hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.50 Physical Channel Reconfiguration for transition from CELL_DCH to URA_PCH: Success (frequency modification, stop of E-DCH transmission)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.50.1 Definition
All UEs which support FDD or TDD, HS-PDSCH and E-DPDCH or E-PUCH.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.50.2 Conformance requirement
In case the procedure was triggered by reception of a PHYSICAL CHANNEL RECONFIGURATION message, the UE shall: 1> transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE as response message on the uplink DCCH using AM RLC. … The variable E_DCH_TRANSMISSION shall be set to "TRUE" only when all the following conditions are m...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.50.3 Test purpose
To confirm that the UE transmits a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the uplink DCCH using AM RLC; To confirm that the UE transits from CELL_DCH with active E-DCH transmission and HS-HSCH reception to URA_PCH state on a different frequency after it received a PHYSICAL CHANNEL RECONFIGURATION message;...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.50.4 Method of test
Initial Condition System Simulator: 2 cells– Cell 1 and cell 6 are active. UE: PS-DCCH +DTCH_HS-DSCH +DTCH_E-DCH (state 6-18) under condition A12 in cell 1 as specified in clause 7.4 of TS 34.108 Related ICS/IXIT statement(s) - UE supports FDD or TDD - UE supports HS-PDSCH - UE supports E-DPDCH(FDD only) or E-PUCH (TDD...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.50.5 Test requirement
After step 2 the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the DCCH using AM RLC in cell 1. After step 3 the UE shall be in URA_PCH state in cell 6.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.51 Physical Channel Reconfiguration for transition from CELL_DCH to CELL_DCH: Success (serving E-DCH cell change)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.51.1 Definition and applicability
All UEs which support FDD or TDD and HS-PDSCH and E-DPDCH or E-PUCH.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.51.2 Conformance requirement
In case the procedure was triggered by reception of a PHYSICAL CHANNEL RECONFIGURATION message, the UE shall: 1> transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE as response message on the uplink DCCH using AM RLC. … The variable E_DCH_TRANSMISSION shall be set to "TRUE" only when all the following conditions are m...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.51.3 Test purpose
To confirm that the UE changes the serving E-DCH cell according to the received PHYSICAL CHANNEL RECONFIGURATION message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.51.4 Method of test
Initial Condition System Simulator: 2 cells - Cell 1 and 2 are active UE: PS_DCCH+DTCH E_DCH/HS_DSCH (state 6-18) under condition A13, as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD or TDD - UE supports HS-PDSCH - UE supports E-DPDCH (FDD only) or E-PUCH (TDD only) Test Procedu...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.51.5 Test requirements
After step 0a, the UE shall transmit a MEASUREMENT REPORT message (FDD only). After step 3, the UE shall transmit a MEASUREMENT REPORT message. This step doesn’t apply for 1.28 Mcps TDD. After step 5, the UE shall transmit a MEASUREMENT REPORT message. After step 8, the UE shall transmit a PHYSICAL CHANNEL RECONFIGURAT...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.52 Physical channel reconfiguration for transition from CELL_DCH to CELL_DCH: Success (Timing re-initialized hard handover to another frequency, Serving E-DCH cell change, compressed mode)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.52.1 Definition
All UEs which support FDD, HS-PDSCH, E-DPDCH and fully support F-DPCH and all UEs which support TDD and HS-PDSCH and E-PUCH.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.52.2 Conformance requirement
If the UE receives: - a PHYSICAL CHANNEL RECONFIGURATION message; it shall: 1> set the variable ORDERED_RECONFIGURATION to TRUE; … 1> act upon all received information elements as specified in TS25.331 subclause 8.6, unless specified in the following and perform the actions below. … 1> enter a state according to TS25....
