paper_id int64 391 4.39B | publication_date stringlengths 10 10 | journal_id int64 61.7k 4.39B ⌀ | final_level_0_links listlengths 0 1.06k | final_level_1_links listlengths 0 9.76k | abstract stringlengths 1 58k ⌀ | micro_cluster_id int32 1 4.52k | short_label stringlengths 3 47 | long_label stringlengths 23 102 | keywords stringlengths 84 335 | new_title stringlengths 0 18.2k |
|---|---|---|---|---|---|---|---|---|---|---|
3,200,039,252 | 2021-01-01 | 4,210,186,093 | [] | [
2160763688,
2053920929,
1534941005,
2151675709
] | Assessment of the shovel-truck system (STS) operation quality is based on the well-known method of non-expert assessment of the quality of mining machines. The methodology is based on the fundamental principles of qualimetry and allows making the assessment of functionally homogeneous machines of different sizes, types... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Assessment of the shovel-truck system operation quality at open-pit mines in Kuzbass |
4,283,760,815 | 2022-06-30 | 10,134,376 | [] | [
1969397762,
1970740758,
2092553756,
2066674205,
1971354656,
2128264241,
2031817269,
1977607223,
2123610169,
3138949179,
2059536960,
1999691329,
2585206336,
2071734341,
1989785158,
4292158025,
1496852045,
3011865677,
2065198673,
1748537427,
2226396244,
2150600289,
20709899... | Mining of the extensive, steeply dipping ore deposit takes several decades. An open-pit mining method is more often used in the early years of such a mining enterprise (ME). The management of the enterprise is faced with the problem of changing the mining method as the depth of the quarry increases. Untimely solution o... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Selection of Open-Pit Mining and Technical System’s Sustainable Development Strategies Based on MCDM |
2,997,167,817 | 2019-11-01 | 2,505,686,813 | [
1985080107
] | [
2032257665,
4245152641,
2094566145,
4252999557,
2185734033,
2038345112,
2060929952,
1972121892,
2148673189,
1985080107,
2140170679,
2151675709,
2157406401,
2020999234,
2042986967,
1969483356,
2000715618,
2107941094,
4211007335,
1968098666,
2127823468,
2024060531,
20421028... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A value adding approach to hard-rock underground mining operations: Balancing orebody orientation and mining direction through meta-heuristic optimization |
2,153,766,510 | 2007-05-01 | 4,306,418,062 | [] | [] | In vehicle surveillance system, it's important to realize digital map because it can easier to know vehicle's dynamic information. In this paper, application of MapX component in vehicle surveillance system is discussed. On the basis of analysis of composition and work principle of vehicle surveillance systems, using V... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Research and Design of Vehicle Surveillance System Base on MapX |
2,772,590,070 | 2018-06-01 | 194,185,345 | [
2615190415
] | [
2615190415
] | Mining is a capital intensive business that requires a large amount of upfront capital to cover development and infrastructure costs. Major infrastructure and development required to access the orebody must last for the life of mine. Net present value is commonly used to determine the economic viability of a project an... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A comparison of three production rate estimation methods on South African platinum mines |
2,731,298,320 | 2017-07-05 | 2,764,706,523 | [
2100769519,
2160763688,
2046010791,
1972121892,
2130796978,
1534941005,
2065332058,
2068546981,
2126895748
] | [
2094566145,
2126895748,
1979015826,
2125827607,
2169528473,
2118371226,
2165299997,
2033916191,
2150071071,
2053920929,
1972121892,
2068546981,
2046010791,
2160763688,
2163428398,
2126258480,
2043345585,
2130796978,
2031545009,
2149884725,
2140170679,
2088304441,
21516757... | This paper investigates the integration of planning and scheduling theory for open-pit ore mining industry under comprehensive mining constraints and attributes. Consequently, mine design planning, mine block sequencing and mine production scheduling problems are modelled, solved, interacted and integrated in a whole s... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integration of mathematical models for ore mining industry |
3,088,651,430 | 2020-07-01 | 4,306,498,680 | [] | [
4300402905,
2171277043
] | Under the condition of satisfying the demand of smelter for ore quality, how to optimize the ore benefit in a certain period is a concerned problem. For a batch of ore, a multi constraint integrated greedy optimization algorithm (MICG)is proposed. According to the ore quality requirements, considering the content of ea... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Ore Grouping Multi-Constraint Integration Benefit Greedy Optimization Method |
