 1, the UE shall transmit a RADIO BEARER SETUP COMPLETE message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.33 Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (Unsynchronised RL Reconfiguration)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.33.1 Definition
-
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.33.2 Conformance requirement
If the UE receives: - a RADIO BEARER SETUP message; or it shall: 1> if the UE will enter the CELL_DCH state from any state other than CELL_DCH state at the conclusion of this procedure: 2> perform the physical layer synchronisation procedure A as specified in TS 25.214 (FDD only); 1> act upon all received information e...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.33.3 Test purpose
To confirm that the UE establishes a new radio bearer according to a RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.33.4 Method of test
Initial Condition System Simulator: 1 cell UE: CS-DCCH_DCH (state 6-5) or PS-DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108, depending on the CN domain(s) supported by the UE. Specific Message Content For SIB type 1 message to be transmitted throughout the test, use the message titled “System Information ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.33.5 Test requirement
After step 1 the UE shall transmit a RADIO BEARER SETUP COMPLETE message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.34 Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (Unsynchronised RL Reconfiguration with frequency modification)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.34.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.34.2 Conformance requirement
If the UE receives: - a RADIO BEARER SETUP message; or it shall: 1> if the UE will enter the CELL_DCH state from any state other than CELL_DCH state at the conclusion of this procedure: 2> perform the physical layer synchronisation procedure A as specified in TS 25.214 (FDD only); 1> act upon all received information e...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.34.3 Test purpose
To confirm that the UE establishes a new radio bearer according to a RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.34.4 Method of test
Initial Condition System Simulator: 2 cells – Cell 1 is active and cell 6 is inactive. UE: CS-DCCH_DCH (state 6-5) or PS-DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108, depending on the CN domain(s) supported by the UE. Specific Message Content For SIB type 1 message to be transmitted throughout the test,...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.34.5 Test requirement
After step 1 the UE shall transmit a RADIO BEARER SETUP COMPLETE message. 8.2.1.34a Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (Unsynchronised RL Reconfiguration with inter band handover) 8.2.1.34a.1 Definition This test case is identical to test case 8.2.1.34 except that the cells bel...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.35 Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (start of E-DCH transmission)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.35.1 Definition and applicability
All UEs which support FDD or TDD and HS-PDSCH and E-DCH and all UEs which support TDD and HS-PDSCH and E-PUCH.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.35.2 Conformance requirement
In case the procedure was triggered by reception of a RADIO BEARER SETUP message, the UE shall: 1> transmit a RADIO BEARER SETUP COMPLETE as response message on the uplink DCCH using AM RLC. … The variable E_DCH_TRANSMISSION shall be set to TRUE only when all the following conditions are met: 1> the UE is in CELL_DCH s...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.35.3 Test purpose
To confirm that the UE establishes a radio bearer mapped to HS-DSCH and E-DCH according to the received RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.35.4 Method of test
Initial Condition System Simulator: 1 cell UE: PS_DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD or TDD - UE supports HS-PDSCH - UE supports E-DPDCH (FDD only) - UE supports E-PUCH (TDD only) Test Procedure The UE is in CELL_DCH state. Only signalling radio...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.35.5 Test requirements
After step 1, the UE shall transmit a RADIO BEARER SETUP COMPLETE message. 8.2.1.35a Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (start of E-DCH transmission, in the multi-frequency network environment, for 1.28 Mcps TDD only) 8.2.1.35a.1 Definition and applicability All UEs which suppo...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.36 Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (hard handover to another frequency, start of E-DCH transmission)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.36.1 Definition
