hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.23.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.23.2 Conformance requirement
1. When event 1C is configured in the UE, the UE shall: 1> if "Measurement quantity" is "pathloss" and Equation 1 below is fulfilled for one or more primary CPICHs, or if "Measurement quantity" is "CPICH Ec/N0" or "CPICH RSCP", and Equation 2 below is fulfilled for one or more primary CPICHs, for each of these primary ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.23.3 Test Purpose
1.A To confirm that the UE sends MEASUREMENT REPORT message if event 1C is configured, and number of cells in active set is greater than or equal to 'Replacement activation threshold' parameter, and if monitored or detected primary CPICH on same frequency becomes better than a primary CPICH in active set. 1.B To confir...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.23.4 Method of test
Initial Condition System Simulator: 3 cells – The initial configurations of the 3 cells in the SS shall follow the values indicated in the column marked "T0" in table 8.4.1.23-1. The table is found in "Test Procedure" clause. UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell 1 as specified in cl...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.23.5 Test Requirement
2.A In step 3a a R99 or Rel-4 UE shall not send MEASUREMENT REPORT message, but a Rel-5 and onwards UE shall send a MEASUREMENT REPORT message indicating event 1D. 1.A In steps 7 and 8 the UE shall send MEASUREMENT REPORT message indicating event 1C. IE 'Cell measurement event results' in MEASUREMENT REPORT message sha...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.24 Measurement Control and Report: Inter-frequency measurement for event 2A
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.24.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.24.2 Conformance requirement
When event 2a is configured in the UE within a measurement, the UE shall: 1> when the measurement is initiated or resumed: 2> store the used frequency in the variable BEST_FREQUENCY_2A_EVENT. 1> if equation 1 below has been fulfilled for a time period indicated by "Time to trigger" for a frequency included for that eve...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.24.3 Test Purpose
1.A To confirm that the UE sends MEASUREMENT REPORT message if event 2A is configured, and if any of the non- used frequencies quality estimate becomes better than the currently used frequency quality estimate. 1.B To confirm that the UE does not send MEASUREMENT REPORT message indicating event 2A if hysteresis conditi...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.24.4 Method of test
Initial Condition System Simulator: 2 cells – The initial configurations of the 2 cells in the SS shall follow the values indicated in the column marked "T0" in table 8.4.1.24-1. The table is found in "Test Procedure" clause. UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell 1 as specified in cl...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.24.5 Test Requirement
1.A In step 13 the UE shall send MEASUREMENT REPORT message indicating event 2A. IE ' Inter-frequency Cells ' in MEASUREMENT REPORT message shall contain frequency information and primary scrambling code (for FDD) or Cell parameters ID (forTDD) of Cell 4. 1.B In step 6, the UE shall not send MEASUREMENT REPORT message...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.25 Measurement Control and Report: Inter-frequency measurement for events 2B and 2E
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.25.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.25.2 Conformance requirement
When event 2b is configured in the UE within a measurement, the UE shall: 1> if equations 1 and 2 below have been fulfilled for a time period indicated by "Time to Trigger" from the same instant, respectively for one or several non-used frequencies included for that event and for the used frequency: 2> if any of those ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.25.3 Test Purpose
1. To confirm that the UE sends MEASUREMENT REPORT message when event 2E is configured and the estimated quality of a non-used frequency is below the value of the IE "Threshold non-used frequency". This MEASUREMENT REPORT message shall contain at least the best primary CPICH info (for FDD) or primary CCPCH info (for TD...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.25.4 Method of test
Initial Condition System Simulator: 2 cells – The initial configurations of the 2 cells in the SS shall follow the values indicated in the column marked "T0" in table 8.4.1.25-1. The table is found in "Test Procedure" clause. UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell 1 as specified in cl...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.25.5 Test Requirement
1. In step 4 the UE shall send MEASUREMENT REPORT message indicating event 2E. IE "Cell measurement event results" in this message shall contain frequency information and primary scrambling code(for FDD) or Cell parameters ID (TDD) of Cell 4. 2. In step 8 the UE shall send MEASUREMENT REPORT message indicating event 2...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.26 Measurement Control and Report: Measurement for events 2D and 2F
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.26.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.26.2 Conformance requirement
