hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.6 Inter system handover from UTRAN/To GSM/Speech/Failure (L2 Establishment) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.6.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.6.2 Conformance requirement | If the UE does not succeed to establish the connection to the other radio access technology , as is unable to obtain L2 establishment it shall
- resume the connection to UTRAN using the resources used before receiving the HANDOVER FROM UTRAN COMMAND message; and
- transmit the HANDOVER FROM UTRAN FAILURE message on upl... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.6.3 Test purpose | To Test that the UE shall keep its old configuration and transmit a HANDOVER FROM UTRAN FAILURE message, which is set to "physical channel failure" in IE "Inter_RAT HO failure cause", when it receives a HANDOVER FROM UTRAN COMMAND and the connection to GSM for handover cannot be established due to failure in L2 establi... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.6.4 Method of test | Initial conditions
System Simulator : 2 cells - Cell 1 is UTRAN, Cell 9 is GSM. GSM 51010-1 section 26.6.5.1 shall be referenced for the default parameters of cell 9.
UE: CC State U10 in cell 1
Related ICS/IXIT statement(s)
UE supports both GSM and UTRAN Radio Access Technologies,
UE supports GSM FR,
UE supports UTRAN... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.6.5 Test requirement | The SS shall receive HANDOVER FROM UTRAN FAILURE message on the old channel of the UTRAN cell. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.7 Inter system handover from UTRAN/To GSM/Speech/Failure (L1 Synchronization) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.7.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.7.2 Conformance requirement | If the UE does not succeed in establishing the connection to the target radio access technology, it shall:
1> revert back to the UTRA configuration;
1> establish the UTRA physical channel(s) used at the time for reception of HANDOVER FROM UTRAN COMMAND;
…
1> transmit the HANDOVER FROM UTRAN FAILURE message setting the ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.7.3 Test purpose | To test that the UE reactivates its old configuration and transmit a HANDOVER FROM UTRAN FAILURE message, which is set to "physical channel failure" in IE "Inter-RAT Handover failure cause", when it receives a HANDOVER FROM UTRAN COMMAND and the connection to GSM for handover cannot be established due to failure in L1 ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.7.4 Method of test | Initial conditions
System Simulator : 2 cells - Cell 1 is UTRAN, Cell 9 is GSM. GSM 51.010 section 40 shall be referenced for the default parameters, and clause 26.6.5.1 shall be referenced for cell allocation of cell 9.
UE: Idle state (state 2 or state 7) as specified in clause 7.4 of TS 34.108, depending on the CN do... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.7.5 Test requirement | After step 7 the SS shall receive HANDOVER FROM UTRAN FAILURE message via the old UTRA configuration. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.8 Inter system handover from UTRAN/To GSM/Speech/Failure (Invalid Inter-RAT message) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.8.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.8.2 Conformance requirement | If the IE "Inter-RAT message" received within the HANDOVER FROM UTRAN COMMAND message does not include a valid inter RAT handover message in accordance with the protocol specifications for the target RAT, the UE shall perform procedure specific error handling as follows. The UE shall:
1> set the IE "failure cause" to t... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.8.3 Test purpose | To Test that the UE shall keep its old configuration and transmit a HANDOVER FROM UTRAN FAILURE message, which is set to "Inter-RAT protocol error" in IE "Inter_RAT HO failure cause", when it receives a Handover From UTRAN message, with the IE "Inter-RAT message" received within the HANDOVER FROM UTRAN COMMAND message ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.8.4 Method of test | Initial conditions
System Simulator : 1 UTRAN cell.
UE : CC State U10 in cell 1
Related ICS/IXIT statement(s)
UE supports both GSM and UTRAN Radio Access Technologies,
UE supports GSM FR,
UE supports UTRAN AMR,
UE supports GSM-P, GSM-E, GSM-DCS, GSM-450, GSM-480.