2,236,240,067 | 2016-03-01 | 194,185,345 | [] | [
4248651010,
2116388354,
2615190415,
1519256978,
2117897510,
1966910378,
2126258480,
2038532793,
4365787967,
3123821384,
2025753296,
2077791698,
4210300258,
2090637028,
2126311658,
2034707435,
4231057775,
2087076079,
1588163064
] | In the extraction of metal from a mine, the intermediate ore between the economic and the breakeven cutoff grade is usually stockpiled for future processing once the mine is depleted. This research establishes a theoretical two-stage economic model to derive the value of this stockpile and how it affects optimal mining... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mining rate optimization considering the stockpiling: A theoretical economics and real option model |
2,206,517,957 | 2009-01-01 | 4,210,172,589 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Commodities Prices Modeling Using Gaussian Poisson-Exponential Stochastic Processes, a Practical Implementation in the Case of Copper. Presented at ECMS 2009 |
2,292,962,144 | 2018-01-01 | 4,306,463,937 | [
1918344999,
2185734033
] | [
2060929952,
2094566145,
2020999234,
2000715618,
1918344999,
1551276924,
2162145193,
1534941005,
2150593711,
1569990960,
2185734033,
2543580944,
2024060531,
2130796978,
2043345585,
1595159159,
2128208761,
1969483356
] | A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimize strategic and tactical plans. The objective is to find the near optimal decisions for a mineral supply chain in the context with uncertainties in both ore supply and the commodity market (price and demand). The endoge... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimising a Mineral Supply Chain Under Uncertainty with Long-Term Sales Contracts |
2,940,693,469 | 2019-04-23 | 4,210,169,854 | [] | [] | In block 186 of Boliden Tara Mines, Ireland, two ore lenses are separated by waste and low grade material. Long-hole open stoping is seen as an alternative method to room-and-pillar mining that permits the extraction of two waste-separated ore lenses simultaneously. Both methods are well-established at the mine. Within... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Economic Mining Method Evaluation for Separated Ore Lenses in Block 186 at Boliden Tara Mines, Ireland, Using Deswik Software |
1,808,182,721 | 2011-08-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Annual mine planning and execution buffering-a safety imperative |
4,206,448,469 | 2022-01-01 | 4,306,463,937 | [
1551276924,
2140170679
] | [
2094566145,
2126895748,
2138522501,
2073650054,
2034285706,
2084890123,
2024436619,
2100411277,
2170482959,
4233209872,
2169409681,
2173251738,
2010334716,
2060929952,
2000472224,
1972121892,
2090249381,
2046010791,
2135494568,
2160763688,
1525646248,
1985080107,
19921476... | The transition toward more environmentally friendly energy production and e-mobility will increase the global demand for metals and minerals. The ocean floor might contribute to meet this demand. This would require that the mineral resources are managed well, from both governmental and industry perspectives. Strategic ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Conceptual 3D Modeling and Direct Block Scheduling of a Massive Seafloor Sulfide Occurrence |
2,238,904,773 | 2015-01-01 | 4,210,215,724 | [
1551276924,
2169245194,
1972121892,
1534941005
] | [
1972121892,
2126895748,
3217061993,
2169245194,
1534941005,
2152195021,
2043345585,
2158814833,
2024060531,
1979015826,
2128208761,
1551276924,
2165299997
] | This paper proposes a procedure for applying Particle swam algorithm (PSO) to long term production scheduling problem of the open pit mines, which is a large combinatorial optimization problem involving large datasets and multiple hard and soft constraint. Constraint programming technique have been used to produce the ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of Particle Swarm Optimization to the Open Pit Mine Scheduling Problem |
2,587,070,474 | 2016-12-31 | 4,210,191,933 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Effects of the Experience of Korean Wave Contents on Country Image, Contents Satisfaction and Loyalty: A Focus on the Potential Consumer of the N ew Korean Wave in Europe |
2,029,399,827 | 2009-06-01 | 72,171,858 | [] | [] | AbstractCliffs Natural Resources Pty Ltd operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three locations, separated by many kilometres. The ore is stockpiled at these locations, according to an in-house ore classification system (based on grade and source), and then trucked t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Predicting lump and fines finished product grades and lump percentage from head grade |
