paper_id int64 391 4.39B | publication_date stringlengths 10 10 | journal_id int64 61.7k 4.39B ⌀ | final_level_0_links listlengths 0 1.06k | final_level_1_links listlengths 0 9.76k | abstract stringlengths 1 58k ⌀ | micro_cluster_id int32 1 4.52k | short_label stringlengths 3 47 | long_label stringlengths 23 102 | keywords stringlengths 84 335 | new_title stringlengths 0 18.2k |
|---|---|---|---|---|---|---|---|---|---|---|
2,524,714,558 | 2017-01-01 | 58,516,903 | [] | [
1969397762,
2091248362,
2090132397,
2119356110,
2114826007
] | Most open pit mines around the world involve processes that are highly dependent on haulage by trucks. This setting implies that the consumption of tyres increases with the scale of mineral production. Moreover, the majority of the mining industry has adopted increased production strategies to absorb costs. Haulage cos... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Reducing environmental impacts via improved tyre wear management |
2,763,998,296 | 2018-01-01 | 177,423,656 | [] | [
1639032689
] | The main goal of coal quality control in lignite mines is to supply coal to power plants within certain quality constraints. Coal properties can affect the efficiency, reliability, and availability of both the boiler and the emission control units. This paper presents a new based integrated mine process simulation appr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Improving efficiency of thermal power plants through mine coal quality planning and control |
2,507,270,918 | 2016-12-01 | 194,185,345 | [
1985080107
] | [
2020999234,
2160763688,
2126311658,
1985080107,
2032132842,
2146612430,
2126258480,
1639032689,
2077791698,
1979015826
] | Abstract Determining the final destination of mined materials is counted as one of the most important challenges in mining. Cut-off grade is a criterion specifying the destination of mined materials relying on the commodity price, treatment method recovery, investment and operating costs. The development of mineral pro... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of KKT in determining the final destination of mined material in multi-processing mines |
3,088,939,069 | 2020-09-24 | 4,210,214,295 | [
2043345585,
1972121892,
1979015826,
2130796978
] | [
2060929952,
2094566145,
2020999234,
2000715618,
1972121892,
2126895748,
1918344999,
2160763688,
1551276924,
3217061993,
1985080107,
1534941005,
2043345585,
2130796978,
1979015826,
2185734033,
1969483356
] | Operations planning and management of a large open pit mine is an enormous and complex task, particularly for mines having long life. The long-term planning of open pit mine is a dynamic process and should be reviewed periodically for enhancing the NPV and life of mine. Pit optimization through soft computing can be ga... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Pit Optimization for Improved NPV and Life of Mine in Heterogeneous Iron Ore Deposit |
2,025,039,675 | 2013-01-01 | 4,306,401,280 | [] | [] | 1 Defence Research and Development Canada (DRDC), Centre for Security Science (CSS), National Defence Headquarters, Ottawa, ON, Canada K1A 0K7 2Manufacturing andMaterials Deptartment, School of Applied Sciences, Cranfield University, Cranfield, Bedfordshire MK43 0AL, UK 3Department of Mechanical Engineering, University... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Condition-Based Maintenance |
3,094,543,990 | 2020-10-19 | 2,764,600,758 | [
2151675709,
2261525379,
1563088657,
2188581537
] | [
1480376833,
2100495367,
2160815625,
2169245194,
2095181329,
2914259485,
2141975087,
2136922672,
2129763896,
2099736636,
2585206336,
2738226240,
1977177161,
2007535697,
4234698323,
2133321814,
1996021349,
1973333099,
2152208495,
2337981553,
2104442994,
2089487480,
20374600... | This study aimed to develop and assess the feasibility of different machine learning algorithms for predicting ore production in open-pit mines based on a truck-haulage system with the support of the Internet of Things (IoT). Six machine learning algorithms, namely the random forest (RF), support vector machine (SVM), ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Estimating Ore Production in Open-pit Mines Using Various Machine Learning Algorithms Based on a Truck-Haulage System and Support of Internet of Things |
2,130,076,908 | 2010-06-30 | 30,253,980 | [] | [] | One important critical value in mineral deposits is cutoff grade. The cutoff grade is defined as the value which discriminates between ore and waste with a given mineral deposit. In this study, the cutoff grade parameters such as SiO2 and CaO% are examined by statistical distribution model. This paper shows a procedure... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Examination of cutoff grade parameters in magnesite mineral deposit |
1,520,130,623 | 2005-01-01 | null | [] | [] | 1. Business Systems and Project Management 2. Data and Enterprise Information System Utilization 3. Emerging Technology 4. Geostatistics and Reserve Estimation 5. Open-Pit Mine Planning and Design 6. Process Control and Optimization 7. Real Time Mining Analytical Systems 8. Safety Systems 9. Simulation 10. Standardized... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of Computers and Operations Research in the Mineral Industry |
4,293,100,098 | 2022-07-07 | 4,306,463,075 | [] | [] | The Road Pavement Condition (RPC) represents one of the most important aspects of a country’s development. Maintaining an appropriate road service level and evaluating an effective road pavement maintenance programme is a major current challenge for Road Authorities (RAs). The road pavement damage represents the first ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Black boxes data for road pavement conditions monitoring: A case study in Florence |
135,252,757 | 2007-01-01 | 4,306,463,937 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modern Model Estimation Part 1: Gibbs Sampling |
2,953,920,677 | 2019-07-01 | 139,857,051 | [
2128208761
] | [
2094566145,
2126895748,
2185734033,
1979015826,
1972121892,
2122244604,
2046010791,
2160763688,
1608758704,
2043345585,
2130796978,
2134673975,
2151675709,
2090359754,
1496852045,
1534941005,
2065332058,
2000715618,
1968098666,
2100769519,
2024060531,
2128208761,
15512769... | A widely used unsupported underground mining technique is sublevel stoping, in which portions of ore-body within certain size constraints are extracted. In this article, a sequential approach is proposed to solve the sublevel determination problem, which is part of development and infrastructure planning, and the stope... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A planning approach for polymetallic mines using a sublevel stoping technique with pillars and ultimate stope limits |
3,035,794,974 | 2020-06-16 | 48,643,595 | [
2109364787,
2963103847,
2000715618,
2043345585,
2152195021,
2094566145,
2068546981,