Foreseen final state of the UE
The UE is in CC state U10... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.8.5 Test requirement | In step 3 the SS shall receive HANDOVER FROM UTRAN FAILURE message on the old channel of the UTRAN cell. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.9 Inter system handover from UTRAN/To GSM/Speech/Failure (Unsupported configuration) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.9.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.9.2 Conformance requirement: | If:
…
- the UTRAN instructs the UE to use a non-supported configuration; or
…
the UE shall:
1> transmit a HANDOVER FROM UTRAN FAILURE message, setting the information elements as specified below:
2> include the IE "RRC transaction identifier"; and
2> set it to the value of "RRC transaction identifier" in the entry for ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.9.3 Test purpose | To test that the UE shall keep its old configuration and transmit a HANDOVER FROM UTRAN FAILURE message, which is set to "configuration unacceptable" in IE "Inter-RAT Handover failure cause", when it receives a HANDOVER FROM UTRAN COMMAND message, with the IE "GSM message" containing a HANDOVER COMMAND message includin... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.9.4 Method of test | Initial conditions
System Simulator: 1 UTRAN cell.
UE: Idle state (state 2 or state 7) as specified in clause 7.4 of TS 34.108, depending on the CN domain(s) supported by the UE. Related
ICS/IXIT statement(s)
UE supports both GSM and UTRAN Radio Access Technologies,
UE supports GSM FR,
UE supports UTRAN AMR,
UE support... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.9.5 Test requirement | After step 2 the SS shall receive a HANDOVER FROM UTRAN FAILURE message via the old UTRA configuration. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.10 Inter system handover from UTRAN/To GSM/Speech/Failure (Reception by UE in CELL_FACH) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.10.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.10.2 Conformance requirement | If the UE receives HANDOVER FROM UTRAN COMMAND while in CELL_FACH, the UE shall:
1> transmit a HANDOVER FROM UTRAN FAILURE message, setting the information elements as specified below:
2> include the IE "RRC transaction identifier"; and
2> set it to the value of "RRC transaction identifier" in the entry for the HANDOVE... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.10.3 Test purpose | The UE shall keep its old configuration when the UE receives a HANDOVER FROM UTRAN COMMAND message when in CELL_FACH state and then transmit a HANDOVER FROM UTRAN FAILURE message on the DCCH using AM RLC, which sets value "protocol error" in IE "Inter_RAT HO failure cause" and is set to "Message not compatible with rec... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.10.4 Method of test | Initial conditions
System Simulator : 1 UTRAN Cell
UE : RRC State CS-DCCH_FACH (state 6-6) as specified in clause 7.4 of TS 34.108, on Cell 1
Related ICS/IXIT statement(s)
UE supports both GSM and UTRAN Radio Access Technologies,
UE supports GSM FR,
UE supports UTRAN AMR,
UE supports GSM-P, GSM-E, GSM-DCS, GSM-450, GSM... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.10.5 Test requirement | After step 2 the SS shall receive HANDOVER FROM UTRAN FAILURE message on the old channel of the UTRAN cell. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.11 Inter system handover from UTRAN/To GSM/Speech/Failure (Invalid message reception) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.11.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.11.2 Conformance requirement: | If the HANDOVER FROM UTRAN COMMAND message contains a protocol error causing the variable PROTOCOL_ERROR_REJECT to be set to TRUE according to clause 9, the UE shall perform procedure specific error handling as follows. The UE shall:
1> set the IE "RRC transaction identifier" in the HANDOVER FROM UTRAN FAILURE message ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.11.3 Test purpose | The UE shall keep its old configuration when the UE receives a Handover From UTRAN message that cause the variable PROTOCOL_ERROR_REJECT to be set to TRUE. It shall then transmit a HANDOVER FROM UTRAN FAILURE message on the uplink DCCH. The IE "Protocol error information" shall contain an IE "Protocol error cause" set ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.11.4 Method of test | Initial conditions
System Simulator : 1 UTRAN cell.