All UEs which support FDD and HS-PDSCH and E-DPDCH and all UEs which support TDD and HS-PDSCH and E-PUCH.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.36.2 Conformance requirement
In case the procedure was triggered by reception of a RADIO BEARER SETUP message, the UE shall: 1> transmit a RADIO BEARER SETUP COMPLETE as response message on the uplink DCCH using AM RLC. … The variable E_DCH_TRANSMISSION shall be set to TRUE only when all the following conditions are met: 1> the UE is in CELL_DCH s...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.36.3 Test purpose
To confirm that the UE performs a hard handover to another frequency, establishes a radio bearer mapped on E-DCH and starts E-DCH transmission according to the received a RADIO BEARER SETUP message. Un-synchronised RB Setup is tested here.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.36.4 Method of test
Initial Condition System Simulator: 2 cells – Cell 1 is active and cell 6 is inactive. UE: PS_DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statements - UE supports FDD or TDD - UE supports HS-PDSCH - UE supports E-DPDCH (FDD only) - UE supports E-PUCH (TDD only) Specific Message Conten...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.36.5 Test requirements
After step 1, the UE shall transmit a RADIO BEARER SETUP COMPLETE message. 8.2.1.36a Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH using F-DPCH: Success (hard handover to another frequency, start of E-DCH transmission, F-DPCH configured) 8.2.1.36a.1 Definition All UEs which support FDD and HS-PDSC...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.37 Void
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.38 Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (start of discontinuous uplink transmission)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.38.1 Definition and applicability
All UEs which support FDD and UL DTX.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.38.2 Conformance requirement
1> if any of the IEs "DTX-DRX timing information" or "DTX-DRX information" are stored in the UE: 2> determine the value for the DTX_DRX_STATUS variable and take the corresponding actions as described in subclause 8.5.34. … If the UE receives RRC CONNECTION SETUP, ACTIVE SET UPDATE, CELL UPDATE CONFIRM, or any reconfigu...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.38.3 Test purpose
To confirm that the UE establishes a radio bearer mapped to HS-DSCH and E-DCH and enables discontinuous uplink DPCCH transmission according to the received RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.38.4 Method of test
Initial Condition System Simulator: 1 cell UE: PS_DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD - UE supports DPCCH Discontinuous Transmission Test Procedure The UE is in CELL_DCH state. Only signalling radio bearers have been established, mapped to DPCH. ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.38.5 Test requirements
After step 1, the UE shall transmit a RADIO BEARER SETUP COMPLETE. At step 3 the time between 11 consecutive CQI indications shall be 320ms if 2ms TTI is used, or 400ms if 10ms TTI is used.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.39 Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (start of HS-SCCH less operation)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.39.1 Definition and applicability
All UEs which support FDD and HS-SCCH less operation.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.39.2 Conformance requirement
If the UE receives: - a RADIO BEARER SETUP message; or … it shall: … 1> if any of the IEs "DTX-DRX timing information" or "DTX-DRX information" are stored in the UE: 2> determine the value for the DTX_DRX_STATUS variable and take the corresponding actions as described in subclause 8.5.34. … If the UE receives RRC CONNE...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.39.3 Test purpose
To confirm that the UE establishes a radio bearer mapped to HS-DSCH and E-DCH and enables HS-SCCH less operation according to the received RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.39.4 Method of test
Initial Condition System Simulator: 1 cell UE: PS_DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD - UE supports HS-SCCHless HS-DSCH Test Procedure The UE is in CELL_DCH state. Only signalling radio bearers have been established. The test operator is prompted...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.39.5 Test requirements