2185734033
] | [
2094566145,
2126895748,
1976744965,
2169245194,
1993885071,
2543580944,
2185734033,
1979015826,
4234406933,
2154929945,
2165299997,
2060929952,
1820051232,
1972121892,
2068546981,
2072955302,
2160763688,
2162145193,
1985080107,
2150593711,
1569990960,
2043345585,
21307969... | In mines planning, the long-term production scheduling problem (LTPSP) in open-pit mines is considered as a significant issue. It also specifies the distribution of cash flow during the course of the mine-life. Actually, LTPSP is a large-scale optimisation problem including large data-sets, multiple constraints, and un... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An optimisation approach for uncertainty-based long-term production scheduling in open-pit mines using meta-heuristic algorithms |
2,384,763,423 | 2011-01-01 | 2,764,956,812 | [] | [] | The boom-bucket linkage of excavator was studied.Mathematic models of the boom-bucket linkage were built with coordinate transformation matrix,and the general expression of its trajectory was derived.Further results were given under some special conditions.The comparison between the expression and the practical traject... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An Analysis of Trajectory in Hydraulic Backhoe Excavators |
4,211,264,358 | 2008-11-17 | 4,306,463,075 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | References |
3,099,054,151 | 2020-10-01 | 4,210,187,594 | [] | [] | With the continuous expansion of the scale of colleges and universities, it may be necessary to temporarily add some experiment class while teaching, so the demand of the experiment course arrangement system is increasing. Based on the backtracking method, this paper constructs a basic algorithm for the problem of cour... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Design and Evaluation of Experiment Course Arrangement System Based on Backtracking and Analytic Hierarchy Process |
2,898,381,932 | 2018-10-21 | 48,643,595 | [
1979015826
] | [
2160763688,
2043345585,
1979015826,
1534941005
] | ABSTRACTLarge-scale mining methods are commonplace in the mining industry, and caving has become the preferred underground mining technique. The use of block caving has increased worldwide and is expected to grow because of high production rates, low mining costs, and low waste production. One key engineering considera... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimizing block caving drawpoints over multiple geostatistical models |
2,966,133,833 | 2019-06-20 | 4,220,650,844 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A HYBRID PARTICLE SWARM OPTIMIZATION SOLUTION TO CONSTRAINED LONG-TERM PRODUCTION SCHEDULING AT OPEN PIT MINING |
2,044,583,707 | 2010-11-01 | 4,306,419,447 | [] | [] | In order to solve the problem of that the initial investment of truck dispatching system is vast and how to quantify scientifically to analyze the technical factor of truck dispatching system. A truck real-time dispatching model was built based on two minimization dispatch criterion. The method of Comparing different i... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Forecast of Applied Effect for Truck Real-Time Dispatch System in Open-Pit Mine Based on CSUSS |
4,200,068,635 | 2022-02-01 | 114,739,668 | [] | [
2025878787,
2072834565,
2146879621,
2046033161,
1492655370,
2164768649,
1536615069,
2053920929,
2117897510,
2145493798,
2160763688,
1985080107,
2048769967,
1569990960,
1996109622,
4238889147,
2151675709,
2149450071,
2797333853,
2107305576,
4255230573
] | Underground mining is a highly competitive industry that is often singularly focused on material production as a key performance indicator. However, maximizing material production does not always maximize industry profitability. Equipment utilization in support of underground mining operations is a significant factor t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A dynamic simulation approach to support operational decision-making in underground mining |
2,022,970,105 | 2012-09-01 | 4,210,206,196 | [] | [
2128208761,
1534941005
] | In order to obtain minimum amount of ore wastage and maximum profitability in dimension stone quarries an optimal short-term production planning procedure has been established here according to the market demand. As the base of this procedure geological modelling has been first created and smoothing of ore-body boundar... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Geological modeling and short-term production planning of dimension stone quarries based on market demand |
2,898,662,472 | 2020-03-01 | 173,256,270 | [
2160763688
] | [
2053920929,
1972121892,
2068546981,
2126895748,
2160763688,
2313274380,
1496852045,
1534941005,
2126258480,
1979015826,
2130796978,
2169528473,
2151675709
] | Abstract Given a binary rooted tree in which each edge has an associated value and an associated discount factor, the problem addressed here is to determine which nodes should be visited and in what order so as to maximise the net present value calculated from the values and discount factors of the traversed edges. A p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Scheduling the construction of value and discount weighted trees for maximum net present value |
2,021,878,969 | 2013-12-01 | 103,321,696 | [
2160763688,
2053920929,
2151675709
] | [
2126895748,
2066086285,
1979015826,
2169528473,
2053920929,
2798344481,
1972121892,
2148673189,
2068546981,
2160763688,
2126258480,
2084977713,
2130796978,
2133676848,
2151675709,
1976122053,
1496852045,
1534941005,
2111581650,
2123696861,
2116675171,
2010334716
] | We present models of trucks and shovels in oil sand surface mines. The models are formulated to minimize the number of trucks for a given set of shovels, subject to throughput and ore grade constraints. We quantify and validate the nonlinear relation between a shovel’s idle probability (which determines the shovel’s pr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A linear model for surface mining haul truck allocation incorporating shovel idle probabilities |
3,143,772,144 | 2010-01-01 | 4,306,555,669 | [] | [] | 用 GIS, GPS 和 GPRS,矿石掺一个开的坑矿的一个动态管理系统被设计了并且发展。一个线性程序在一个实际应用程序被建立。系统很擅长自动地起草矿石相配和监视器的一个每日的生产计划并且在实时控制采矿生产的进程。在真实条件下面的实验证明这个系统的表演是稳定的并且能满足矿石掺开的坑矿的生产标准。 | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Dynamic management system of ore blending in an open pit mine based on GIS/GPS/GPRS |
1,998,512,546 | 2009-06-01 | 72,171,858 | [
2024060531,
2020999234
] | [
2020999234,
2024060531
] | Over recent years, new methods have been developed to integrate uncertainty into the optimisation of life-of-mine production planning. One of these methods is based on scheduling with a simulated annealing (SA) algorithm and equally probable realisations of a given mineral deposit. The latter realisations are used to g... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stochastic mine design optimisation based on simulated annealing: pit limits, production schedules, multiple orebody scenarios and sensitivity analysis |