When event 2d is configured in the UE within a measurement, the UE shall: 1> if equation 1 below has been fulfilled for the used frequency during the time "Time to trigger": 2> if the variable TRIGGERED_2D_EVENT is set to FALSE: 3> set the variable TRIGGERED_2D_EVENT to TRUE; 3> send a measurement report with IEs set a...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.26.3 Test Purpose
1. To confirm that the UE sends MEASUREMENT REPORT message when event 2F is configured and estimated quality of the currently used frequency is above the value of the IE "Threshold used frequency". 2. To confirm that the UE sends MEASUREMENT REPORT message when event 2D is configured and estimated quality of the curren...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.26.4 Method of test
Initial Condition System Simulator: 1 cells – The initial configurations of the cell in the SS shall follow the values indicated in the column marked "T0" in table 8.4.1.26-1. The table is found in "Test Procedure" clause. UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell 1 as specified in claus...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.26.5 Test Requirement
1. In step 5 the UE shall send MEASUREMENT REPORT message indicating event 2F. 2. In step 7 the UE shall send MEASUREMENT REPORT message indicating event 2D.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.27 Measurement Control and Report: UE internal measurement for events 6A and 6B
8.4.1.27.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.27.2 Conformance requirement
When event 6A is ordered by UTRAN in a measurement control message, the UE shall send a measurement report when the UE transmission power (for TDD within a single TS) becomes larger than a predefined threshold. The corresponding report identifies the threshold that was exceeded. When event 6B is ordered by UTRAN in a m...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.27.3 Test Purpose
1. To confirm that the UE performs UE internal measurements and reporting for events 6A and 6B, when requested by the UTRAN to do so in the MEASUREMENT CONTROL message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.27.4 Method of test
Initial Condition System Simulator: 1 cell, cell 1. UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell 1 as specified in clause 7.4 of TS 34.108, depending on the CN domain supported by the UE. Test Procedure The UE is in CELL_DCH state in cell 1, after successfully executing procedures P11 or P1...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.27.5 Test Requirement
After step 3, the UE shall transmit MEASUREMENT REPORT message, containing measured results for UE transmitted power. The 'Event results' IE contains event identity 6A. After step 5, the UE shall transmit MEASUREMENT REPORT message, containing measured results for UE transmitted power. The 'Event results' IE contains e...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.28 Measurement Control and Report: UE internal measurement for events 6F (FDD) and 6G
8.4.1.28.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.28.2 Conformance requirement
When event 6F is ordered by UTRAN in a MEASUREMENT CONTROL message, the UE shall send a measurement report message when the UE Rx-Tx time difference becomes larger than the threshold defined by the IE "UE Rx-Tx time difference threshold". When event 6G is ordered by UTRAN in a MEASUREMENT CONTROL message, the UE shall ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.28.3 Test Purpose
1. To confirm that the UE performs UE internal measurements and reporting for events 6F and 6G, when requested by the UTRAN to do so in the MEASUREMENT CONTROL message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.28.4 Method of test
Initial Condition System Simulator: 2 cells – The initial configuration of the cells in the SS shall follow the values indicated in table 6.1.2 of TS 34.108. UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell 1 as specified in clause 7.4 of TS 34.108, depending on the CN domain supported by the U...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.28.5 Test Requirement
After step 5, the UE shall transmit MEASUREMENT REPORT message, containing measured results for UE Rx-Tx time difference. The 'Event results' IE contains event identity 6F. After step 7, the UE shall transmit MEASUREMENT REPORT message, containing measured results for UE Rx-Tx time difference. The 'Event results' IE co...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.29.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.29.2 Conformance requirement
Upon reception of a MEASUREMENT CONTROL message the UE shall perform actions specified in TS 25.331 subclause 8.6 unless otherwise specified below. The UE shall: 1> read the IE "Measurement command"; 1> if the IE "Measurement command" has the value "setup": 2> store this measurement in the variable MEASUREMENT_IDENTITY...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.29.3 Test Purpose
1. To verify that in CELL_FACH state when event 4a triggered at TVM set up UE sends Measurement Report with correct measurement identity and indication of UL transport channel type, radio bearer identities and corresponding RLC buffer payloads in number of bytes. 2 To verify that in CELL_FACH state when event 4a trigge...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.29.4 Method of test
Initial Condition System Simulator: 1 cell UE: Idle state (State 3 or State 7) as specified in clause 7.4 of TS 34.108. System Information Block type 11 or 12 does not include Traffic Volume measurement system information. Test Procedure The UE is brought to the CELL_FACH state after a successful incoming call attempt....
