hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.41.5 Test Requirement
After step 3, the UE shall periodically transmit a MEASUREMENT REPORT message for measurement identity 5. In addition to the CPICH RSCP, these reports shall also include the UL Tx power with a reasonable value. After step 6, the UE shall transmit a MEASUREMENT REPORT message, containing measured results for UE transmit...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.42 Measurement Control and Report: Change of Compressed Mode Method
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.42.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.42.2 Conformance requirement
If variable INVALID_CONFIGURATION has value FALSE after UE has performed the checks above, the UE shall: 1> if pattern sequence corresponding to IE "TGPSI" is already active (according to "Current TGPS Status Flag") in the variable TGPS_IDENTITY): 2> if the "TGPS Status Flag" in this message is set to "deactivate" for ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.42.3 Test purpose
To confirm that the UE supports change of compressed mode method included in a RADIO BEARER SETUP message. To confirm that the UE supports change of compressed mode method included in a RADIO BEARER RELEASE message.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.42.4 Method of test
Initial Condition System Simulator: 3 cells – Cell 1 on frequency f1, cell 4 on frequency f2 and cell 5 on frequency f3. UE: "PS-DCCH_DCH" (state 6-7) as specified in clause 7.4 of TS 34.108. This test case applies only for UEs requiring compressed mode to perform inter- frequency measurements and supporting both PS an...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.42.5 Test Requirement
After step 1, the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message to the SS to acknowledge the downloading of compressed mode parameters that were included in the PHYSICAL CHANNEL RECONFIGURATION message of step 1. After step 4, the UE shall transmit a MEASUREMENT REPORT message triggered by frequ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.43 Measurement Control and Report: Compressed Mode Reconfiguration
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.43.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.43.2 Conformance requirement
If variable INVALID_CONFIGURATION has value FALSE after UE has performed the checks above, the UE shall: 1> if pattern sequence corresponding to IE "TGPSI" is already active (according to "Current TGPS Status Flag") in the variable TGPS_IDENTITY): 2> if the "TGPS Status Flag" in this message is set to "deactivate" for ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.43.3 Test purpose
To confirm that the UE supports de- activation of compressed mode included in a RADIO BEARER SETUP message. To confirm that the UE supports reconfiguration of transport channel parameters (rate reduction PS RAB) and change of compressed mode method included in a TRANSPORT CHANNEL RECONFIGURATION message. To confirm tha...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.43.4 Method of test
Initial Condition System Simulator: 3 cells – Cell 1 on frequency f1, cell 4 on frequency f2 and cell 5 on frequency f3. UE: "CS-DCCH + DTCH_DCH" (state 6-9) as specified in clause 7.4 of TS 34.108. This test case applies only for UEs requiring compressed mode to perform inter- frequency measurements and supporting bot...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.43.5 Test Requirement
After step 1, the UE shall send a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message to the SS to acknowledge the downloading of the compressed mode parameters without activating compressed mode that were included in the PHYSICAL CHANNEL RECONFIGURATION message of step 1. After step 4, the UE shall send a RADIO BEARER S...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.44 Measurement Control and Report: Intra-frequency measurement for events 1H and 1I (TDD)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.44.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.44.2 Conformance requirement
When event 1h is configured in the UE, the UE shall: 1> if equation 1 is fulfilled for a time period indicated by "Time to trigger" and if that P-CCPCH is not included in the IE "cells triggered" in the variable TRIGGERED_1H_EVENT: 2> include that P-CCPCH in the IE "cells triggered" in the variable TRIGGERED_1H_EVENT; ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.44.3 Test Purpose
1. To confirm that the UE sends MEASUREMENT REPORT message if event 1I is configured and intra-frequency measurement indicates that Timeslot ISCP is above a certain threshold 2. To confirm that the UE sends MEASUREMENT REPORT message if event 1H is configured, and intra-frequency measurement indicates that Timeslot ISC...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.44.4 Method of test
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.44.4.1 3.84 Mcps option
<FFS>
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.44.4.2 1.28 Mcps option
Initial Condition System Simulator: 1 cell – The initial configurations of the cell in the SS shall follow the values indicated in the column marked "T1" in table 8.4.1.44.4.2-1. Threshold for events 1H and 1I are specified in table 8.4.1.44.4.2-2 UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cel...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.44.5 Test Requirement