2,116,232,509 | 2008-03-01 | 85,680,945 | [] | [] | Environmental concerns on mining activities started near the end of the 20th century and is still underway. Due to mining activities, the adverse environmental impact has been significant throughout the history of mankind, whereas the minerals produced by mining activities have been providing the basis for human civili... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage |
2,809,849,522 | 2019-03-01 | 2,764,755,457 | [
2166819294,
2068978093
] | [
2004256739,
2055836363,
2068978093,
1974959902,
2157579184,
2154429654,
2069360055,
2130064246,
1924692347,
2099656668,
2166819294,
2032674078
] | The management of overburden is an important task in open pit exploitations. Site topography and morphology as well as geological and geotechnical properties of natural and remoulded materials are the most important factors affecting the disposal phase. Economic and environmental requirements must be followed in order ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Overburden management in open pits: options and limits in large limestone quarries |
2,489,847,069 | 2003-01-01 | 4,306,463,937 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Environmental problems related to mining in the industrial regions of Europe |
2,125,630,344 | 2006-01-01 | 4,210,211,170 | [] | [] | Consumer market has induced companies in a constant process of changes, because it demands more and more quality products at a lower cost. The companies react by launching new products, promoting changes in their organizations, in all the aspects of their management, in order to improve processes and to qualify people.... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | PROGRAMAÇÃO LINEAR: ESTUDO DE CASO COM UTILIZAÇÃO DO SOLVER DA MICROSOFT EXCEL |
2,790,406,666 | 2018-03-12 | 4,210,217,500 | [
1985080107,
1969483356,
1647779468,
2126105956,
2094566145,
2185734033
] | [
1497256448,
2094566145,
2059757952,
2019291268,
2126895748,
2073650054,
2132527237,
1647779468,
2543580944,
2185734033,
2154929945,
2165394332,
2017990047,
2060929952,
2798344481,
2158550687,
1972121892,
2116661285,
2068546981,
1918344999,
2160763688,
3124407081,
21621451... | The incorporation of the uncertainties of geometallurgical variables in mine planning provides new opportunities for decision-makers to analyse, compare and choose among many scenarios to achieve an optimal balance between economic and operational objectives. This research focuses on maximising economic return and mini... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The optimisation of block caving production scheduling with geometallurgical uncertainty – a multi-objective approach |
3,188,534,575 | 2021-07-31 | 4,306,463,937 | [
2053920929
] | [
2585206336,
2053920929,
2798344481,
2039107171,
2114173607,
2078293738,
2035236920,
2088304441
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Surface Mine Development |
3,206,241,951 | 2022-03-01 | 2,765,035,337 | [
2169528473
] | [
2169528473,
2107951442,
2112737587,
2130646078
] | Underground mines have several hazards that could lead to serious consequences if they come into effect. Acquiring, evaluating, and using the real-time data from the atmospheric monitoring system and miner's positional information is crucial in deciding the best course of action.A graphical user interface-based softwar... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Internet of Things–Based Command Center to Improve Emergency Response in Underground Mines |
115,917,715 | 2014-07-24 | null | [] | [] | The copper grade in the Aitik mine in northern Sweden is decreasing, therefore other deposits are investigated. One of these deposits is the satellite deposit discussed in this thesis. The grade of this deposit is higher than in Aitik and could thus be used to increase the copper production at the Aitik mine site. The ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Aitik mill as hub for a satellite mine: Preliminary development plan of a satellite copper deposit |
2,618,430,524 | 2012-12-31 | 4,210,212,355 | [] | [] | Seiring dengan perkembangan zaman, kemajuan dan perkembangan ilmu pengetahuan dan teknologi telah mempengaruhi cara hidup manusia. Perkembangan teknologi informasi memacu suatu cara baru dalam berbagai bidang usaha. Teknologi komputer digunakan untuk membantu keterbatasan manusia dalam memecahkan berbagai masalah yang ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Perancangan Sistem Pengolahan Data Timbang Pabrik Minyak Sawit (CPO Mill) Dengan Bahasa Pemrograman Visual Basic 6.0 Pada PT Hindoli Banyuasin Palembang Sumatera Selatan |
2,140,170,679 | 2010-12-01 | 103,321,696 | [
2010334716,
2130796978
] | [
1972121892,
2148673189,
2107941094,
1984953641,
2070891082,
1534941005,
2152358062,
2163428398,
2130796978,
2024060531,
2042986967,
2001368153,
2010334716,
2001619934
] | This paper deals with the Open-Pit-Mining Operational Planning problem with dynamic truck allocation. The objective is to optimize mineral extraction in the mines by minimizing the number of mining trucks used to meet production goals and quality requirements. According to the literature, this problem is NP-hard, so a ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A hybrid heuristic algorithm for the open-pit-mining operational planning problem |
4,308,694,276 | 2022-11-10 | 4,210,180,259 | [] | [
2053920929,
2094566145,
1918344999,
2160763688,
2103120971,
2140170679,
1969483356,
2151675709
] | Automation has been changing the mining industry for the past two decades. Material handling is a critical task in a mining operation, and truck-shovel handling systems are the primary method for surface mining. Mines have deployed autonomous trucks, and their positive impact on both production and safety has been repo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Autonomous and Operator-Assisted Electric Rope Shovel Performance Study |
3,004,254,095 | 2020-01-01 | 2,764,358,612 | [] | [
2151675709,
1534941005,
636993861
] | Truck and shovel are the most common raw material transportation system used in the cement quarry operations. One of the major challenges associated with the cement quarry operations is the efficient allocation of truck and shovel to the mining faces. In order to minimize the truck and shovel operating cost, subject to... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modeling and Optimization of Truck-Shovel Allocation to Mining Faces in Cement Quarry |