After step 1, the UE shall transmit a RADIO BEARER SETUP COMPLETE. After step 3, the UE shall transmit a UE CAPABILITY INFORMATION message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.40 Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (hard handover to another frequency, start of discontinuous uplink transmission)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.40.1 Definition
All UEs which support FDD and UL DTX.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.40.2 Conformance requirement
In case the procedure was triggered by reception of a RADIO BEARER SETUP message, the UE shall: 1> transmit a RADIO BEARER SETUP COMPLETE as response message on the uplink DCCH using AM RLC. … If the UE receives RRC CONNECTION SETUP, ACTIVE SET UPDATE, CELL UPDATE CONFIRM, or any reconfiguration message: 1> the UE shal...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.40.3 Test purpose
To confirm that the UE performs a hard handover to another frequency, establishes a radio bearer mapped to HS-DSCH and E-DCH and enables discontinuous uplink DPCCH transmission according to the received RADIO BEARER SETUP message. Un-synchronised RB Setup is tested here.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.40.4 Method of test
Initial Condition System Simulator: 2 cells – Cell 1 is active and cell 6 is inactive. UE: PS_DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statements - UE supports FDD - UE supports DPCCH Discontinuous Transmission Specific Message Content For SIB type 1 message to be transmitted throu...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.40.5 Test requirements
After step 1, the UE shall transmit a RADIO BEARER SETUP COMPLETE message. At step 3 the time between 11 consecutive CQI indications shall be 320ms if 2ms TTI is used, or 400ms if 10ms TTI is used.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.41 Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (UL DPCCH slot format #4)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.41.1 Definition and applicability
All UEs which support FDD and Slot Format #4.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.41.2 Conformance requirement
If the IE "Uplink DPCH info" is included, the UE shall: For FDD: 1> release any active uplink physical channels and activate the given physical channels; 1> if the IE "Number of FBI bits" is not included: 2> use 0 FBI bits in the Uplink DPCH. 1> if the IE "Number of TPC bits" is not included: 2> use 2 TPC bits in the U...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.41.3 Test purpose
To confirm that the UE is able to establish a radio bearer mapped on E-DCH/HS-DSCH, with signalling radio bearers mapped on E-DCH/HS-DSCH together with use of F-DPCH and UL DPCCH slot format #4, according to the received RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.41.4 Method of test
Initial Condition System Simulator: 1 cell UE: PS_DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD - UE supports Slot Format #4 Test Procedure The UE is in CELL_DCH state. Only signalling radio bearers have been established. The test operator is prompted to m...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.41.5 Test requirements
After step 1, the UE shall transmit a RADIO BEARER SETUP COMPLETE.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.42 Radio Bearer Establishment for transition from CELL_FACH (Enhanced UL/DL) to CELL_DCH : Success (with ongoing HS-DSCH reception and E-DCH transmission)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.42.1 Definition and applicability
UE supports FDD and Enhanced Uplink in CELL_FACH state.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.42.2 Conformance requirement
Extract from 25.331 If after state transition the UE enters CELL_DCH state, the UE shall, after the state transition: 1> in FDD; or 1> in TDD when "Primary CCPCH Info" is included indicating a new target cell and "New C-RNTI" is not specified: 2> remove any C-RNTI from MAC; 2> clear the variable C_RNTI. 1> determine th...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.42.4 Method of test
Initial Conditions System Simulator: 1 cell. UE: PS-DCCH Enhanced CELL_FACH (state 6-8) as specified in clause 7.4 of TS 34.108 with SRB mapping on common E-DCH /HS-DSCH Related ICS/IXIT statement(s) - UE supports FDD - UE supports of common E-DCH Test Procedure The UE is in Enhanced CELL_FACH state, Only signalling ra...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.42.5 Test requirements
After step 1, the UE shall transmit a RADIO BEARER SETUP COMPLETE message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.43 Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (start of E-DCH transmission with enhanced TS0) (1.28 Mcps TDD)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.43.1 Definition and applicability