2,942,119,253 | 2019-04-22 | 4,210,217,500 | [
2160763688
] | [
2126895748,
2313274380,
1979015826,
1484040084,
2169528473,
2060929952,
2053920929,
1972121892,
2068546981,
2160763688,
1985080107,
2126258480,
2130796978,
2151675709,
2090359754,
1496852045,
1534941005,
2100769519,
2128208761
] | For underground mines, two major designs that need to be optimised are the stope boundary and the access layout. The optimisation of these two components cannot be done independently as ore extracted from stopes is transported to the surface via the access network. Different stope locations result in different associat... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integrated optimisation of stope boundary and access layout for underground mining operations |
2,032,637,631 | 2013-03-01 | 61,699,894 | [
2090359754,
2128208761,
2126895748
] | [
4293775970,
2126895748,
2090359754,
2313274380,
2048799772,
1551360398,
1534941005,
1999032440,
2128208761,
1985123706,
1551276924
] | A new algorithm to optimize stope design for the sublevel stoping mining method is described. The model is based on a cylindrical coordinate defined around the initial vertical raise. Geotechnical constraints on hanging wall and footwall slopes are translated as precedence relations between blocks in the cylindrical co... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Underground stope optimization with network flow method |
2,766,476,855 | 2017-10-01 | 4,210,195,883 | [] | [
2094566145,
2000715618,
2160763688,
1985080107,
1969483356
] | In the work, the approach to increase overall performance of collieries on the basis of an increase in accuracy of geometrization of coal thicknesses is considered. The sequence of stages of mathematical modelling of spatial placing of indicators of a deposit taking into account allocation of homogeneous sites of thick... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mathematical methods in geometrization of coal field |
3,048,953,340 | 2020-08-12 | 4,210,203,134 | [] | [
2053920929,
2014034914,
2094566145,
2126895748,
1972121892,
2046010791,
2160763688,
2067462952,
1985080107,
1534941005,
2003759470,
1979015826,
2130796978,
2138913627,
1992710140,
1969483356
] | This paper presents an algorithm for optimizing the scheduling of trackless equipment in underground mines. With the shortest working interval and maximum productivity as goals, a genetic algorithm (GA) is used to solve the problem, and obtain the optimal working sequence with the most suitable equipment configuration ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization of Trackless Equipment Scheduling in Underground Mines Using Genetic Algorithms |
4,375,866,295 | 2023-05-05 | 2,737,336,974 | [
1985080107,
1918344999,
2094566145,
2185734033
] | [
2094566145,
1596717185,
2155529731,
1966089218,
2139212933,
2046306310,
2126895748,
2079018504,
4229562638,
2018366608,
2185734033,
2543580944,
1521436688,
2165394332,
1998943389,
1988622494,
2060929952,
2053920929,
2031236641,
2007873570,
1972121892,
2068546981,
20272541... | Digital technologies are continually gaining traction in the mining and mineral processing industries. Several studies have shown the benefits of their application to help improve various aspects of the mineral value chain. Nevertheless, quantitatively assessing new technologies using a holistic approach is vital to ev... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Technology Upgrade Assessment for Open-Pit Mines through Mine Plan Optimization and Discrete Event Simulation |
3,200,361,468 | 2021-01-01 | 106,296,714 | [] | [
2094566145,
2146879621,
1492655370,
2185734033,
1979015826,
1536615069,
1972121892,
1918344999,
2122203560,
2160763688,
2083259944,
1985080107,
1569990960,
2140170679,
2151675709,
2011690685,
2145339207,
1496852045,
2119717200,
2111581650,
1969483356,
2000715618,
15378109... | This work investigates an underground mine equipment dispatching problem under equipment stochastic working times. First, a mathematical model is developed for solving the Equipment Dispatching problem while considering the machines working times as deterministic parameters. Then, Monte Carlo simulation is implemented ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Equipment Dispatching Problem for Underground Mine Under Stochastic Working Times |
1,521,096,629 | 2011-09-01 | 4,210,223,158 | [
2024085737
] | [
2024085737,
2151675709
] | Na mineração subterrânea, diariamente, uma frota de veículo LHD (load-haul-dump) deve ser alocada à rede de galerias para extrair o minério segundo um plano estratégico de trabalho. Esse plano é definido pela alta gerência e contém o número de cargas a serem extraídas desde os pontos de remoção de uma dada galeria para... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modelagem e otimização da operação de veículos na mineração de cobre subterrânea |