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.52.3 Test purpose
To confirm that the UE is able to perform a timing re-initialised hard handover to another frequency after compressed mode measurement on the target frequency in conjunction with a serving E-DCH cell change according to the received PHYSICAL CHANNEL RECONFIGURATION message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.52.4 Method of test
Initial Condition System Simulator: 2 cells–Cell 1 and cell 6 are active UE: PS-DCCH +DTCH_HS-DSCH +DTCH_E-DCH (state 6-18) under condition A14 in cell 1 as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD or TDD - UE supports HS-PDSCH - UE supports E-DPDCH (FDD only) - UE fully sup...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.52.5 Test requirement
After step 2 the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the uplink DCCH using AM RLC (FDD only). After step 5 the UE shall transmit a MEASUREMENT REPORT message containing the IE "measured results" reporting cell 6's CPICH RSCP and Ec/No values, also report the triggering of event '2b'...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.53 Void
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.54 Physical Channel Reconfiguration for transition from CELL_DCH to CELL_DCH: Failure (Timing re-initialized hard handover, Serving E-DCH cell change, physical channel failure and reversion to old channel)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.54.1 Definition and applicability
All UEs which support FDD or TDD and HS-PDSCH and E-DPDCH or E-PUCH.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.54.2 Conformance requirement
If the received message caused the UE to be in CELL_DCH state and the UE according to subclause 8.5.4 failed to establish the dedicated physical channel(s) indicated in the received message or for 3.84 Mcps TDD and 7.68 Mcps TDD failed to establish the physical channel(s) indicated in the received message to which DCCH...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.54.3 Test purpose
To confirm that the UE reverts to the old E-DCH / HS-DSCH configuration and transmits a PHYSICAL CHANNEL RECONFIGURATION FAILURE message if the UE fails to reconfigure the new physical channel according to the received PHYSICAL CHANNEL RECONFIGURATION message before the expiry of timer T312.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.54.4 Method of test
Initial conditions System Simulator: 2 cells - Cell 1 & Cell 6. UE: PS_DCCH+DTCH E_DCH/HS_DSCH (state 6-18) under condition A13, as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD or TDD - UE supports HS-PDSCH - UE supports E-DPDCH (FDD only) or E-PUCH (TDD only) Test Procedure The...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.54.5 Test requirements
After step 2, the UE shall revert to the old E-DCH / HS-DSCH configuration on Cell 1 and transmit a PHYSICAL CHANNEL RECONFIGURATION FAILURE message. 8.2.6.54a Physical Channel Reconfiguration for transition from CELL_DCH to CELL_DCH: Failure (Timing re-initialized hard handover, Serving E-DCH and HS-DSCH cell change w...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.55 Physical channel reconfiguration for transition from CELL_DCH to CELL_DCH: Success (Start of discontinuous uplink transmission and downlink reception)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.55.1 Definition and applicability
All UEs which support FDD and UL DTX.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.55.2 Conformance requirement
In case the procedure was triggered by reception of a PHYSICAL CHANNEL RECONFIGURATION message, the UE shall: 1> transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE as response message on the uplink DCCH using AM RLC. …. If the UE receives RRC CONNECTION SETUP, ACTIVE SET UPDATE, CELL UPDATE CONFIRM, or any reconfigur...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.55.3 Test purpose
To confirm that the UE reconfigures the physical layer to perform discontinuous uplink DPCCH transmission and enable discontinuous downlink reception operations according to the IE DTX_DRX_Information received in PHYSICAL CHANNEL RECONFIGURATION message from the SS.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.55.4 Method of test
Initial Condition System Simulator: 1 cell UE: PS-DCCH +DTCH_HS-DSCH +DTCH_E-DCH (state 6-18) under condition A14 in cell 1 as specified in clause 7.4 of TS 34.108 Related ICS/IXIT statement(s) - UE supports FDD - UE supports discontinuous uplink transmission Test Procedure The UE is in state 6-18 under condition A14 a...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.55.5 Test requirements
After step 1, the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the uplink DCCH using AM RLC. At step 3 the time between 11 consecutive CQI indications shall be 320ms if 2ms TTI is used, or 400ms if 10ms TTI is used. After step 3, the UE shall be in Cell_DCH state
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.56 Physical channel reconfiguration for transition from CELL_DCH to CELL_DCH: Success (Start of HS-SCCH less operation)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.56.1 Definition and applicability
All UEs, which support FDD and HS-SCCH less.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.56.2 Conformance requirement