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.29.5 Test Requirement
In step 3 UE sends MEASUREMENT REPORT with correct measurement identity indication. RB identity and RLC buffers payload has reasonable values. The IE "measured results on RACH", containing the measurement value for cell 1's CPICH RSCP (for FDD) or P-CCPCH RSCP (for TDD) shall be included in this message. In step 4, 4d ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.30.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.30.2 Conformance requirement
Upon reception of a MEASUREMENT CONTROL message the UE shall perform actions specified in TS 25.331 subclause 8.6 unless otherwise specified below. The UE shall: 1> read the IE "Measurement command"; 1> if the IE "Measurement command" has the value "setup": 2> store this measurement in the variable MEASUREMENT_IDENTITY...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.30.3 Test Purpose
1. To verify that in CELL_DCH state when event 4a or 4b triggered at setup TVM UE sends RRC: Measurement Report with correct measurement identity and indication of uplink transport channel type and identity, radio bearer identities and corresponding RLC buffer payloads in number of bytes. 2. To verify that in CELL_DCH ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.30.4 Method of test
Initial Condition System Simulator: 1 cell UE: Idle state (State 3 or State 7) as specified in clause 7.4 of TS 34.108. System Information Block type 11 nor 12 does not include Traffic Volume measurement system information. Test Procedure The UE is brought to the CELL_DCH state after a successful incoming call attempt....
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.30.5 Test Requirement
In steps 4, 5, 6, 7, 7b and 7d UE sends RRC: MEASUREMENT REPORT with correct measurement identity indication. RB identity and RLC buffers payload has correct values. Measurement identity, transport channel type, transport channel identity and event identity has to match with set values. 8.4.1.31 Measurement Control and...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.31.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.31.2 Conformance requirement
A UE supporting both FDD (or TDD) and GSM shall be able to perform the GSM RSSI measurement and the GSM Initial BSIC identification measurement. If, according to its capabilities, the UE requires compressed mode to perform GSM RSSI measurements, the UE shall perform GSM RSSI measurements in the gaps of a compressed mod...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.31.3 Test Purpose
Purpose of this test is to verify that UE is capable to perform GSM RSSI and GSM Initial BSIC identification measurements.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.31.4 Method of test
Initial Condition System Simulator: 1 UTRAN FDD cell (or TDD cell) and 2 GSM cells. Parameter Unit Cell 1 (GSM) Cell 2 (GSM) Test Channel # 1 2 RF Signal Level dBm -70 -85 BCCH ARFCN # Value according to the GSM band under test (see 3GPP 34.123-1 table 6.5 for details on the ARFCN) Value according to the GSM band under...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.31.5 Test Requirement
In step 5 and step 6 UE reports correctly GSM RSSI values. In step 8 UE reports correctly BSIC values. In step 9 UE sends the next periodical report. Reporting period is the requested one.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.32 Void
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.33 Measurement Control and Report: Inter-RAT measurement, event 3a
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.33.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.33.2 Conformance requirement
1. When this event is ordered by UTRAN in a MEASUREMENT CONTROL message the UE shall send a report when the estimated quality of the currently used frequency is below the value of the IE "Threshold own system" and the hysteresis and time to trigger conditions are fulfilled and the estimated quality of the other system ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.33.3 Test Purpose
1. To confirm that the UE starts compressed mode and inter-RAT measurements when so required by the network in a MEASUREMENT CONTROL message. 2. To confirm that the UE sends MEASUREMENT REPORT message if event 3a is configured, if the quality of the currently used UTRAN frequency is below a given threshold and the esti...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.33.4 Method of test
Initial Condition System simulator: 1 UTRAN FDD cell (or TDD cell) and 3 GSM cells. The initial configurations of the 3 cells in the SS shall follow the values indicated in the column marked T0. The table is found in "Test procedure". The UTRAN FDD cell shall use UARFCN according to the band under test except in the ca...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.33.5 Test requirement
The UE shall not send any measurement report between instants T1 and T2. Event 3a shall be triggered in the UE (i.e. the transmission of the MEASUREMENT REPORT) after instant T2. Between instants T2 and T3, no MEASUREMENT REPORT message shall be received from the UE (since the hysteresis condition for triggering event ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.34 Measurement Control and Report: Inter-RAT measurement, event 3b
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.34.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.34.2 Conformance requirement
If the IE "Inter-RAT cell info list" is received in a MEASUREMENT CONTROL message, the UE shall update the variable CELL_INFO_LIST accordingly and in the following order. The UE shall: - if the IE "Removed Inter-RAT cells" is received, at the position indicated by the IE "Inter-RAT cell id": - clear the cell informatio...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.34.3 Test Purpose