2,543,556,832 | 2016-10-01 | 2,764,432,242 | [] | [] | Sustainable mine waste management is a matter that is always at the centre stage of the mining industry. This is because there has been a challenge in achieving sustainable mine waste management practices in the mining sector. It’s a known fact that mining operations respect no boundaries and it is therefore important ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Achieving Sustainable Mine Waste Management Practices through Capacity Building of Stakeholder Engagement the Case of the Zambian Minerals Industry |
3,081,477,513 | 2020-12-01 | 194,185,345 | [] | [
2160763688,
3217061993,
1496852045,
2100769519,
2043345585,
2065332058,
1551276924
] | The sustainable economic success of open-pit mines depends firstly, on the degree of integrity of the mine planning process and secondly, on the extent to which both spatial and intertemporal requirements of approved mine plans are executed. Accordingly, an open-pit mine meeting short-term production targets may fail t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A compliance driver tree (CDT) based approach for improving the alignment of spatial and intertemporal execution with mine planning at open-pit mines |
2,065,504,202 | 2002-08-01 | 72,171,858 | [] | [] | A computer model of a decline truck-haulage system at Callie mine in the Tanami Desert, Northern Territory, Australia, was developed with the use of the dynamic simulation package Planimate, produced by InterDynamics Pty, Ltd. The model was verified and validated as an accurate representation of the real system and the... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Computer simulation of underground truck haulage operations |
2,982,992,612 | 2019-11-07 | 4,306,463,075 | [] | [
2160763688,
2053920929,
1534941005,
2151675709
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Output prediction of Semi Mobile In Pit Crushing and Conveying Systems (SMIPPC) |
4,229,943,770 | 2006-10-02 | 191,798,613 | [
2313274380
] | [
4245152641,
2313274380,
4211007335
] | Abstract Efficient methods to model and optimize the design of open‐cut mines have been known for many years. The design of the infrastructure of underground mines has a similar potential for optimization and strategic planning. In this article we discuss the use of network optimization to tackle this problem. The idea... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Network optimization for the design of underground mines |
2,125,619,089 | 2011-11-01 | 110,258,470 | [
1993663609
] | [
2056621186,
2071419362,
1996216743,
1965278510,
2003934805,
1993663609
] | Synopsis This paper highlights several management practices from the oil and gas industry to support the proposition that financial performance in the finite, non-renewable resource business relates more to upstream rather than downstream activities. Based on the analysis of nine oil and gas companies, this study suppo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Value creation in the resource business |
3,110,448,278 | 2020-01-01 | 4,210,168,846 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | METHODS AND MODELS OF IDENTIFICATION OF RESERVES OF TECHNOLOGICAL UNITS OF URANIUM WELL LEACHING MINE |
2,099,046,697 | 2006-12-01 | 165,152,232 | [] | [] | Commercial feed blending is a complex process consisting of many potential raw ingredients and final products. The sheer number of daily orders and final products at a typical feed mill means that raw ingredients cannot be mixed to directly produce final products in an economical fashion. As a result, the intermediate ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimal Feed Mill Blending |
2,095,353,553 | 2012-03-29 | 2,505,686,813 | [
2158550687
] | [
2158550687
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimum blending of iron ore from Choghart stockpiles by using goal programming |
2,607,716,903 | 2017-05-01 | 2,764,755,457 | [
3121940608
] | [
3121940608,
2059757952,
2094566145,
1992176519,
2016207894,
2019207321,
2004698524,
2060929952,
3123068586,
2126258480,
2128530362,
2079325629,
2059536960,
2585206336,
2146612430,
2077791698,
1987347924,
2148143831,
1966119267,
1537810918,
4211007335,
2126311658,
21379832... | Abstract This paper analyzes an open pit gold mine project based on the O’Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like product... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | NPV risk simulation of an open pit gold mine project under the O’Hara cost model by using GAs |
2,123,215,948 | 2012-04-01 | 4,306,423,870 | [] | [
2026992098,
2615190415