In case the procedure was triggered by reception of a PHYSICAL CHANNEL RECONFIGURATION message, the UE shall: 1> transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE as response message on the uplink DCCH using AM RLC. …. If the UE receives RRC CONNECTION SETUP, ACTIVE SET UPDATE, CELL UPDATE CONFIRM, or any reconfigur...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.56.3 Test purpose
To confirm that the UE reconfigures the physical layer to perform HS-SCCH less operation according to the IE HS-SCCH less information received in PHYSICAL CHANNEL RECONFIGURATION message from the SS.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.56.4 Method of test
Initial Condition System Simulator: 1 cell. UE: PS-DCCH +DTCH_HS-DSCH +DTCH_E-DCH (state 6-18) under condition A14 in cell 1 as specified in clause 7.4 of TS 34.108 Related ICS/IXIT statements - UE supports FDD - UE supports HS-SCCHless HS-DSCH Test Procedure The UE is in state 6-18 under condition A14 as specified in ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.56.5 Test requirements
After step 1, the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the uplink DCCH using AM RLC. After step 2, the UE shall be in Cell_DCH state
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.57 Physical Channel Reconfiguration for transition from CELL_DCH to URA_PCH: Success (frequency modification, stop of discontinuous uplink transmission)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.57.1 Definition
All UEs, which support FDD and UL DTX.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.57.2 Conformance requirement
In case the procedure was triggered by reception of a PHYSICAL CHANNEL RECONFIGURATION message, the UE shall: 1> transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE as response message on the uplink DCCH using AM RLC. … The variable DTX_DRX_STATUS shall be set to TRUE only when all the following conditions are met: 1>...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.57.3 Test purpose
To confirm that the UE transmits a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the uplink DCCH using AM RLC; To confirm that the UE transits from CELL_DCH with UL DTX and DL DRX configured to URA_PCH state on a different frequency after it received a PHYSICAL CHANNEL RECONFIGURATION message; To confirm that th...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.57.4 Method of test
Initial Condition System Simulator: 2 cells– Cell 1 and cell 6 are active. UE: PS-DCCH +DTCH_HS-DSCH +DTCH_E-DCH (state 6-18) under condition A20 in cell 1 as specified in clause 7.4 of TS 34.108 Related ICS/IXIT statement(s) - UE supports FDD - UE supports discontinuous uplink transmission. Test Procedure Table 8.2.6....
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.57.5 Test requirement
At step 3 the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the DCCH using AM RLC in cell 1. At step 4 the UE shall be in URA_PCH state in cell 6.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.58 Physical Channel Reconfiguration for transition from CELL_DCH to CELL_DCH: Success (serving E-DCH cell change with discontinuous uplink transmission)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.58.1 Definition and applicability
All UEs which support FDD and UL DTX.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.58.2 Conformance requirement
In case the procedure was triggered by reception of a PHYSICAL CHANNEL RECONFIGURATION message, the UE shall: 1> transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE as response message on the uplink DCCH using AM RLC. … The variable DTX_DRX_STATUS shall be set to TRUE only when all the following conditions are met: 1>...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.58.3 Test purpose
To confirm that the UE changes the serving E-DCH cell with discontinuous uplink transmission according to the received PHYSICAL CHANNEL RECONFIGURATION message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.58.4 Method of test
Initial Condition System Simulator: 2 cells - Cell 1 and 2 are active UE: PS_DCCH+DTCH E_DCH/HS_DSCH (state 6-18) under condition A20, as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD - UE supports discontinuous uplink transmission. Test Procedure Table 8.2.6.58 Parameter Unit Ce...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.58.5 Test requirements
At step 1, the UE shall transmit a MEASUREMENT REPORT message. At step 6, the UE shall transmit a MEASUREMENT REPORT message. At step 8, the UE shall transmit a MEASUREMENT REPORT message. At step 11, the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message. At step 12 the time between 11 consecutive C...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.59 Physical channel reconfiguration for transition from CELL_DCH to CELL_DCH: Success (Timing re-initialized hard handover to another frequency, Serving E-DCH cell change with discontinuous uplink transmission)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.59.1 Definition
All UEs, which support FDD and UL DTX.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.59.2 Conformance requirement
If the UE receives: - a PHYSICAL CHANNEL RECONFIGURATION message; it shall: 1> set the variable ORDERED_RECONFIGURATION to TRUE; … 1> act upon all received information elements as specified in TS25.331 subclause 8.6, unless specified in the following and perform the actions below. … 1> enter a state according to TS25....