The UE shall send one event 1H triggered measurement report, with a measurement reporting delay less than 400 ms from the beginning of time period T2. The UE shall send one event 1I triggered measurement report, with a measurement reporting delay less than 400 ms from the beginning of time period T3. The UE shall send ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.45 Measurement Control and Report: Intra-frequency measurement for event 1G (TDD)
8.4.1.45.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.45.2 Conformance requirement
When event 1G is configured in the UE, the UE shall: 1> if the equation 1 is fulfilled for a P-CCPCHs during the time "Time to trigger" and if that P-CCPCH is not included in the "primary CCPCH info" in the variable TRIGGERED_1G_EVENT: 2> include that P-CCPCH in "cells triggered" in the variable TRIGGERED_1G_EVENT; 2> ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.45.3 Test Purpose
1. To confirm that the UE sends MEASUREMENT REPORT message if event 1G is configured and intra-frequency measurement indicates change of best cell.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.45.4 Method of test
Initial Condition System Simulator: 2 cell(cell 1 and cell 2 are active).The initial configurations of the 2 cells in the SS shall follow the values indicated in the column marked "T0" in table 8.4.1.45-1. The table is found in "Test Procedure" clause. UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) i...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.45.5 Test Requirement
After step 1, the UE shall transmit MEASUREMENT REPORT message periodically with the interval of 64 seconds. After step 4, the UE shall not transmit any MEASUREMENT REPORT message. After step 6, the UE shall transmit MEASUREMENT REPORT message, containing measured results for P-CCPCH RSCP. The 'Event results' IE contai...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.46 Void
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.47 Measurement Control and Report: Event triggered periodic measurement for event 1B (FDD)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.47.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.47.2 Conformance requirement
When an intra-frequency measurement configuring event 1b is set up, the UE shall: 1> create a variable TRIGGERED_1B_EVENT related to that measurement, which shall initially be empty; 1> delete this variable when the measurement is released. When event 1B is configures in the UE, the UE shall: 1> if "Measurement quantit...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.47.3 Test Purpose
1. To confirm that the UE reverts to periodical measurement reporting of event 1B, after event 1B has been initially triggered, when primary CPICH currently measured by the UE leaves the reporting range. 2. To confirm that the event triggered periodic measurement reporting is terminated after UE no longer finds any mon...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.47.4 Method of test
Initial Condition System Simulator: 2 Cells – Cell 1, Cell 2 are active. UE: CS-DCCH+DTCH_DCH (State 6-9) or PS-DCCH+DTCH_DCH (State 6-10) in cell 1 as specified in clause 7.4 of TS 34.108, depending on the CN domain supported by the UE. Test Procedure Table 8.4.1.47-1 Parameter Unit Cell1 Cell2 T0 T1 T0 T1 UTRA RF Cha...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.47.5 Test requirement
After step 1, the UE shall send a MEASUREMENT REPORT message on the uplink DCCH. The message shall contain the IE "Event results" to report that Cell 2 has triggered intra-frequency event 1A. After step 3, the UE shall send an ACTIVE SET UPDATE COMPLETE message on the uplink DCCH indicating the successful addition of C...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.48 Measurement Control and Report: Combined Inter-frequency measurement for event 2b and Inter-RAT measurement, event 3a (FDD)
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.48.1 Definition
-
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.48.2 Conformance requirement
When event 2b is configured in the UE within a measurement, the UE shall: 1> if equations 1 and 2 below have been fulfilled for a time period indicated by "Time to Trigger" from the same instant, respectively for one or several non-used frequencies included for that event and for the used frequency: 2> if any of those ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.48.3 Test Purpose
1. To confirm that the UE sends MEASUREMENT REPORT message when event 2b and 3a are configured and estimated quality of the currently used frequency is below the value of the IE "Threshold used frequency" and the estimated quality of a non-used frequency is above the value of the IE "Threshold non-used frequency". This...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.48.4 Method of test
Initial Condition System Simulator: 2 UTRAN FDD cells and 1 GSM cell. The initial configurations of the 3 cells in the SS shall follow the values indicated in the column marked "T0" in table 8.4.1.48-1. The table is found in "Test Procedure" clause. The UTRAN FDD cell 4 shall use UARFCN according to the band under test...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.48.5 Test Requirement
1. In step 7 the UE shall send a MEASUREMENT REPORT message indicating event 2b. IE 'Inter-frequency Cells' in MEASUREMENT REPORT message shall contain frequency information and primary scrambling code of Cell 4. 2 In step 9 the UE shall send a MEASUREMENT REPORT message indicating event 3a with IE “Inter-RAT cell id” ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.49 Measurement Control and Report: Intra-frequency measurement for event 1J