] | The determination of cut-off grade involves complicated analysis and calculations, and it has close relations with the knowledge of geology, mining, mineral processing, applied mathematics, economics and management. Traditional methods model the cut-off grade optimization problem as a deterministic one and do not expli... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Cut-Off Grade Optimization Using Stochastic Programming in Open-Pit Mining |
2,076,099,223 | 2007-01-01 | 167,080,051 | [] | [
3121759882,
1482088571,
2043656509,
2088398703
] | El 1 de enero del ano 2006, entro a regir el impuesto especial o adicional a la renta operacion de las empresas mineras, conocido como Royalty. Mas alla de las diferentes formas en que fue tecnicamente planteado, su discusion permitio observar algunas realidades anexas dignas de un analisis mas detenido. La mas relevan... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Más allá del royalty: Análisis crítico de la tributación minera |
26,693,501 | 2012-01-01 | 4,306,463,937 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Orebody Model Compression Research Based on Decimal Morton Code |
2,964,494,823 | 2019-06-20 | 4,220,650,844 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | DETERMINING OF MINING TRANSPORT CAPACITY BY SIMULATION |
754,578,237 | 2005-01-01 | 2,946,866,068 | [] | [] | This study is predicted tool deformation by cutting forces and chip-tool interface temperature in machining process. Modeling of tool is made using 3D CAD software, finite element method is performed by cutting forces and temperature. Cutting forces and temperature used load conditions are predicted using the cutting f... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A study on Finite Element Analysis of Tool Deformation in End Milling |
1,534,941,005 | 2003-01-01 | 115,925,768 | [
3217061993
] | [
2111563176,
3217061993,
2163428398,
2029681015,
2169528473
] | The economic viability of the modern day mine is highly dependent upon careful planning and management. Declining trends in average ore grades, increasing mining costs and environmental considerations will ensure that this situation will remain in the foreseeable future. The operation and management of a large open pit... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | |
4,377,989,887 | 2023-05-24 | 4,210,203,134 | [
2313274380
] | [
2077098498,
2128990851,
2100495367,
2313274380,
1971998222,
2185734033,
2160763688,
2000359213,
2036016432,
2136922672,
2160642098,
2130519480,
1424654272,
1977177161,
1971086298,
2065332058,
4235169531,
2085227243,
2100769519,
2002440441,
2919115771,
2125691646
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Underground Haulage Network Design Using HDBSCAN and RRT Algorithms Built on Dubins Path |
4,239,470,645 | 2017-01-01 | 107,246,200 | [] | [] | Underground mining operations are managed in an environment that is surrounded by a series of complex geotechnical, operational and economic restrictions; and operation costs increase mainly because underground mining goes deeper. As a response to this increase, mine planning has potential to improve operation performa... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Heuristic stope layout optimisation accounting for variable stope dimensions and dilution management |
2,799,461,385 | 2018-02-08 | 4,210,230,698 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | THE STUDY OF MINING EQUIPMENT CONCENTRATION DYNAMICS IN CONDITIONS OF DEEP OPEN PITS OF THE NORTH |
641,948,740 | 2010-01-08 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Techno-economic optimization of level and raise spacing in Bushveld Complex platinum reef conventional breast mining. |
3,045,906,326 | 2020-12-01 | 114,739,668 | [] | [
2072834565,
2160763688,
2164768649,
3217061993,
1985080107,
1534941005,
2130796978,
1512342490,
2151675709,
2121863487
] | Continuous and discrete event simulations are often applied to study the behavior of systems with continuous and discrete flow, respectively. However, in real-life scenarios, both continuous and discrete flows can be observed within the same system. In such cases, discretization of a continuous flow system can allow mo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Evaluation of bunker size for continuous/discrete flow systems by applying discrete event simulation: A case study in mining |
3,148,496,847 | 2021-04-07 | 4,306,400,194 | [
1551276924,
1979015826,
1595159159,
2094566145
] | [
2094566145,
2155529731,
2126895748,
1998448012,
2106905228,
1979015826,
2024742034,
2156194072,
1972121892,
2068546981,
1918344999,
2160763688,
2046010791,
2162145193,
1992710140,
2043345585,
2130796978,
2140170679,
2145479420,
2143381319,
1534941005,