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.59.3 Test purpose
To confirm that the UE is able to perform a timing re-initialized hard handover to another frequency after compressed mode measurement on the target frequency in conjunction with a serving E-DCH cell change and UL DTX configured according to the received PHYSICAL CHANNEL RECONFIGURATION message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.59.4 Method of test
Initial Condition System Simulator: 2 cells–Cell 1 and cell 6 are active UE: PS-DCCH +DTCH_HS-DSCH +DTCH_E-DCH (state 6-18) under condition A20 in cell 1 as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD - UE supports discontinuous uplink transmission Test Procedure Table 8.2.6.59...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.60 Physical Channel Reconfiguration for transition from CELL_DCH to CELL_DCH: Failure (Timing re-initialised hard handover, Serving E-DCH cell change with discontinuous uplink transmission, physical channel failure and reversion to old channel)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.60.1 Definition
All UEs which support FDD and UL DTX.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.60.2 Conformance requirement
If the received message caused the UE to be in CELL_DCH state and the UE according to subclause 8.5.4 failed to establish the dedicated physical channel(s) indicated in the received message or for 3.84 Mcps TDD and 7.68 Mcps TDD failed to establish the physical channel(s) indicated in the received message to which DCCH...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.60.3 Test purpose
To confirm that the UE reverts to the old E-DCH / HS-DSCH configuration with UL DTX and transmits a PHYSICAL CHANNEL RECONFIGURATION FAILURE message if the UE fails to reconfigure the new physical channel according to the received PHYSICAL CHANNEL RECONFIGURATION message before the expiry of timer T312.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.60.4 Method of test
Initial conditions System Simulator: 2 cells - Cell 1 & Cell 6. UE: PS_DCCH+DTCH E_DCH/HS_DSCH (state 6-18) under condition A20, as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD - UE supports discontinuous uplink transmission. Test Procedure The UE is in the CELL_DCH state and ha...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.60.5 Test requirements
At step 3, the UE shall revert to the old E-DCH / HS-DSCH configuration on Cell 1 and transmit a PHYSICAL CHANNEL RECONFIGURATION FAILURE message. At step 4 the time between 11 consecutive CQI indications shall be 400ms.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.61 Physical channel reconfiguration for transition from CELL_DCH to CELL_DCH: Success (CQI reporting reduction)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.61.1 Definition and applicability
All UEs, which support FDD and UL DTX.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.61.2 Conformance requirement
If the IE "Measurement Feedback Info" is included and the UE will be in CELL_DCH state after completion of this procedure, the UE shall: 1> store the received configuration; 1> determine the value for the HS_DSCH_RECEPTION variable and take the corresponding actions as described in subclause 8.5.25. When the variable ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.61.3 Test purposes
1. To confirm that the UE correctly performs the HS-DPCCH CQI reporting procedure using some of the extended values for the IE CQI feedback cycle, according to the received RADIO BEARER SETUP message. 2. To confirm that the UE correctly performs the CQI reporting reduction procedure according to the received PHYSICAL C...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.61.4 Method of test
Initial Condition System Simulator: 1 cell UE: PS-DCCH (state 6-7) with SRBs mapped to E-DCH/HS-DSCH as specified in clause 7.4 of TS 34.108 Related ICS/IXIT statement(s) - UE supports FDD - UE supports discontinuous uplink transmission Test Procedure The UE is in CELL_DCH state. Only signalling radio bearers have been...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.61.5 Test requirements
After step 1, the UE shall transmit a RADIO BEARER SETUP COMPLETE message on the uplink DCCH using AM RLC. After step 2, the UE shall transmit CQI reports every 64 ms. The time between 11 consecutive CQI reports shall be 640 ms (verifies test purpose 1). After step 4, the UE shall transmit a PHYSICAL CHANNEL RECONFIGUR...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.62 Physical Channel Reconfiguration from CELL_DCH to CELL_DCH: Success (activation and de-activation of 64QAM)
8.2.6.62.1 Definition and Applicability All UEs which support FDD, mac-ehs and 64QAM 8.2.6.62.2 Conformance Requirement In case the procedure was triggered by reception of a PHYSICAL CHANNEL RECONFIGURATION message, the UE shall: 1> transmit a PHYSICAL CHANNEL COMPLETE as response message on the uplink DCCH using A...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.62.3 Test purpose