UE : CC State U10 in cell 1
Related ICS/IXIT statement(s)
UE supports both GSM and UTRAN Radio Access Technologies,
UE supports GSM FR,
UE supports UTRAN AMR,
UE supports GSM-P, GSM-E, GSM-DCS, GSM-450, GSM-480.
Foreseen final state of the UE
The UE is in CC state U10... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.11.5 Test requirement | In step 3 the SS shall receive HANDOVER FROM UTRAN FAILURE message in the UTRAN cell. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.12 Inter system handover from UTRAN/To GSM/Speech/Failure (Physical channel Failure and Reversion Failure) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.12.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.12.2 Conformance requirement | 1. This section applies to R99 & Rel-4 releases:
If the UE does not succeed in establishing the connection to the target radio access technology, it shall:
1> revert back to the UTRA configuration;
1> establish the UTRA physical channel(s) used at the time for reception of HANDOVER FROM UTRAN COMMAND;
1> if the UE does... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.12.3 Test purpose | The UE shall perform a cell update when the UE fails to revert to the old configuration after the detection of physical channel failure in the target RAT cell as given in the HANDOVER FROM UTRAN COMMAND message. After the UE completes the cell update procedure, the UE shall transmit a HANDOVER FROM UTRAN FAILURE messag... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.12.4 Method of test | Initial conditions
System Simulator: 2 cells - Cell 1 is UTRAN, Cell 9 is GSM. GSM 51.010 section 40 shall be referenced for the default parameters, and clause 26.6.5.1 shall be referenced for cell allocation of cell 9.
SYSTEM INFORMATION BLOCK TYPE 1 (see specific message contents).
UE: Idle state (state 2 or state 7)... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.12.5 Test requirement | After step 5 the SS shall receive a CELL UPDATE message.
At step 9 the SS shall receive a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message.
At step 10 the SS shall receive a HANDOVER FROM UTRAN FAILURE message via the new UTRA configuration.
Note: For R99 and Rel-4 UEs the messages in Steps 9 and 10 may be received in... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.13 Inter system handover from UTRAN/To GSM/ success / call under establishment | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.13.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.13.2 Conformance requirement | The UE shall be able to receive a HANDOVER FROM UTRAN COMMAND message and perform an inter-RAT handover, even if no prior UE measurements have been performed on the target cell.
The UE shall:
1> establish the connection to the target radio access technology, by using the contents of the IE "Inter-RAT message". This IE ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.13.3 Test purpose | To test that the UE supporting both GSM and UTRAN performs handover from UTRAN to the indicated channel of GSM target cell when the UE receives a HANDOVER FROM UTRAN COMMAND in call establishment phase.
To test that the UE continues the call in the GSM cell, after successful completion of the Handover. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.13.4 Method of test | Initial conditions
System Simulator: 2 cells - Cell 1 is UTRAN, Cell 9 is GSM. GSM 51.010-1 26.6.5.1 section 40 shall be referenced for the default parameters, and clause 26.6.5.1 shall be referenced for cell allocation of cell 9 except the BCCH ARFCN for GSM 900 should be 18 and for GSM 1900 should be 646.
UE: CC Stat... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.13.5 Test requirement | At step 14 the SS shall receive SETUP message on the dedicated channel of the GSM cell. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.14 Inter system handover from UTRAN/To GSM/Speech/Success (stop of HS-DSCH reception) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.14.1 Definition and applicability | All UEs which support FDD or TDD, HS-PDSCH and GSM. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.14.2 Conformance requirement | The UE shall be able to receive a HANDOVER FROM UTRAN COMMAND message and perform an inter-RAT handover, even if no prior UE measurements have been performed on the target cell.
The UE shall:
1> if HS-DSCH is configured for UTRA:
2> stop any HS-DSCH reception procedures;
2> clear any stored HS-PDSCH configuration;
2> a... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.14.3 Test purpose | 1. To test that the UE supporting both GSM and UTRAN hands over from a UTRAN serving cell to the indicated channel of GSM target cell when the UE is in the speech call active state, active PS RAB with HS-DSCH reception and receives an HANDOVER FROM UTRAN COMMAND.2. To verify that UE stops HS-DSCH reception after receiv... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.14.4 Method of test | System Simulator : 2 cells - Cell 1 is UTRAN, Cell 9 is GSM. GSM 51.010 clause 26.6.5.1 shall be referenced for the default parameters of cell 9.