2137340504,
21197094... | The Stockpile blending problem is an important component of mine production scheduling, where stockpiles are used to store and blend raw material. The goal of blending material from stockpiles is to create parcels of concentrate which contain optimal metal grades based on the material available. The volume of material ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Heuristic Strategies for Solving Complex Interacting Large-Scale Stockpile Blending Problems |
3,013,382,867 | 2020-08-01 | 2,764,855,249 | [] | [] | <span>This article shows a prospective utilizations of flexible AC transmission system (FACTS) controls, like the static VAR compensator (SVC). One of the major motives for setting up an SVC is to recover dynamic voltage controller and thus increase system load aptitude. Static VAR compensator system proposed in ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Hybrid control strategies of SVC for reactive power compensation |
2,371,358,756 | 2007-01-01 | 2,765,008,106 | [] | [] | Traditional monitoring system has some shortcomings,such as it can not monitor remote equipment in real-time and can not share the resource effectively.To solve these problems,the paper puts forward a method by designing a remote monitoring system based on ASP.NET technology.This system adopts B/S mode to connect WAN a... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Realization of remote monitoring and control system based on ASP.NET technology |
2,962,699,271 | 2019-05-22 | 4,306,463,075 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Framework of optimal operational indices for the open pit mines production scheduling problems |
4,285,219,922 | 2022-01-01 | 4,210,172,589 | [
2165698076,
2043345585,
1918344999,
2185734033
] | [
2094566145,
2126895748,
2046372107,
2543580944,
2185734033,
1979015826,
2157098139,
2165698076,
2060929952,
2053920929,
2068546981,
1918344999,
2078327207,
2160763688,
2046010791,
1985080107,
2162145193,
2150593711,
1569990960,
2043345585,
2130796978,
2151675709,
20209992... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simultaneous Stochastic Optimization of a Mining Complex with Preconcentration Using Reinforcement Learning |
3,187,977,132 | 2021-07-31 | 4,210,233,668 | [] | [
2059536960
] | The nature and characteristics of rock and rock derivatives forming the crust of the earth vary so greatly from place to place that it is impossible to use the same numerical factors to show the productive ability of excavating equipment on different jobs or projects. Factors for each project must be developed individu... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Surface Mining Equipments |
2,754,189,829 | 2017-08-01 | 14,913,209 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of basing theory in manufacturing |
2,189,529,303 | 2012-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | IMPACTO DE DIFERENTES ALGORITMOS E GEOMETRIA DE DEPÓSITOS MINERAIS NO PLANEJAMENTO DE LONGO PRAZO |
2,276,945,852 | 2015-12-07 | 48,643,595 | [
2053920929
] | [
2059536960,
2053920929,
2798344481,
1972121892,
2168936936,
2160763688,
2123696861,
194786220,
2094688336,
2042102899,
1748537427,
2912565176,
1969483356,
2151675709,
1965473535
] | Equipment selection is a key strategic decision in the design of a material handling system, because an improper one will lead to operational problems and unnecessary investment costs. It involves determining the number and combination of loaders and trucks which will move the material, fulfilling a specified productio... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integrating mining loading and hauling equipment selection and replacement decisions using stochastic linear programming |
2,386,917,388 | 2006-01-01 | 142,630,227 | [] | [] | There are two steps in determining proved reserves by the SEC standard,i.e.defining reservoir boundary and determining reserves boundary based on the well.Reservoir boundary consists of oil-gas-water contact,the boundaries of fault,stratum,and lithology,and the lowest known oil/gas(LKO/G) etc.The key issue in determini... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Methods of determining proved reserves by SEC standard |
2,806,638,556 | 2017-06-26 | 4,210,189,104 | [] | [] | Dalam usaha peningkatan produk tifitas Overburden diperlukan rencana kebutuhan alat muat dan alat angkut yang tujuannya agar alat muat dan alat angkut yang dioperasikan mampu bekerja secara optimal sesuai dengan kondisi alat tersebut. Metode penambangan yang diterapkan di PT. Samantaka Batubara adalah cara tambang terb... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | EFISIENSI ALAT MUAT DAN ALAT ANGKUT UNTUK PENGUPASAN OVERBURDEN PADA SITE A DI PT. SAMANTAKA BATUBARA DESA PAUH RANAP KECAMATAN PERANAP KABUPATEN INDRAGIRI HULU PROVINSI RIAU |