1. To confirm that the UE starts HS-DSCH transmission using DL 64QAM mode according to PHYSICAL CHANNEL RECONFIGURATION message on DCCH. 2. To confirm that the UE stops HS-DSCH transmission using DL 64QAM mode according to PHYSICAL CHANNEL RECONFIGURATION message on DCCH.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.62.4 Method of test
Initial conditions System Simulator: UE: PS_DCCH+DTCH E_DCH/HS_DSCH (state 6-18) under condition A17b, as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD - UE supports MAC-ehs and 64QAM - UE fully supports F-DPCH Test Procedure The UE is initially in CELL_DCH state with the SRBs an...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.62.5 Test requirements
After step 1 the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the uplink DCCH using AM RLC. At step 3 the UE should receive UE CAPABILITY ENQUIRY mapped on DL 64QAM HS-DSCH(mac-ehs) At step 5 the UE should receive UE CAPABILITY INFORMATION CONFIRM mapped on DL 64QAM HS-DSCH(mac-ehs) After st...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.63 Physical Channel Reconfiguration from CELL_DCH to CELL_DCH: Success (Timing re-initialised hard handover to another frequency, Serving HS-DSCH cell change with MIMO enabled)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.63.1 Definition and applicability
All UEs which support FDD and MIMO.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.63.2 Conformance requirement
Extract from 25.331 1> if any IEs related to MIMO are stored in the UE: 2> determine the value for the MIMO_STATUS variable and take the corresponding actions as described in subclause 8.5.33. […] If the UE receives an ACTIVE SET UPDATE, CELL UPDATE CONFIRM, or any reconfiguration message: 1> if the IE "MIMO parameters...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.63.3 Test purpose
1. To confirm that the UE is able to perform a timing re-initialised hard handover to another frequency without prior measurement on the target frequency in conjunction with a serving HS-DSCH cell change and with MIMO enabled according to the received PHYSICAL CHANNEL RECONFIGURATION message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.63.4 Method of test
Initial Condition System Simulator: 2 cells –2 cells - Cell 1 on frequency f1, and cell2 on frequency f2. Cells 1 and 2 have different primary scrambling codes (FDD only) UE: PS-DCCH DCH (state 6-7) as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD - UE supports MIMO Test Procedur...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.63.5 Test requirements
At step 2, the UE shall transmit a RADIO SETUPCOMPLETE message on the uplink DCCH using AM RLC. At step 4, the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the uplink DCCH using AM RLC. At step 6, the UE shall transmit UE CAPABILITY INFORMATION on the uplink DCCH using AM RLC.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.64 Physical channel reconfigurations for transition from CELL_DCH to CELL_DCH (activation and de-activation of UL 16QAM ): Success
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.64.1 Definition and applicability
All UEs which support FDD and UL 16QAM
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.64.2 Conformance requirement
If the IE "E-DCH Info" is included and the UE will be in CELL_DCH state after completion of this procedure, the UE shall: 1> for FDD: 2> if the IE "E-DPCCH Info" is included: 3> store the newly received E-DPCCH configuration. 2> if the IE "E-DPDCH Info" is included: 3> store the newly received E-DPDCH configuration. 2>...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.64.3 Test purpose
1. To confirm that the UE starts E-DCH transmission using UL 16QAM mode according to PHYSICAL CHANNEL RECONFIGURATION message on DCCH. 2. To confirm that the UE stops E-DCH transmission using UL 16QAM mode according to PHYSICAL CHANNEL RECONFIGURATION message on DCCH
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.64.4 Method of test
Initial Condition System Simulator: 1 cell. UE: Idle state (State 3 or State 7) as specified in clause 7.4 of TS 34.108.Related ICS/IXIT statement(s) - UE supports FDD - UE supports HS-PDSCH - UE supports UL 16QAM - UE fully supports F-DPCH Test Procedure The UE is brought to the CELL_DCH state after a successful inco...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.64.5 Test requirement
After step 2 the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the uplink DCCH using AM RLC. At step 4 the UE should use UL 16QAM E-DCH transmission for the data loopback test. After step 6 the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the uplink DCCH using AM ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.65 Physical Channel Reconfiguration from CELL_DCH to CELL_DCH: Success (Timing re-initialised hard handover to another frequency, Serving HS-DSCH cell change with 64QAM and MIMO enabled)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.65.1 Definition and applicability