2,479,664,208 | 2016-01-01 | 4,210,229,995 | [] | [] | Vietnam has potential reserves of titanium placers, located mainly along the coast of the Middle spreading across provinces from Thanh Hoa to Ba Ria – Vung Tau. Mining titanium placers deposits has gained considerable profit for localities and the country as a whole, but it has also given rise to significant environmen... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Status of Development Orientations for Mining Titanium Placers in Vietnam |
4,292,230,000 | 2022-08-24 | 4,210,225,672 | [
2118578357,
2160763688,
2131116400
] | [
2086623749,
1835720201,
2076785727,
1496852045,
1601649239,
2012329067,
2052611179,
2165775468,
1968355947,
2003777645,
2024060531,
2101601405,
1986931325,
2032257665,
2019291268,
2146879621,
2126895748,
1647779468,
2024742034,
1979015826,
2035518103,
2169528473,
21289703... | We consider a coal mine producing a catalog of products through multiple pieces of equipment with variable production rates over a multi-period horizon, where each product faces random demand in each period. Each piece of equipment requires Preventative Maintenance (PM) with a given duration. We study a joint PM and pr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Robust optimization for integrating preventative maintenance with coal production under demand uncertainty |
2,965,095,272 | 2007-03-01 | 110,258,470 | [] | [] | In-pit crusher location selection has had an important role recently, since increasing diesel prices. One way of reducing the haulage costs is to shorten the truck haulage distance by bringing the truck dump point into the pit. This study covers the work done on the optimum crusher location definition for a company tha... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Selection of the optimum in-pit crusher location for an aggregate producer |
3,013,304,685 | 2020-03-27 | 141,755,406 | [
2034960640
] | [
2034960640,
2008157089,
2007367842,
2165702945,
2039906750,
2034994370,
2020407132,
1976759885,
2136050606,
2168682319,
2556968239,
2130387153,
2082622325,
2170888726,
2169528473,
2165299260,
2151675709,
2146377630
] | A variety of factors are involved in inter-city transportation route selection in the areas of complex terrain. With the help of Geographic Information System (GIS), three quantitative methods were employed to determine the transport routes between 44 cities in Northern Yunnan (China), an area with alpine valleys, Kars... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Selecting Inter-city Transportation Routes in Complex Terrains Using Quantitative Methods – A Case Study from Northern Yunnan, China |
2,752,484,224 | 2017-01-01 | null | [] | [
2059757952,
3123821384,
2126258480,
2077791698,
1971394868,
2165201397,
1602773783,
1995945562
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Cut-off grade optimization of open pit mines with multiple processing streams |
2,599,872,616 | 2017-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Value creation in a mine operating with open stoping mining methods |
2,565,726,224 | 2016-10-01 | 21,299,057 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Design and implementation of electric drives and control systems for mining excavators |
4,312,701,447 | 2022-01-01 | 2,764,696,622 | [] | [
1981934656
] | Mahalona South West is one of the PT Vale Indonesia Tbk Contract of Work areas, which is located between Sorowako Block and Petea Block. The area includes 14 compartments, namely Compartment 9, 10, 11, 12, 77, and 99 (West Block) and Compartment 1, 2, 3, 4, 5, 6, 7, and 8 (South Block). Mining activities are planned to... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mine haul road planning in South West Mahalona area Pt vale Indonesia Tbk |
2,498,351,313 | 2005-08-18 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Rocks and minerals |
4,308,588,130 | 2022-11-08 | 48,643,595 | [
1985080107,
1551276924,
2060929952,
2000715618,
2043345585,
1979015826,
1534941005,
2094566145
] | [
2059757952,
2094566145,
2126895748,
2169245194,
4236127247,
2185734033,
1979015826,
1995450389,
2154929945,
2165299997,
2149230623,
2060929952,
1972121892,
2068546981,
1918344999,
2160763688,
2046010791,
1985080107,
2081278763,
2126258480,
2043345585,
1569990960,
21093647... | This research presents a new Simulated Annealing based stochastic optimisation algorithm to integrate geological uncertainty into the optimization process through multiple equiprobable simulated realisations of an orebody while considering stockpiling options and other relevant constraints. The stockpiling option is in... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A simulated annealing based stochastic long-term production scheduling of open-pit mines with stockpiling under grade uncertainty |
2,754,196,164 | 2011-01-01 | null | [] | [] | Mining is generally held to be a risky business. An understanding of the risks that impact on mining operations at all levels of risk including worldwide financial and commodity cycles, country risk, project risk and operational risks, all need to be considered and understood by mining operations irrespective of their ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Strategic and tactical risk in mining |
2,594,183,853 | 2017-07-01 | 2,764,358,612 | [] | [] | Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presente... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Development of a goal programming model for optimization of truck allocation in open pit mines |
2,160,763,688 | 2010-06-01 | 140,455,145 | [
2126258480,
1496852045,
2053920929,
1972121892,
1979015826,
2130796978,
1534941005,
2169528473,
2151675709,
2068546981,
2126895748
] | [
2126895748,
2313274380,
1979015826,
2169528473,
2103002522,
2053920929,
2798344481,
1972121892,
2068546981,
2126258480,
2043345585,
2130796978,
1988328380,
2151675709,
2090359754,
1496852045,
1534941005,
2032121576,
3217061993,
2165775468,
2142183404,
2049606892,
16390326... | Applications of operations research to mine planning date back to the 1960s. Since that time, optimization and simulation, in particular, have been applied to both surface and underground mine planning problems, including mine design, long- and short-term production scheduling, equipment selection, and dispatching, int... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Review of Operations Research in Mine Planning |
2,913,548,488 | 2019-02-12 | 4,210,217,500 | [
1537810918,
2257979135,
1918344999,
2145339207,
2119717200,
2094566145,
2185734033,
2919115771
] | [
2100495367,
2000425991,
2160815625,
2126316555,
2157803532,
2164653071,
2061191702,
2165698076,
65738273,
2099741732,
2168359464,
2136922672,
2084977713,
2156909104,
2060108852,
2051224630,
3138949179,
2020999234,
2056956492,
1496852045,
2169417293,
2157164625,
1601649239... | As more and more data about mining complex operations are collected and stored, it becomes increasingly important for computer systems to help human operators make better, more informed decisions. This can be done indirectly, through improved visualization or prediction, or directly by suggesting decisions that respond... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Responding to new information in a mining complex: fast mechanisms using machine learning |