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.49.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.49.2 Conformance requirement
When an intra-frequency measurement configuring event 1j is set up, the UE shall: 1> create a variable TRIGGERED_1J_EVENT related to that measurement, which shall initially be empty; 1> delete this variable when the measurement is released. When event 1J is configured in the UE, the UE shall: 1> if "Measurement quantit...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.49.3 Test Purpose
1. To confirm that the UE sends MEASUREMENT REPORT message if event 1J is configured, and the number of cells in the E-DCH active set is greater than or equal to ‘Replacement activation threshold’ parameter, and if the primary CPICH that is not included in the E-DCH active set but included in the DCH active set becomes...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.49.4 Method of Test
Initial Condition System Simulator: 3 cells – The initial configuration of the 3 cells in the SS shall follow the values indicated in the column marked “T0” in table 8.4.1.49-1. The table is found in “Test Procedure” clause UE: PS-DCCH +DTCH_HS-DSCH +DTCH_E-DCH (state 6-18) under condition A12 in Cell 1 as specified in...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.49.5 Test Requirement
In steps 7, 8, 18 and 19 the UE shall send a MEASUREMENT REPORT indicating event 1J. For steps 7 and 8 the IE ‘Cell measurement event results’ in the MEASUREMENT REPORT message should contain primary scrambling codes of Cell 3 and Cell 1. For steps 18 and 19 the IE ‘Cell measurement event results’ in the MEASUREMENT RE...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.50 Measurement reporting when moving from CELL_PCH to CELL_FACH
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.50.1 Definition and applicability
All UEs which support FDD and HS-PDSCH in CELL_PCH and URA_PCH.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.50.2 Conformance requirement
In CELL_PCH or URA_PCH state, the UE shall: 1> if the measurement reporting is not initiated according to subclause 8.5.40: 2> first perform the cell update procedure according to subclause 8.3.1, using the cause "uplink data transmission", in order to transit to CELL_FACH state; and then 2> transmit a MEASUREMENT REPO...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.50.3 Test purpose
1. To confirm that the UE performs measurements reporting on SRB2 when moving from Cell PCH state to Cell FACH state when HS-DSCH is configured with dedicated H-RNTI 2. To confirm that the UE performs measurements reporting with a cell update procedure when moving from Cell PCH state to Cell FACH state when HS-DSCH is ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.50.4 Method of test
Initial Condition System Simulator: 1 cell UE: CELL_FACH state as specified in clause 7.4 of TS 34.108, with a valid H-RNTI The UE is registered in both CS and PS domains. Test Procedure The UE is in the CELL_FACH state with HS-DSCH reception enabled. The SS transmits a PHYSICAL CHANNEL RECONFIGURATION message with IE ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.50.5 Test requirement
After step 2, UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message and move to CELL_PCH state. After step 4, the UE shall move to CELL_FACH state and transmits a RRC STATUS message and MEASUREMENT REPORT message on SRB2 containing the IE "Measured results on RACH" reporting the measured CPICH RSCP for ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.51 Measurement Control and Report: Inter-frequency measurement for events 2C for CSG cells
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.51.1 Definition
Test to verify the UE can report the 2c events for CSG cells.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.51.2 Conformance requirement
1. Event 2c: The estimated quality of a non-used frequency is above a certain threshold When an inter-frequency measurement configuring event 2c is set up, the UE shall: 1> create a variable TRIGGERED_2C_EVENT related to that measurement, which shall initially be empty; 1> delete this variable when the measurement is r...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.51.3 Test purpose
1. To confirm that the UE sends MEASUREMENT REPORT message when event 2c is configured and a non-used frequency is above a certain threshold. This MEASUREMENT REPORT message shall contain at least the best primary CPICH info (for FDD) on the non-used frequency that triggered the event and the best primary CPICH info is...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.51.4 Method of test
Initial Condition System Simulator: 4 cells: Cell 1, cell 4, cell 6 and cell5 are used. Column marked "T0" in table 8.4.1.51-1 found in "Test Procedure" clause denotes the initial power conditions. The CSG id of the Cell 5 is 2 and cell 6 is 3. Cell 4 does not broadcast CSG ID. Cell1 is on f1. Cell 4, cell 6 and cell 5...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.51.5 Test requirement
1. At step 7, the UE sends 2c event to the SS. IE "Inter-frequency measurement event results" in this message shall contain frequency information and primary scrambling code of Cell 5. 2. At step 9, the UE sends 2c event to the SS. IE "Inter-frequency measurement event results " in this message shall contain frequency ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.52 Measurement Control and Report: Inter-frequency measurement for events 2B for CSG cells
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.52.1 Definition