UE category supports combined 64QAM and MIMO activation. UE support FDD and F-DPCH or Enhanced F-DPCH.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.65.2 Conformance requiremen
Extract from 25.331 1> if any IEs related to MIMO are stored in the UE: 2> determine the value for the MIMO_STATUS variable and take the corresponding actions as described in subclause 8.5.33. […] If the UE receives an ACTIVE SET UPDATE, CELL UPDATE CONFIRM, or any reconfiguration message: 1> if the IE "MIMO parameters...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.65.3 Test purpose
2. To confirm that the UE is able to perform a timing re-initialised hard handover to another frequency without prior measurement on the target frequency in conjunction with a serving HS-DSCH cell change and with MIMO and 64QAM enabled according to the received PHYSICAL CHANNEL RECONFIGURATION message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.65.4 Method of test
Initial Condition System Simulator: 2 cells –2 cells - Cell 1 on frequency f1, and Cell 6 on frequency f2. Cells 1 and 6 have different primary scrambling codes (FDD only) UE: PS-DCCH DCH (state 6-7) as specified in clause 7.4 of TS 34.108. Related ICS/IXIT statement(s) - UE supports FDD - UE category supports combined...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.65.5 Test requirements
At step 2, the UE shall transmit a RADIO BEARER SETUP COMPLETE message on the uplink DCCH using AM RLC. At step 4, the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the uplink DCCH using AM RLC. At step 7, the UE shall transmit UE CAPABILITY INFORMATION on the uplink DCCH using AM RLC.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.66 Physical Channel Reconfiguration from CELL_PCH to CELL_FACH: Success (autonomous transitions without cell update procedure)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.66.1 Definition and applicability
UE supports FDD and Enhanced Uplink in CELL_FACH state.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.66.2 Conformance requirement
Extract from 25.331 This procedure is used to transmit paging information to selected UEs in idle mode, CELL_PCH or URA_PCH state using the paging control channel (PCCH). Upper layers in the network may request paging, to e.g. establish a signalling connection. UTRAN may initiate paging for UEs in CELL_PCH or URA_PCH s...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.66.3 Test purpose
1. To confirm that UE performs transition from CELL_PCH to CELL_FACH state without the cell update procedure
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.66.4 Method of test
Initial Condition System Simulator: 1 cell. For system information block 5 see specific message contents. UE: UE: PS-DCCH Enhanced CELL_FACH (state 6-8) as specified in clause 7.4 of TS 34.108 with SRB mapping on common E-DCH /HS-DSCH Related ICS/IXIT statement(s) - UE supports FDD - UE supports of common E-DCH Test Pr...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.66.5 Test requirement
1. After paging type 1 reception the UE transits to CELL-FACH state without performing a cell update procedure.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.67 Physical channel reconfiguration for transition from CELL_DCH to CELL_DCH: Success (Start of SPS operation without initial SPS resource) (1.28 Mcps TDD)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.67.1 Definition and applicability
All UEs which support TDD and SPS operation.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.67.2 Conformance requirement
If the UE receives RRC CONNECTION SETUP, CELL UPDATE CONFIRM, or any reconfiguration message: 1> the UE shall determine the value for the HS_DSCH_SPS_STATUS variable. The variable HS_DSCH_SPS_STATUS shall be set to TRUE only when all the following conditions are met: 1> the UE is in CELL_DCH state; 1> the variable HS_D...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.67.3 Test purpose
To confirm that the UE reconfigures the physical layer to perform SPS operation according to the IE E-DCH SPS Information and HS-DSCH SPS Information received in PHYSICAL CHANNEL RECONFIGURATION message from the SS.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.67.4 Method of test
Initial Condition System Simulator: 1 cell UE: PS-DCCH +DTCH_HS-DSCH +DTCH_E-DCH (state 6-18) under condition A13 in cell 1 as specified in clause 7.4 of TS 34.108 Related ICS/IXIT statement(s) - UE supports TDD - UE supports SPS operation Test Procedure The UE is in state 6-18 under condition A13 as specified in TS 34...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.2.6.67.5 Test requirements
After step 1, the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the uplink DCCH using AM RLC. After step 2, the UE shall be in Cell_DCH state.