UE: Idle state (state 2 or state 7) as specified in clause 7.4 of TS 34.108, depending on the CN domain(s) supported by the UE.
Related ICS/IXIT statement(s)
- UE supports bo... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.14.5 Test requirement | At step 1b the SS receives a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message indicating the successful download of the compressed mode parameters.
At step 1d the SS receives a MEASUREMENT REPORT message containing the measured results of the GSM cell.
At step 5 the SS receives a handover access burst on the traffic c... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.15 Inter system handover from UTRAN/To GSM/Speech/Failure(stop of HS-DSCH reception) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.15.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.15.2 Conformance requirement | If the UE does not succeed in establishing the connection to the target radio access technology, it shall:
1> revert back to the UTRA configuration;
NOTE: If configured for HS-DSCH while in UTRA, the UE will have still stored the IEs "Added or Reconfigured MAC-d flow" and "RB mapping Info".
…
1> transmit the HANDOVER F... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.15.3 Test purpose | To test that the UE reactivates the old configuration and uses this to transmit a HANDOVER FROM UTRAN FAILURE message to the network including IE "Inter-RAT Handover failure cause" which is set to "physical channel failure", when it receives an HANDOVER FROM UTRAN COMMAND and the connection to GSM for handover can not ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.15.4 Method of test | Initial conditions
System Simulator : 2 cells - Cell 1 is UTRAN, Cell 9 is GSM. GSM 51.010 clause 26.6.5.1 shall be referenced for the default parameters of cell 9.
UE: Idle state (state 2 or state 7) as specified in clause 7.4 of TS 34.108, depending on the CN domain(s) supported by the UE.
Related ICS/IXIT statement(... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.15.5 Test requirement | After step 4 the SS shall receive HANDOVER FROM UTRAN FAILURE message using the old UTRA configuration. UE shall not resume HS-DSCH reception |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.16 Inter system handover from UTRAN/To GSM/Simultaneous CS and PS domain services/Success/TBF Establishment Success | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.16.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.16.2 Conformance requirement | The purpose of the inter-RAT handover procedure is to, under the control of the network, transfer a connection between the UE and UTRAN to another radio access technology (e.g. GSM). This procedure may be used in CELL_DCH state. This procedure may be used when no RABs are established or when the established RABs are on... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.16.3 Test purpose | To test that in UTRAN cell when UE is in speech call active state and PS data call is established, UE performs handover to GSM RAT(cell not supporting DTM) after receiving HANDOVER FROM UTRAN COMMAND. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.16.4 Method of test | Initial conditions
System Simulator: 2 cells - Cell 1 is UTRAN, Cell 9 is GPRS with BCCH. 51.010 clause 40.1.1 shall be referenced for the default parameters, and clause 26.6.5.1 shall be referenced for cell allocation of cell 9
Parameter
Unit
Cell 9
(GSM)
Qsearch_I (TDD)
dBm
15 (never)
UE: Registered Idle Mode on CS/P... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.16.5 Test requirements | At step 6 the SS receives a handover access burst on the traffic channel of the GSM cell indicating that the UE has switched to the GSM cell.
At step 13 the SS receives a HANDOVER COMPLETE message indicating a successful handover to the GSM cell.
At step 16 SS receives ROUTING AREA UPDATE REQUEST message.