All UEs which support 1.28Mcps TDD and HS-PDSCH and E-DCH and enhanced TS0.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.43.2 Conformance requirement
Same conformance requirement as in clause 8.2.1.35.2
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.43.3 Test purpose
To confirm that the UE establishes a radio bearer mapped to HS-DSCH(include TS0) and E-DCH according to the received RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.43.4 Method of test
Initial Condition System Simulator: 1 cell, cell1 configures 3 carrier frequency, one is primary frequency, other are secondary frequencies. The frequency relation show as below: Parameter Cell 1 UTRA RF Channel Number1 Ch. 1 UTRA RF Channel Number2 Ch. 2 UTRA RF Channel Number3 Ch.3 UE: PS_DCCH_DCH (state 6-7) as spec...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.43.5 Test requirements
After step 1, the UE shall transmit a RADIO BEARER SETUP COMPLETE message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44 Radio Bearer Establishment for transition between CELL_DCH & CELL_DCH with SRBs mapped on DCH: Successful Activation of 3C-HSDPA and 4C-HSDPA for different bands
NOTE: The Radio Bearer Establishment test case 8.2.1.44 for 3C/4C-HSDPA has been split in to Single band and Dual Band test cases. The test cases have been designed to cover 3C-HSDPA / 4C-HSDPA carrier combinations that will enable testing of all UEs supporting FDD HS-DSCH physical layer categories 29, 30, 31 or 32.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.1 Radio Bearer Establishment for transition between CELL_DCH & CELL_DCH with SRB on DCH: Successful Activation of 3C-HSDPA for single band
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.1.1 Definition and applicability
All UE categories (Cat 29, 30, 31 and 32) which supports 3C-HSDPA and 64 QAM. UE supports FDD.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.1.2 Conformance requirement
If the UE receives: - a RADIO BEARER SETUP message; or it shall: 1> if the UE will enter the CELL_DCH state from any state other than CELL_DCH state at the conclusion of this procedure: 2> perform the physical layer synchronisation procedure A as specified in TS 25.214 (FDD only); 1> act upon all received information e...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.1.3 Test purpose
To confirm that the UE establishes radio bearer mapped to HS-DSCH, transits from CELL_DCH to CELL_DCH state, and starts simultaneous 64QAM reception over multi Carriers (single band 3C) according to the received RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.1.4 Method of test
Initial Condition System Simulator: SS configures cells as per Table 5.0aB of TS 25.101 [21]. 3 cells –Cell 1/2/3 3C HSDPA cell(s) with Cell 1(Anchor Carrier), Cell 2 and Cell 3 (Secondary Carriers) on DL Band A –UE: CELL_DCH (state 6-5 or state 6-7) as specified in clause 7.4 of TS 34.108 [9], depending on the CN doma...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.1.5 Test requirements
At step 2 the UE shall transmit a RADIO BEARER SETUP COMPLETE message. At step 5 the UE shall transmit CQI reports for the 3 cells. At step 4 the UE shall transmit UE CAPABILITY INFORMATION on SRB2.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.2 Radio Bearer Establishment for transition between CELL_DCH & CELL_DCH with SRB mapped on DCH : Successful Activation of 3C-HSDPA for dual bands (1-2)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.2.1 Definition and applicability
All UE categories (Cat 29, 30, 31 and 32) which support combination of 3C-HSDPA, and 64 QAM. UE supports FDD.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.2.2 Conformance requirement
Same as subclause 8.2.1.44.1.2.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.2.3 Test purpose
To confirm that the UE establishes radio bearer mapped to HS-DSCH, transits from CELL_DCH to CELL_DCH state, and starts simultaneous 64QAM reception over multi Carriers (dual band 3C carriers 1-2) according to the received RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.2.4 Method of test
Initial Condition System Simulator: SS configures cells as per Table 5.0aC of TS 25.101 [21]. 3 cells –Cell 1/2/3 3C HSDPA cell(s) with Cell 1(Anchor Carrier), Cell 2 and Cell 3 (Secondary Carriers) – One Anchor Carrier on DL Band A and two Secondary Carriers on DL Band B (Dual Band 3C HSDPA) UE: CELL_DCH (state 6-5 ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.2.5 Test requirements
Same as subclause 8.2.1.44.1.5