2,095,847,989 | 2015-04-01 | 17,930,613 | [
1551276924,
2100769519,
1496852045,
2065332058
] | [
2126895748,
1979015826,
2103002522,
2149230623,
1972121892,
2068546981,
2611147814,
2046010791,
2160763688,
2163428398,
2043345585,
2130796978,
1551276924,
1496852045,
1534941005,
2065332058,
2003759470,
2100769519,
2128208761,
1992710140,
2086867325
] | although some of the prevalence of openpit production scheduling software can be explained by the predominance of openpit mining throughout the world, other factors have led to a lag in corresponding underground software. We explain mathematically why underground production scheduling is more difficult than its openpit... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Is openpit production scheduling “easier” than its underground counterpart? |
2,886,910,207 | 2018-01-01 | 4,210,228,333 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Comparative assessment of environmental impact of dump trucks and diesel trolley cars in open pit mining |
2,053,340,769 | 2011-10-01 | 196,821,226 | [
4230588984,
2111398557
] | [
4301347335,
2568283272,
2178011284,
2406470551,
2313563931,
2069069851,
2111398557,
2912565176,
4230588984,
1572480955,
1995565517,
2099867994,
2120688485,
4211007335,
4238919913,
2024060531,
1963649399,
2066843515,
1977914365
] | Problems about the uncertainty in raw material compositions are a critical issue for the blending problems. It is feared that uncertainty in raw material compositions would often cause percent values of the actual blend to go out of specification limits. In this paper, the aleatory and epistemic uncertainties have been... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Can the uncertainty in brass casting blending problem be managed? A probability/possibility transformation approach |
2,746,020,585 | 2017-08-24 | null | [
1580809199,
2053920929,
2024140722,
1534941005,
2001933112
] | [
2019291268,
2060924166,
2406470551,
2116859162,
1482867610,
2053920929,
2798344481,
1990485541,
2160763688,
3124407081,
2083259944,
1569990960,
2024140722,
1963617203,
2130796978,
2001933112,
4230588984,
2912565176,
2156577211,
2076309564,
2151675709,
2059536960,
25852063... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization Modeling and Analysis of Truck Allocation System in Surface Mining Operations |
2,291,456,680 | 2015-01-01 | 2,764,472,783 | [] | [] | The open pit Gračanica - Gacko has very complex conditions of watering with occurrences of significant inflow of water as the result of short-term precipitation of high-intensity. This paper presents a review of the influential parameters on size of watering and review a defense system of the open pit from water. | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Defence system from water of the open pit Gracanica - Gacko |
2,935,952,293 | 2019-03-01 | 4,220,650,861 | [] | [] | A PROPOSAL FOR A TRAINING COMPLEMENT FOR THE MASTER’S DEGREE IN NAVAL AND OCEAN ENGINEERING WITH CONTENTS OF INDUSTRY 4.0 | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A PROPOSAL FOR A TRAINING COMPLEMENT FOR THE MASTER’S DEGREE IN NAVAL AND OCEAN ENGINEERING WITH CONTENTS OF INDUSTRY 4.0 |
3,118,572,931 | 2021-01-03 | 26,994,821 | [] | [
2094566145,
1979015826,
2149230623,
2007873570,
1972121892,
2068546981,
2046010791,
2160763688,
1985080107,
2043345585,
2130796978,
2140170679,
2151675709,
1496852045,
1534941005,
2065332058,
1969483356,
2000715618,
3217061993,
2100769519,
2024060531,
2128208761,
15512769... | Short-term open pit planners have to deal with the task of designing a feasible production schedule. This schedule must fulfill processing, mining and operational constraints and, at the same time, maximize the profit or total metal produced. It also must comply with the long-term production schedule and must incorpora... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A mathematical model for the scheduling and definition of mining cuts in short-term mine planning |
959,835,747 | 2012-01-01 | 4,306,523,228 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of the CAWI method for the holistic support of innovation transfer to business practice |
2,374,787,858 | 2003-01-01 | 158,389,693 | [] | [] | When some frequently used exploration decision methods,for example the decision_tree method,are applied to exploration decision_making work,the total costs and profits of the whole exploration process aught to be considered,no matter which stage the exploration is.In that way,the exploration decision_making works are n... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Discussion about exploration decision-making theory and methods for oil and gas trap |
2,087,171,131 | 2010-03-01 | 72,171,858 | [] | [] | AbstractCliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia, ∼50 km north of the town of Southern Cross. Ore is trucked from three geographically isolated sources to the crusher at Koolyanobbing, where it is blended before and during crushing. Lump and fine pr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulation modelling of grade variability for iron ore mining, crushing, stockpiling and ship loading operations |
2,883,558,622 | 2018-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Incorporation of the socio-cultural dimension into strategic long-term planning of mineral assets in South Africa |
2,895,330,583 | 2018-09-24 | 4,210,202,435 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | EFFICIENCY INCREASE POTENTIALITIES OF EXCAVATOR-MOTOR CAR COMPLEXES IN OPEN PIT MINING |
4,214,537,038 | 2022-02-25 | 4,306,463,855 | [] | [] | A dispatching system implemented on a micro-computer has been developed in the framework of a university-industry research and development project. The dispatching system is semi-automated with an operator manually entering transactions through a digital tablet. The dispatching system is suitable for truck/shovel opera... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis of truck dispatching with dynamic heuristic procedures |
2,914,305,564 | 2019-02-07 | 100,482,762 | [
2118578357,
4251616545
] | [
1586409345,
2019291268,
2054989445,
1647779468,
2502254989,
1988520084,
2026645785,
1988622494,
2095383966,
2031279008,
4251616545,
2059792929,
2021472931,
2131512356,
2116661285,
1995834279,
2111563176,
3124407081,
1995285162,
1990275757,
2137971377,
2118578357,
21565772... | A novel approach to robust optimization of coal blending operations is proposed. While many rigorous mathematical approaches have been developed for this problem in the past, most neglect the uncertainty associated with both the inherent coal quality attributes as well as the sampling and measurement protocols used to ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization of coal blending operations under uncertainty – robust optimization approach |