After step 19... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.17 Inter system handover from UTRAN/To GSM/DTM Support/Simultaneous CS and PS domain services/Success | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.17.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.17.2 Conformance requirement | The purpose of the inter-RAT handover procedure is to, under the control of the network, transfer a connection between the UE and UTRAN to another radio access technology (e.g. GSM). This procedure may be used in CELL_DCH state. This procedure may be used when no RABs are established or when the established RABs are on... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.17.3 Test purpose | To verify that in UTRAN cell when UE (supporting DTM) is in speech call active state and PS data call is established, UE performs handover to GSM RAT after receiving HANDOVER FROM UTRAN COMMAND. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.17.4 Method of test | Initial conditions
System Simulator: 2 cells - Cell 1 is UTRAN, Cell 9 is GPRS with BCCH. 51.010 clause 40.1.1 shall be referenced for the default parameters, and clause 26.6.5.1 shall be referenced for cell allocation of cell 9
DTM support is indicated in SI6 for cell 9. MAX_LAPDm is set to 111.
UE: Registered Idle... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.7.17.5 Test requirements | At step 6 the SS receives a handover access burst on the traffic channel of the GSM cell indicating that the UE has switched to the GSM cell.
At step 13 the SS receives a HANDOVER COMPLETE message indicating a successful handover to the GSM cell.
At step 15 SS receives ROUTING AREA UPDATE REQUEST message.
After step 18... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.8 Inter system cell reselection to UTRAN | [Editor's note: This test is FFS until R2000 core specification will be defined.] |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9 Inter system cell reselection from UTRAN | If not specified differently in the individual tests of this group, the Contents of System Information Block type 12 (FDD) shall be as specified in the following table:
- FACH measurement occasion info
Not Present
- Measurement control system information
- Use of HCS
Not used
- Cell selection and reselection quality me... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.1 Cell reselection if cell becomes barred or S<0; UTRAN to GPRS (CELL_FACH) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.1.1 Definition | Test to verify that if both a GSM/GPRS and UTRAN network is available, the UE performs cell reselection from UTRAN to GSM/GPRS if the UTRAN cell becomes barred or S falls below zero. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.1.2 Conformance requirement | 1. The purpose of the inter-RAT cell reselection procedure from UTRAN is to transfer, under the control of the UE and to some extent the UTRAN, a connection between the UE and UTRAN to another radio access technology (e.g. GSM/GPRS).
2. This procedure is applicable in states CELL_FACH, CELL_PCH or URA_PCH. When the UE ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.1.3 Test purpose | 1. To verify that the UE performs reselection from UTRAN to GPRS in the state CELL_FACH on the following occasions:
- Serving cell becomes barred.
- S<0 for serving cell.
2. To verify when the UE has succeeded in reselecting a cell in the target radio access technology and has initiated the establishment of a connectio... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.1.4 Method of test | Initial conditions
System Simulator: 3 cells – Cell 1 is UTRAN FDD, Cell 2 is GPRS and Cell 3 is GSM. 51.010 clauses 20.22 and 40.1.1 shall be referenced for the default parameters of cell 2. 51.010 clause 26.6.5.1 shall be referenced for the default parameters of cell 3. When executing the test in FDD band II or FDD b... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.1.5 Test Requirements | In step f), the UE shall respond on Cell 2
In step g), the UE shall not respond in UTRAN cell.
In step i), the UE shall respond on Cell 2 after the signal level is reduced.
8.3.9.1a Cell reselection if cell becomes barred or S<0; UTRAN to GPRS (CELL_FACH), 1.28Mcps TDD
8.3.9.1a.1 Definition
Test to verify that if both ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.2 Cell reselection if cell becomes barred or S<0; UTRAN to GPRS (URA_PCH) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.2.1 Definition | Test to verify that if both a GSM/GPRS and UTRAN network is available, the UE performs cell reselection from UTRAN to GSM/GPRS if the UTRAN cell becomes barred or S falls below zero. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.2.2 Conformance requirement | 1. The purpose of the inter-RAT cell reselection procedure from UTRAN is to transfer, under the control of the UE and to some extent the UTRAN, a connection between the UE and UTRAN to another radio access technology (e.g. GSM/GPRS).