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.3 Radio Bearer Establishment for transition between CELL_DCH & CELL_DCH with SRBs mapped on DCH: Successful Activation of 3C-HSDPA for Dual bands (2-1)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.3.1 Definition and applicability
All UE categories (Cat 29, 30, 31 and 32) which support combination of 3C-HSDPA, and 64 QAM. UE supports FDD.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.3.2 Conformance requirement
Same as subclause 8.2.1.44.1.2.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.3.3 Test purpose
To confirm that the UE establishes radio bearer mapped to HS-DSCH, transits from CELL_DCH to CELL_DCH state, and starts simultaneous 64QAM reception over multi Carriers (dual band 3C carriers 2-1) according to the received RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.3.4 Method of test
Initial Condition System Simulator: SS configures cells as per Table 5.0aC of TS 25.101 [21]. 3 cells –Cell 1/2/3 3C HSDPA cell(s) with Cell 1(Anchor Carrier), Cell 2 and Cell 3 (Secondary Carriers) – One Anchor Carrier and one secondary carrier on DL Band A and one Secondary Carriers on DL Band B (Dual Band 3C HSDPA)...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.3.5 Test requirements
Same as subclause 8.2.1.44.1.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.4 Radio Bearer Establishment for transition between CELL_DCH & CELL_DCH with SRBs mapped on DCH: Successful Activation of 4C-HSDPA for Dual Bands (3-1)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.4.1 Definition and applicability
All UE categories (Cat 31 and 32) which support combination of 4C-HSDPA, and 64 QAM. UE supports FDD.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.4.2 Conformance requirement
Same as subclause 8.2.1.44.1.2
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.4.3 Test purpose
To confirm that the UE establishes radio bearer mapped to HS-DSCH, transits from CELL_DCH to CELL_DCH state, and starts simultaneous 64QAM reception over multi Carriers (dual band 4C carriers 3-1) according to the received RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.4.4 Method of test
Initial Condition System Simulator: SS configures cells as per Table 5.0aC of TS 25.101[21]. 4 cells –Cell 1/2/3/4 4C HSDPA cell(s) with Cell 1 (Anchor Carrier) and Cell 2, Cell 3 and Cell 4 (Secondary Carriers) – One Anchor Carrier and two Secondary Carrier on DL Band A and one Secondary Carriers on DL Band B (Dual B...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.4.5 Test requirements
At step 3 the UE shall transmit a RADIO BEARER SETUP COMPLETE message. At step 6 the UE shall transmit CQI reports for the 4 cells. At step 5 the UE shall transmit UE CAPABILITY INFORMATION on SRB2.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.5 Radio Bearer Establishment for transition between CELL_DCH & CELL_DCH with SRBs mapped on DCH: Successful Activation of 4C-HSDPA for Dual Bands (2-2)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.5.1 Definition and applicability
All UE categories (Cat 31 and 32) which support combination of 4C-HSDPA, and 64 QAM. UE supports FDD.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.5.2 Conformance requirement
Same as in subclause 8.2.1.44.1.2.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.5.3 Test purpose
To confirm that the UE establishes radio bearer mapped to HS-DSCH, transits from CELL_DCH to CELL_DCH state, and starts simultaneous 64QAM reception over multi Carriers (dual band 4C carriers 2-2) according to the received RADIO BEARER SETUP message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.5.4 Method of test
Initial Condition System Simulator: SS configures cells as per Table 5.0aC of TS 25.101 [21]. 4 cells –Cell 1/2/3/4 4C HSDPA cell(s) with Cell 1 (Anchor Carrier) and Cell 2, Cell 3 and Cell 4 (Secondary Carriers) – One Anchor Carrier and One Secondary Carrier on DL Band A and Two Secondary Carriers on DL Band B (Dual B...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.44.5.5 Test requirements
Same as in subclause 8.2.1.44.4.5.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.1.45 Radio Bearer Establishment for transition between CELL_DCH and CELL_DCH with SRBs mapped on DCH: Successful Activation of Multiflow HSDPA for Single and Dual bands/Intra Node B
NOTE: The Radio Bearer Reconfiguration test case 8.2.1.45 for Multiflow HSDPA has been split in to Single Frequency/Dual Cell on Single Band, Dual Frequency/Three Cells on Single Band and Dual Frequency/Three Cells on Dual bands test cases. The test cases have been designed to cover Multiflow HSDPA carrier combinations...