Test to verify the UE can report the 2b events for CSG cells.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.52.2 Conformance requirement
1: Event 2b: The estimated quality of the currently used frequency is below a certain threshold and the estimated quality of a non-used frequency is above a certain threshold. When an inter-frequency measurement configuring event 2b is set up, the UE shall: 1> create a variable TRIGGERED_2B_EVENT related to that measur...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.52.3 Test purpose
1. To confirm that the UE sends MEASUREMENT REPORT message when event 2B is configured and estimated quality of the currently used frequency is below the value of the IE "Threshold used frequency" and the estimated quality of a non-used frequency is above the value of the IE "Threshold non-used frequency". This MEASURE...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.52.4 Method of test
Initial Condition System Simulator: 4 cells: Cell 1, cell 4, cell 6 and cell 5 are used. Column marked "T0" in table 8.4.1.52-1 found in "Test Procedure" clause denotes the initial power conditions. The CSG id of the Cell5 is 2 and cell 6 is 3. Cell 4 does not broadcast CSG ID. Cell1 is on f1. Cell 4, cell 6 and cell 5...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.52.5 Test requirement
1. At step 7, the UE sends 2b event to the SS. IE "Inter-frequency measurement event results" in this message shall contain frequency information and primary scrambling code of Cell 5. 2. At step 9, the UE sends 2b event to the SS. IE "Inter-frequency measurement event results" in this message shall contain frequency i...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.53 Measurement Control and Report: Application layer measurement
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.53.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.53.2 Conformance requirement
25.331[8] clause 8.4.1 and clause 8.4.2 RRC MEASUREMENT procedure. Upon reception of a MEASUREMENT CONTROL message the UE shall perform actions specified in TS 25.331 subclause 8.4.1 and 8.4.2 unless otherwise specified below. The UE shall: 1> read the IE "Measurement command"; 1> if the IE "Measurement command" has th...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.53.3 Test Purpose
1. To confirm that UE in CELL_DCH, if receives Application layer measurement configuration, it shall forward the Application layer measurement report received from the upper layer in the uplink DCCH, and to confirm that UE transmit Application layer measurement over SRB4. 2. To confirm that UE won’t forward the Applica...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.53.4 Method of test
Initial Condition Radio environment: Static Channel: Normal propagation condition described in 34.108 [9] clause 5.2.2, ideal channel quality to ensure reliable data transfer in air interface; System Simulator: 1 cell UE: - The UE shall be operated under normal test conditions. - Registered Idle Mode on PS (state3). Te...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.53.5 Test Requirement
In step2 SS is not expected to receive any APPLICATION LAYER MEASUREMENT REPORT from UE; In step10 SS is expected to receive all the MEASUREMENT REPORTs received on SRB4 and each of the container is identical to the one in the corresponding GENERATE APPLICATION LAYER MEASUREMENT REPORT; In step14 SS is not expected to ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.54 Void
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.55 Void
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.56 Cell Update: Application layer measurement report available in URA_PCH
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.56.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.56.2 Conformance requirement
A UE shall initiate the cell update procedure in the following cases: 1> Uplink data transmission: … 1> Transfer of application layer measurement report: 2> if the UE is in URA_PCH, CELL_PCH or CELL_FACH state; and 2> if the UE has received a "Container for application layer measurement reporting" which has not yet bee...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.56.3 Test purpose
1. To confirm that the UE executes a cell update procedure when the UE has received a “Container for application layer measurement reporting” data which has not yet been sent if the UE is in URA_PCH state.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.56.4 Method of test
Initial Condition System Simulator: 1cell UE: Registered Idle Mode on PS (state3) Test Procedure The UE is initially in Registered Idle Mode on PS (state3), and then the procedure P5 specified in TS 34.108 [9] clause7 is called to make the UE to transit to CELL_DCH. To execute procedure P5, all specific message content...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.56.5 Test requirement
After step 6, the UE shall move to CELL_FACH state to initiate a cell update procedure and transmits a CELL UPDATE message which is set to “Container for application layer measurement reporting “in IE "Cell update cause". After step 8, the UE shall transmit a RADIO BEARER RECONFIGURATION COMPLETE message on the uplink ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.57 Cell Update: Application layer measurement report available in CELL_PCH
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.57.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.57.2 Conformance requirement