2,276,293,964 | 2015-01-01 | 4,210,186,097 | [] | [] | As explained in Chap. 3, there are two fundamental forces that form the basis of evolutionary systems: variation and selection. In this chapter we discuss the EA components behind the second one. Having discussed some typical population management models, and selection operators, we then go on to explicitly look at som... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Fitness, Selection, and Population Management |
4,293,228,067 | 2022-02-22 | 2,764,415,137 | [
2160763688,
2053920929,
2151675709
] | [
2034960640,
2094566145,
2126895748,
2107974152,
2020320008,
2026911753,
2097048331,
2119338125,
1979015826,
2090972948,
2169528473,
2116859162,
1521183774,
2011245215,
2094275102,
2053920929,
2123709218,
2798344481,
1972121892,
4251616545,
2072955302,
2068546981,
21607636... | The main cause of high-operating costs in open-pit mines is the costs of transportation. Therefore, reducing these costs could have a huge impact on overall mining efficiency and increasing profit. Meanwhile, the high cost of mining equipment, such as shovels and trucks, indicates the necessity of meticulous decision-m... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A G/M/C//M queueing model for revenue management of shovel-truck systems in an open-pit mine considering carbon emission, a case study |
2,111,423,665 | 2011-08-01 | 67,425,620 | [
3217061993
] | [
3217061993
] | A dynamic sequencing method has been developed that can simultaneously optimize the final pit and the production schedule of an open-pit coal mine. The method first establishes a geological seam model of a bedded coal deposit which estimates the relevant attributes of coal seams at the center of each block on the X-Y p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simultaneous Optimization of Final Pit and Production Schedule in Open-Pit Coal Mines |
2,798,804,844 | 2018-05-01 | 140,556,538 | [
1969483356,
2000715618,
1972121892,
1595159159,
2094566145,
2068546981,
2185734033
] | [
2094566145,
2126895748,
2543580944,
2185734033,
1979015826,
2154929945,
2149230623,
2060929952,
1972121892,
2068546981,
2046010791,
2160763688,
2162145193,
1985080107,
2150593711,
1569990960,
2043345585,
2130796978,
2140170679,
2020999234,
1496852045,
1534941005,
21373405... | Production scheduling of open pit mines seeks to define such a temporal flow of ore and waste materials from a mine that maximizes a project’s Net Present value (NPV), while satisfying different physical and operational constraints. To achieve this objective, different mathematical formulations have been proposed in th... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Differential Evolution based approach for the production scheduling of open pit mines with or without the condition of grade uncertainty |
2,303,555,173 | 2002-01-01 | 2,764,600,758 | [
2171646358,
1980534953,
2144846366,
2333311386
] | [
1980534953,
2333311386,
2171646358,
2144846366
] | Given the uncertainty in grade at a mine location, a financially risk-averse decision-maker may prefer to incorporate this uncertainty into the ore selection process. A FORTRAN program risksel is presented to calculate local risk-adjusted optimal ore selections using a negative exponential utility function and three do... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | |
4,281,551,778 | 2022-01-01 | 2,765,054,683 | [] | [
2165172960,
2139921601,
2901544834,
2048644480,
2064367138,
1992985800,
2072024713,
2037502361,
2054780633,
2047459256,
2119654329,
2062321210,
2332797918
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Towards a Sustainable Future with Materials |
3,009,790,937 | 2020-06-01 | 194,185,345 | [
2126895748,
2100769519,
2000715618,
2160763688,
2094566145,
2145479420,
2128208761,
2185734033
] | [
2094566145,
1970848641,
2126895748,
2105002757,
1996707465,
2095216523,
1966554507,
1993885071,
2543580944,
2185734033,
2072963474,
1979015826,
2170480532,
2102612248,
2169528473,
2154929945,
2060929952,
2053920929,
1988729251,
1972121892,
2068546981,
2103720101,
19183449... | An open pit mining operation is a complex system that constitutes several components or processes. An optimal production sequence that defines timing of extraction and a dynamic cut-off grade policy that defines the supply of materials from sources to destinations within the system are crucial to the success of an oper... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simultaneous stochastic optimization of production sequence and dynamic cut-off grades in an open pit mining operation |
374,524,804 | 2004-01-01 | null | [] | [] | The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the 'Shot to Shovel' project. This project has involved the implementation of a drill and blast (D&B) information management system to capture current and... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | 'Shot to shovel' - understanding the impact of muck pile conditions and operator proficiency on instataneous shovel productivity |
2,907,973,306 | 2017-09-30 | 4,210,178,846 | [] | [] | Abstrak.Perancangan Alat Cetak Pembuat Kemasan Thermoplastic Bagi IKM Dengan Metode Vacuum Forming.Studi ini merupakan studi untuk menemukan metode yang tepat untuk digunakan pada perancangan alat pembuat kemasan. Metode studi literatur digunakan untuk mengumpulkan seluruh informasi terkait metode, sistim dan teknis mo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | STUDI PERANCANGAN ALAT CETAK PEMBUAT KEMASAN THERMOPLASTIC BAGI IKM DENGAN METODE VACUUM FORMING |
3,158,268,677 | 2003-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Transportation Engineering an Introduction, 3rd ed |
3,040,853,593 | 2020-01-01 | null | [] | [
2094566145,
2126895748,
2313274380,
2185734033,
2068546981,
2043345585,
2130796978,
2118578357,
2506768821,
4230588984,
2090359754,
1496852045,
1534941005,
2099867994,
2065332058,
2045523936,
2000715618,
1968098666,
2100769519,
2024060531,
2128208761
] | As mineral resources exhausted in near-surface deposits of the earth crust, mining operations focus on going more in-depth. Increasing environmental concerns make underground mining more preferable because it is less harmful than surface mining. On the other hand, high operating costs of underground mining bring signif... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Underground mine planning for stope-based methods |
187,664,148 | 2013-01-01 | 2,739,038,340 | [] | [] | Some distinctive essential aspects, characterizing most mining projects - the high level of investment effort, the major impact upon turning to good account of a significant part of the national wealth (the useful mineral deposits), the extremely limited character of the state's available resources (the only one to fin... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | POSSIBILITIES FOR USING THE EFFECTS METHOD IN MINING PROJECTS ASSESSMENT |