2. This procedure is applicable in states CELL_FACH, CELL_PCH or URA_PCH.
When the UE ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.2.3 Test purpose | To verify that the UE performs reselection from UTRAN to GPRS in the state URA_PCH on the following occasions:
- Serving cell becomes barred.
- S<0 for serving cell. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.2.4 Method of test | Initial conditions
System Simulator: 2 cells – Cell 1 is UTRAN FDD, Cell 9 is GPRS. 51.010 clauses 20.22 and 40.1.1 shall be referenced for the default parameters of cell 9.
All cells belong to the same PLMN. UTRAN and GPRS cells belong to different location area.
The Inter-RAT Cell Info List of Cell 1 (UTRAN) refers t... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.2.5 Test Requirements | In step f), the UE shall respond on Cell 9.
In step g), the UE shall not respond in UTRAN cell.
In step i), the UE shall respond on Cell 9 after Qrxlevmin is increased.
8.3.9.2a Cell reselection if cell becomes barred or S<0; UTRAN to GPRS (URA_PCH), 1.28Mcps TDD
8.3.9.2a.1 Definition
Test to verify that if both a GSM/... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.3 Cell reselection if cell rank changes; UTRAN to GPRS (UE in CELL_FACH fails to complete an inter-RAT cell reselection) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.3.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.3.2 Conformance requirement | If the inter-RAT cell reselection fails, the UE shall:
1> resume the connection to UTRAN using the resources used before initiating the inter-RAT cell reselection procedure.
References
TS 25.331, clause 8.3.9.4 |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.3.3 Test purpose | To verify if the inter-RAT cell reselection fails before the UE in CELL_FACH succeeds in initiating the establishment of a connection to the GPRS cell, the UE shall:
- resume the connection to UTRAN using the resources used before initiating the inter-RAT cell reselection procedure. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.3.4 Method of test | Initial conditions
System Simulator: 2 cells – Cell 1 is UTRAN, Cell 9 is GPRS. 51.010 clauses 20.22 and 40.1.1 shall be referenced for the default parameters of cell 9.
All cells belong to the same PLMN.
The Inter-RAT Cell Info List of Cell 1 (UTRAN) refers to Cell 9 (GPRS).
The 3G Neighbour Cell Description of Cell 9... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.3.5 Test Requirements | After step e, the UE remains in CELL_FACH in cell 1. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.4 Cell reselection if S<0; UTRAN to GPRS (UE in CELL_PCH fails to complete an inter-RAT cell reselection) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.4.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.4.2 Conformance requirement | If the inter-RAT cell reselection fails, the UE shall:
1> resume the connection to UTRAN using the resources used before initiating the inter-RAT cell reselection procedure.
References
TS 25.331, clause 8.3.9.4 |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.4.3 Test purpose | To verify if the inter-RAT cell reselection fails before the UE in CELL_PCH succeeds in initiating the establishment of a connection to the GPRS cell, the UE shall:
- resume the connection to UTRAN using the resources used before initiating the inter-RAT cell reselection procedure. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.4.4 Method of test | Initial conditions
System Simulator: 2 cells – Cell 1 is UTRAN FDD, Cell 9 is GPRS. 51.010 clauses 20.22 and 40.1.1 shall be referenced for the default parameters of cell 9.
All cells belong to the same PLMN.
The Inter-RAT Cell Info List of Cell 1 (UTRAN) refers to Cell 9 (GPRS).
The 3G Neighbour Cell Description of Ce... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.4.5 Test Requirements | In step f, the UE remains in CELL_PCH in cell 1.
8.3.9.4a Cell reselection if S<0; UTRAN to GPRS (UE in CELL_PCH fails to complete an inter-RAT cell reselection), 1.28Mcps TDD
8.3.9.4a.1 Definition
8.3.9.4a.2 Conformance requirement
If the inter-RAT cell reselection fails, the UE shall:
1> resume the connection to UTRA... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.5 Successful Cell Reselection with RAU – Qoffset value modification; UTRAN to GPRS (CELL_FACH) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.3.9.5.1 Definition |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.