A UE shall initiate the cell update procedure in the following cases: 1> Uplink data transmission: … 1> Transfer of application layer measurement report: 2> if the UE is in URA_PCH, CELL_PCH or CELL_FACH state; and 2> if the UE has received a "Container for application layer measurement reporting" which has not yet bee...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.57.3 Test purpose
1. To confirm that the UE executes a cell update procedure when the UE has received a “Container for application layer measurement reporting” data which has not yet been sent if the UE is in CELL_PCH state.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.57.4 Method of test
Initial Condition System Simulator: 1cell UE: Registered Idle Mode on PS (state3). Test Procedure The UE is initially in Registered Idle Mode on PS (state3), and then the procedure P5 specified in TS 34.108 [9] clause7 is called to make the UE to transit to CELL_DCH. To execute procedure P5, all specific message conten...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.57.5 Test requirement
After step 6, the UE shall move to CELL_FACH state to initiate a cell update procedure and transmits a CELL UPDATE message which is set to “Container for application layer measurement reporting “in IE "Cell update cause". After step 8, the UE shall transmit a RADIO BEARER RECONFIGURATION COMPLETE message on the uplink ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.58 Cell Update: Application layer measurement report available in CELL_FACH
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.58.1 Definition
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.58.2 Conformance requirement
A UE shall initiate the cell update procedure in the following cases: 1> Uplink data transmission: … 1> Transfer of application layer measurement report: 2> if the UE is in URA_PCH, CELL_PCH or CELL_FACH state; and 2> if the UE has received a "Container for application layer measurement reporting" which has not yet bee...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.58.3 Test purpose
1. To confirm that the UE executes a cell update procedure when the UE has received a “Container for application layer measurement reporting” data which has not yet been sent if the UE is in CELL_FACH state.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.58.4 Method of test
Initial Condition System Simulator: 1cell UE: Registered Idle Mode on PS (state3). Test Procedure The UE is initially in Registered Idle Mode on PS (state3), and then the procedure P5 specified in TS 34.108 [9] clause7 is called to make the UE to transit to CELL_DCH. To execute procedure P5, all specific message conten...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.4.1.58.5 Test requirement
After step 5, the UE shall move to CELL_FACH state to initiate a cell update procedure and transmits a CELL UPDATE message which is set to “Container for application layer measurement reporting “in IE "Cell update cause". After step 7, the UE shall transmit a RADIO BEARER RECONFIGURATION COMPLETE message on the uplink ...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.5.1 MBMS Session Start
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.5.1.1 MBMS PTP Session Start at MCCH Acquisition in Idle mode / MBMS Selected Service
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.5.1.1.1 Definition
This test is applicable for all UEs that support MBMS broadcast services.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.5.1.1.2 Conformance requirement
The UE applies the MCCH acquisition procedure to determine the MBMS services available in the cell and to initiate reception of the services that the UE has joined. The procedure applies to all UEs supporting MBMS, irrespective of their state (idle, URA_PCH, CELL_PCH, CELL_FACH and CELL_DCH). … If the variable MBMS_ACT...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.5.1.1.3 Test purpose
To verify that the UE receives the MBMS info in idle mode state and to verify that the UE starts the reception of MBMS services at MCCH acquisition.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.5.1.1.4 Method of test
Initial condition System Simulator: 2 MBMS cells, Cell 21 and Cell 22. User Equipment: The UE is in Idle Mode as specified in clause 7.6 of TS 34.108. The UE is interested in the selected service to be provided by the SS (included in MBMS_ACTIVATED_SERVICES variable). Related ICS/IXIT statements - MBMS Broadcast servic...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.5.1.1.5 Test requirements
After step 2, after the UE has received a MBMS modified services Information message, the UE continues acquiring the MBMS information. At step 4, after the UE has received an MBMS unmodified services Information message including the IE “MBMS required UE action” set to Request PTP RB, the UE shall indicate to upper lay...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.5.1.2 MBMS PTP Session Start at MCCH Notification in CELL_PCH / MBMS Selected Service
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.5.1.2.1 Definition
This test is applicable for all UEs that support MBMS broadcast services.
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.5.1.2.2 Conformance requirement
The MBMS notification procedure is used by the UE to respond to a notification provided by UTRAN, indicating a change applicable for one or more MBMS services the UE has joined. The procedure applies to all UEs supporting MBMS, irrespective of their state (idle and connected mode: URA_PCH, CELL_PCH, CELL_FACH and CELL_...
4251e2eb3ecde7c73983ce7a4175ddf3
34.123-1
8.5.1.2.3 Test purpose
To verify that the UE in Cell_PCH state, correctly handle the Notification procedure after receiving the MODIFIED SERVICES INFORMATION message via MCCH.