1 To confirm that the UE sends MEASUREMENT REPORT message if event 3b is configured, if the estimated quality of the other system is below a given threshold. 2 To confirm that the hysteresis and time to trigger behaviours for event 3b are correctly implemented. To confirm that the UE updates the list of inter-RAT cel...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.34.4 Method of test
Initial Condition System simulator: 1 UTRAN FDD cell (or TDD cell) and 3 GSM cells. The initial configurations of the 3 GSM cells in the SS shall follow the values indicated in the column marked T0. The table is found in "Test procedure". The UTRAN FDD cell shall use UARFCN according to the band under test except in t...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.34.5 Test requirement
Between instants T0 and T1, the UE shall not send any MEASUREMENT REPORT message to the SS. Event 3b shall be triggered in the UE (i.e. the transmission of the first MEASUREMENT REPORT message shall begin) after instant T1. After the reception by the UE of the second MEASUREMENT CONTROL message, the UE shall begin to t...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.35 Measurement Control and Report: Inter-RAT measurement, event 3c
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.35.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.35.2 Conformance requirement
When event 3c is configured in the UE within a measurement, the UE shall: 1> if the other RAT is GSM, and if IE "BSIC verification required" is set to "required": 2> if equation 1 below has been fulfilled for a time period indicated by "time to trigger" for one or several GSM cells that match any of the BCCH ARFCN and ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.35.3 Test Purpose
1 To confirm that the UE sends MEASUREMENT REPORT message if event 3c is configured, and if the quality of the other system becomes better than the given threshold for event 3c. 2 To confirm that no other UE MEASUREMENT REPORT message is sent by the UE for a cell that has already triggered event 3c as long as the hys...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.35.4 Method of test
Initial Condition System simulator: 1 UTRAN FDD cell (or TDD cell) and 2 GSM cells. The initial configurations of the 2 GSM cells in the SS shall follow the values indicated in the column marked T0. The table is found in "Test procedure". UE: CELL CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.35.5 Test requirement
After instant T1, since the cell individual offset for GSM cell 1 is +10 dB, event 3c shall be triggered in the UE, i.e. the UE shall begin to transmit a MEASUREMENT REPORT to the SS. Note that GSM cell 2 has not triggered event 3c even though the RF signal strength for GSM cell 2 is the same as for cell 1, because the...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.36 Measurement Control and Report: Inter-RAT measurement, event 3d
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.36.1 Definition
-
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.36.2 Conformance requirement
When event 3d is configured in the UE within a measurement, the UE shall: 1> if the other RAT is GSM, and if IE "BSIC verification required" is set to "required": 2> when the measurement is initiated or resumed: 3> store in the variable BEST_CELL_3D_EVENT the Inter-RAT cell id of the GSM cell that has the best measured...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.36.3 Test Purpose
1. To confirm that the UE sends MEASUREMENT REPORT message if event 3d is configured, and if the best cell changes in the other system. To confirm that no other UE MEASUREMENT REPORT message is sent by the UE for a cell that has already triggered event 3d as long as the hysteresis condition for triggering once again ev...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.36.4 Method of test
Initial Condition System simulator: 1 UTRAN FDD cell (or TDD cell) and 2 GSM cells. The initial configurations of the 2 GSM cells in the SS shall follow the values indicated in the column marked T0. The table is found in "Test procedure". UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell 1 (UTRA...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.36.5 Test requirement
Shortly after the UE has received the first MEASUREMENT CONTROL message it shall transmit a MEASUREMENT REPORT to the SS. After instant T1, the UE shall begin to transmit a MEASUREMENT REPORT triggered by event 3d to the SS. After receiving the second MEASUREMENT CONTROL message, the UE shall then stop running compress...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.37 Measurement Control and Report: UE internal measurement, event 6c
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.37.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.37.2 Conformance requirement
When this event is ordered by UTRAN in a measurement control message, the UE shall send a measurement report when the UE Tx power reaches its minimum value. Reference 3GPP TS 25.331 clause 14.6.2.3.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.37.3 Test Purpose
1. To confirm that the UE sends a measurement report for event 6c when the UE Tx power reaches its minimum value when event 6c has been configured in the UE through a MEASUREMENT CONTROL message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.37.4 Method of test
Initial Condition System simulator: 1 UTRAN cell. UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell 1 as specified in clause 7.4 of TS 34.108, depending on the CN domain supported by the UE. Test procedure The UE is initially in CELL_DCH state as specified in clause 7.4 of TS 34.108. The SS send...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.37.5 Test requirement