2,988,839,108 | 2019-11-01 | 2,764,415,137 | [
2000715618,
2094566145
] | [
2094566145,
2126895748,
2169245194,
2152999180,
2185734033,
1979015826,
2024742034,
2154929945,
1972121892,
2068546981,
2067462952,
2160763688,
2043345585,
2130796978,
2007363252,
2118578357,
2132202037,
2140170679,
2095293504,
1534941005,
1969483356,
1659842140,
20455239... | Open-Pit Production Scheduling (OPPS) is an NP-hard problem. In this article, Genetic Algorithm (GA) is used to encode the solutions of OPPS problem. The orebody is characterized as a three-dimensional (3D) array of blocks. Therefore, in this study, a 3D GA array is employed in the solution space of the OPPS problem to... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Production scheduling of open-pit mines using genetic algorithm: a case study |
2,035,264,384 | 2013-06-01 | 72,171,858 | [] | [
2060929952,
2094566145,
2020999234,
2126895748,
1537810918,
2024060531,
2128208761
] | Mine planning is the foundation of value for a mining company. Good mine planning requires solid understanding of the ore body, rigorous standards and processes, robust and useful information technology and skilled people. Life-of-Mine planning is the key to identifying strategic direction for any mine and short range ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mine planning best practice at Kinross Gold |
2,323,353,092 | 2011-01-01 | 2,764,757,185 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Novel Dynamic Model and Simulation of Gas Sweetening in Tray Beds |
2,800,437,691 | 2019-05-01 | 2,764,755,457 | [
2140170679,
1918344999,
2185734033
] | [
2094566145,
2126895748,
2543580944,
2185734033,
1979015826,
1972121892,
2068546981,
1918344999,
2160763688,
2046010791,
2162145193,
1985080107,
2150593711,
1569990960,
2043345585,
2130796978,
2140170679,
2151675709,
2020999234,
1496852045,
1534941005,
2065332058,
19694833... | Blending contributes to create an opportunity to achieve the target feed material and helps optimize the run of mine (ROM) material. In addition, it allows mixing different materials and achieving a wide range of quality. Then, multiple destinations can be considered for ROM. The present study seeks to develop a Mixed ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Reliability analysis of production schedule in multi-element deposits under grade-tonnage uncertainty with multi-destinations for the run of mine material |
2,064,025,829 | 2010-05-01 | 206,834,481 | [] | [] | Currently almost 65 % of the coal in Australia is being produced by opencast mining methods. Mining equipments such as draglines, dredgers or bucket wheel excavators, trucks and shovels, and dozers are the main equipments employed for overburden removal and coal extraction. The choice of equipment for a particular mine... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A review on existing opencast coal mining methods within Australia |
4,384,297,472 | 2023-07-03 | 4,210,217,500 | [
2140170679,
2053920929,
1918344999,
2151675709
] | [
2094566145,
2185734033,
1979015826,
2169528473,
2010334716,
2060929952,
2053920929,
2798344481,
2088756387,
1972121892,
2122244604,
1918344999,
2149860264,
2074219305,
2160763688,
1985080107,
2007227052,
2152358062,
1569990960,
2506753585,
2130796978,
2124629174,
21401706... | ABSTRACTABSTRACTFleet management systems in open pit mines make two important semi-dynamic and dynamic decisions to maximize utilization of available equipment: the decision of allocation and the decision of dispatching the trucks to the shovels. In this paper, we propose a bi-objective mathematical model that incorpor... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Sustainable open pit fleet management system: integrating economic and environmental objectives into truck allocation |
2,612,930,051 | 2004-09-27 | 4,306,402,512 | [] | [] | Hazardous material (hazmat) transportation trucks represent far more danger than any other truck in the event of an accident. In addition to normal consequences, the potentially harmful properties of the substance being carried represents a major risk. It is therefore important to know when such vehicles travel near ke... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Technological risks management: automatic detection and identification of hazardous material transportation trucks |
1,421,743,499 | 2009-01-01 | 4,306,533,244 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulation of at face slurrying method and continuous miner truck system in an open pit mine |
1,141,821,749 | 2011-12-16 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An Integrated Optimization Tool in Applications of Mining using A Discrete Rate Stochastic Model |
2,008,045,027 | 2014-05-01 | 86,572,313 | [] | [] | Sorption of rhenium(VII) and vanadium(V) from mineralized sulfate-chloride solutions by fibrous ionites of the FIBAN series is investigated. Equilibrium, kinetic, and dynamic characteristics of sorption of Re and V by the FIBAN ionite of the AK-22 brand, which contains functional groups =NH2, -NH2, -COOH, and ≡N, are f... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Sorption of rhenium and vanadium from mineralized solutions by fibrous ionites |
3,118,744,147 | 2021-01-07 | 4,210,195,883 | [] | [
2053920929,
2160763688,
194786220,
1534941005,
2041280856,
2151675709
] | The article presents the results of the research on the equipment complexes parameters impact assessment with electric and hydraulic excavators and dump trucks on deposits development intensity. The classification of deposits according to the relative difficulty of development is introduced. For the open pits of each o... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research of the influence of the excavating and automotive equipment complexes parameters on the speed of faces advance |
2,929,831,977 | 2004-01-01 | 4,210,173,607 | [] | [] | Frente al proyecto del Ejecutivo enviado al Congreso, consistente en el establecimiento de una regalia a la explotacion minera, los autores sostienen que seria un error centrar el debate sobre su constitucionalidad en las caracteristicas del dominio que sobre la propiedad minera tendria el Estado o en la naturaleza jur... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Límites constitucionales a la intervención del Estado a través del establecimiento de una regalía minera |
2,963,393,645 | 2019-05-22 | 4,306,463,075 | [] | [
1497256448,
2341171179,
1551276924,
3023540311
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An operational data based framework for longwall shearer performance measurement |
1,010,611,303 | 2010-01-01 | 12,999,175 | [] | [
1584441531