The UE shall then begin transmitting a MEASUREMENT REPORT message to SS triggered by event 6c when its transmit power has reached its minimum output power. The minimum transmitted power of the UE shall be less than –50dBm.(for FDD), -49dBm (for 1.28 Mcps TDD), and -45dBm (for 3.84 Mcps TDD and 7.68 Mcps TDD)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.38 Measurement Control and Report: UE internal measurement, event 6d
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.38.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.38.2 Conformance requirement
When this event is ordered by UTRAN in a measurement control message, the UE shall send a measurement report when the UE Tx power reaches its maximum value. Reference 3GPP TS 25.331 clause 14.6.2.4
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.38.3 Test Purpose
1. To confirm that the UE sends a measurement report for event 6d when the UE Tx power reaches its maximum value when event 6d has been configured in the UE through a MEASUREMENT CONTROL message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.38.4 Method of test
Initial Condition System simulator: 1 UTRAN cell. UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell 1 as specified in clause 7.4 of TS 34.108, depending on the CN domain supported by the UE. Test procedure The UE is initially in CELL_DCH state as specified in clause 7.4 of TS 34.108. For FDD and...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.38.5 Test requirement
The UE shall then begin transmitting a MEASUREMENT REPORT message to SS triggered by event 6d when its transmit power has reached its maximum. The maximum transmitted power of the UE shall be according to the class of the UE.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.39 Measurement Control and Report: UE internal measurement, event 6e
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.39.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.39.2 Conformance requirement
When this event is ordered by UTRAN in a measurement control message, the UE shall send a measurement report when the UE RSSI reaches the UE's dynamic receiver range. Reference 3GPP TS 25.331 clause 14.6.2.5
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.39.3 Test Purpose
1. To confirm that the UE sends a measurement report for event 6e when the UE RSSI reaches the UE's dynamic receiver range when event 6e has been configured in the UE through a MEASUREMENT CONTROL message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.39.4 Method of test
Initial Condition System simulator: 1 UTRAN cell. UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell 1 as specified in clause 7.4 of TS 34.108, depending on the CN domain supported by the UE. Test procedure The UE is initially in CELL_DCH state as specified in clause 7.4 of TS 34.108. The SS incr...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.39.5 Test requirement
The UE shall then begin transmitting a MEASUREMENT REPORT message to SS triggered by event 6e when the UE RSSI reaches the UE's receiver dynamic range.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.40 Measurement Control and Report: Inter-RAT measurement, event 3C, in CELL_DCH state using sparse compressed mode pattern
8.4.1.40.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.40.2 Conformance requirement
1. Upon reception of a MEASUREMENT CONTROL message the UE shall perform actions specified in 3GPP TS 25.331 clause 8.6 unless otherwise specified below. The UE shall: - read the IE "Measurement command"; - if the IE "measurement command" has the value "setup": - store this measurement in the variable MEASUREMENT_IDENTI...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.40.3 Test Purpose
This test case is only applicable to UEs supporting both FDD and GSM, and which require compressed mode to perform the GSM related measurements. 1. To verify that the UE performs Inter-RAT measurement using a sparse compressed mode pattern as specified in the MEASUREMENT CONTROL message. 2. To verify that the UE send M...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.40.4 Method of test
Table 8.4.1.40.4-1 Sparse compressed mode pattern for Inter RAT measurement TGMP TGCFN TGPRC TGSN TGL1 TGL2 TGD TGPL1 TGPL2 Comment GSM carrier RSSI measurement Note 1 Inf. 4 7 Not sent undefined 16 See note 2 Set-up to monitor 12 GSM neighbours every second measurement period, i.e. every second 480ms period. GSM Initi...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.40.5 Test Requirement
After instant T1, since the cell individual offset for GSM cell 1 is +10 dB, event 3c shall be triggered in the UE, i.e. the UE shall begin to transmit a MEASUREMENT REPORT to the SS. Note that GSM cell 2 has not triggered event 3c even though the RF signal strength for GSM cell 2 is the same as for cell 1, because the...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.41 Measurement Control and Report: Additional Measurements list
8.4.1.41.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.41.2 Conformance requirement
For the measurement, which triggered the MEASUREMENT REPORT message, the UE shall: ….. 1> set the IE "Measured results" in the IE "Additional measured results" according to the IE "reporting quantity" for all measurements associated with the measurement identities included in the "Additional measurements list" stored i...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.41.3 Test Purpose
1. To confirm that the UE reports measured results for a referenced additional measurement. 2. To confirm that the UE transmits MEASUREMENT REPORT messages for a measurement, also if this measurement is referenced as an additional measurement by another measurement.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.41.4 Method of test
Initial Condition System Simulator: 1 cell, cell 1. UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell 1 as specified in clause 7.4 of TS 34.108, depending on the CN domain supported by the UE. Test Procedure The UE is in CELL_DCH state in cell 1, after successfully executing procedures P11 or P1...