] | The stability analysis of a processing machine, including a dragline excavator, involves determining its centre of mass analytically or empirically. Therefore, the centre of mass of Esz 6/45 walking excavator, which was to be modernised, needed to be located. Due to the lack of any technical documentation, it was neces... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Determining Centre of Mass of Walking Dragline Excavation System |
1,977,629,220 | 2010-07-13 | 126,499,095 | [
2022997081
] | [
4295995202,
1998182852,
2015309158,
1965424269,
2075325076,
3022339544,
2022997081,
2104514715,
1988491420,
1989726365,
4298413470,
2119642328
] | Kiruna, a small town in the north of Sweden, is facing a major change because an expanding mining industry is threatening the town. The iron ore body runs under the central parts of the town and continued mining will cause that area to collapse. Therefore, the municipality of Kiruna (Kiruna kommun) has, under the influ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Ideology, environment and forced relocation: Kiruna - a town on the move |
2,051,135,426 | 2008-12-01 | 142,630,227 | [] | [] | Abstract On the basis of analyzing the strong and weak points of two ways in the economic evaluation at the preliminary trap prospecting stage before drilling, that is, the integrated exploration and development evaluation and the traditional evaluation by phase, this article establishes a phase evaluation model for re... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An improved clipping evaluation at preliminary trap prospecting stage |
2,158,815,077 | 2011-05-01 | 4,306,417,844 | [] | [] | Mining is the basic industry of national economy. Mining development are closely linked with the national economy, and the sustainability of mining development in the entire national economy directly affect the sustainability of the mining industry. Sustainable development of the mining model has become an extremely im... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Discussion in the mining industry of ecology and sustainable development |
4,323,843,545 | 2023-05-01 | 64,511,102 | [
2140170679,
2053920929
] | [
2094566145,
2074415620,
1976898311,
2092838154,
2066086285,
1965856911,
2185734033,
1979015826,
2096305430,
2000525593,
2169528473,
2150071071,
2040297119,
2053920929,
2798344481,
4251616545,
1972121892,
2116661285,
2035098657,
2055240231,
2160763688,
1918344999,
20850021... | The introduction of autonomous mine trucks can improve the efficiency, productivity, and safety of open-pit mines, but may require more reasonable dynamic truck dispatching system to guide routes and schedules than manual driven mine trucks. In practical operations, for security consideration, only one autonomous mine ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A dynamic dispatching problem for autonomous mine trucks in open-pit mines considering endogenous congestion |
2,012,965,407 | 2012-12-01 | 60,779,006 | [
2151675709
] | [
2025878787,
2076958472,
2099529102,
2334782222,
2096305430,
2049176600,
4253543067,
2036422814,
2053920929,
2145493798,
2122203560,
2048769967,
2151675709,
2076785727,
2094039233,
2067050450,
2151408086,
1737826015,
4252302949,
2024060531,
2124289529,
2147507583
] | The paper presents an implemented architecture of an intelligent simulation-based real-time control (SRTC) system for industrial applications. The proposed SRTC uses a trajectory tracking strategy inspired from the model-based predictive control approach. Dynamic control law based on the closed-loop feedback correction... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Specification of an intelligent simulation-based real time control architecture: Application to truck control system |
2,059,883,250 | 2014-05-01 | 206,834,481 | [
1985080107,
1484040084,
2060929952,
2100769519,
1496852045,
2128208761
] | [
2060929952,
2094566145,
2020999234,
2126895748,
2068546981,
1537810918,
2160763688,
1985080107,
1496852045,
1534941005,
2100769519,
2043345585,
1979015826,
2024060531,
1484040084,
2130796978,
2128208761,
1551276924
] | Existing methods of pushback (phase) design are reviewed in the context of “gap” problems, a term used to describe inconsistent sizes between successive pushbacks. Such gap problems lead to suboptimal open pit mining designs in terms of maximizing net present value. Methods such as the Lerchs-Grossman algorithm, networ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimized open pit mine design, pushbacks and the gap problem—a review |
2,515,521,774 | 2016-01-01 | 2,764,831,130 | [
2060852319
] | [
1969397762,
1963879048,
3123282572,
1981557392,
2090972948,
2083127319,
2113991966,
2164946207,
2053920929,
1972121892,
1965278510,
2017190577,
2051835829,
2151675709,
2114803781,
2130983366,
2097441736,
2055013323,
2057897933,
2130231032,
2065682001,
2065198673,
21377453... | Mineral commodity prices have decreased swiftly since 2012. For example, gold price, which was above $1800 per ounce, is currently about $1250 per ounce. Price slumps were even more severe in the base metals. Furthermore, the resource degradation and complex geologic conditions give rise to operation costs. As a result... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Reliability effect on energy consumption and greenhouse gas emissions of mining hauling fleet towards sustainable mining |
1,870,332,767 | 2015-07-01 | 2,736,686,566 | [] | [
1984853762
] | Abstract This paper describes the research on adaptronic systems made by the author and offers to use biosensors that can be later inserted into the adaptronic systems. Adaptronic systems are based, on the one hand, on the adaptronic approach when the system is designed not to always meet the worst condition, but to ch... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research in Adaptronic Automatic Control System and Biosensor System Modelling |
2,767,100,316 | 2016-01-01 | 4,210,195,130 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Design optimum open pit limits using hybrid computing systems |
2,011,753,239 | 2012-03-01 | 2,764,454,127 | [
2140170679,
2046010791,
3217061993,
1972121892,
2130796978,
1534941005,
2068546981,
2126895748
] | [
1497256448,
2126895748,
2169528473,
2098432798,
1972121892,
2068546981,
2046010791,
2160763688,
2136050606,
2043345585,
2130796978,
2039078453,
2140170679,
2912565176,
2151675709,
2011039300,
1551276924,
2090359754,
1534941005,
1496852045,
2020407132,
2123696861,
21577936... | In this paper, an interactive planning and scheduling framework are proposed for optimising operations from pits to crushers in ore mining industry. Series of theoretical and practical operations research techniques are investigated to improve the overall efficiency of mining systems due to the facts that mining manage... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An Interactive Planning and Scheduling Framework for Optimising Pits-to-Crushers Operations |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.