2,068,042,538 | 2015-04-11 | 4,210,235,478 | [] | [] | Summary Development of the oil sands in northeastern Alberta is an important contributor to the economies of both Alberta and Canada, but this type of hydrocarbon resource is often perceived by some as representing daunting environmental challenges. One particular area of stakeholder focus is the nature of the surface-... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Progressive Land Reclamation as the Design-and-Operational Basis for the Kearl Oil-Sands Mine |
2,241,671,012 | 2008-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining |
2,061,723,482 | 2012-03-01 | 194,185,345 | [] | [
2059757952,
1480376833,
2020999234,
4210300258,
1972121892,
1537810918,
3217061993,
2126311658,
1995565517,
2146612430,
1534941005,
2126258480,
2077791698,
2024060531,
2165201397,
1551276924
] | An open pit mining operation consists of various stages, and the calculation of the production capacities of these stages depends upon the available supply of ore (mineralized material of economic value) and waste material. Cutoff grade is the criterion that specifies the amount of ore and waste. The material with grad... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles |
2,405,295,694 | 2016-01-01 | 2,764,472,783 | [] | [] | Underwater coal exploitation is carried out by the use of underwater excavator Kovin I. The mined coal is transported through a pump system as a hydro mixture via the pipeline O900 mm to the facility for irrigation and classification of the mined coal. From this facility, the undersieve goes to the coal settling basin,... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Maintaining the functionality of the coal settling basin at the underwater pit Kovin |
3,028,239,441 | 2020-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Adaptive simultaneous stochastic optimization of a gold mining complex: A case study |
1,447,818,782 | 2013-01-01 | 4,306,535,748 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Wykorzystanie nowoczesnych narzędzi informatycznych w projektowaniu kopalni Gubin |
2,521,809,078 | 2015-11-01 | 206,834,481 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Selection of load–haul–dump machines for hard mineral mining in difficult mining and geological conditions |
2,030,185,404 | 2012-09-01 | 4,210,223,158 | [
2140170679,
2151675709
] | [
2130796978,
2010334716,
2151675709,
2140170679
] | No presente trabalho, realizou-se uma análise comparativa das metodologias utilizadas para o despacho de caminhões em minas a céu aberto. Comparações entre essas metodologias contam com poucos trabalhos publicados na literatura. Metodologias baseadas em programação linear e programação dinâmica e em heurística foram im... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Análise comparativa de metodologias utilizadas no despacho de caminhões em minas a céu aberto |
3,143,928,406 | 2016-01-01 | 4,306,555,668 | [] | [] | The mining industry annually consumes trillions of British thermal units of energy,a large part of which is saveable.Diesel fuel is a significant source of energy in surface mining operations and haul trucks are the major users of this energy source.Cross vehicle weight,truck velocity and total resistance have been rec... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Development of a multi-layer perceptron artificial neural network model to determine haul trucks energy consumption |
4,225,007,763 | 2022-04-28 | 26,994,821 | [
1969483356,
2000715618,
2094566145,
2128208761
] | [
2094566145,
2019291268,
2126895748,
1647779468,
2185734033,
1979015826,
1484040084,
2154929945,
1988622494,
2060929952,
1972121892,
2068546981,
1918344999,
2160763688,
2046010791,
1985080107,
1608758704,
2043345585,
1569990960,
2130796978,
2134673975,
2140170679,
21516757... | Open-pit mining plans include implementing operations throughout the entire life of the mine. In addition to geometric and geotechnical constraints, it is important to ensure an uninterrupted ore feed by optimizing production plan. In order to achieve this and at the same time maximize the net present value, the most w... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization of open-pit mine design and production planning with an improved floating cone algorithm |
2,055,015,708 | 2014-03-07 | 77,056,576 | [
2157846217,
2100769519,
2160763688,
2081278763,
1979015826,
1534941005,
2068546981
] | [
2126895748,
1979015826,
2169528473,
2053920929,
1972121892,
2068546981,
2160763688,
2081278763,
2126258480,
2043345585,
2130796978,
2088304441,
2151675709,
2076785727,
2157846217,
1534941005,
1496852045,
2904250082,
3217061993,
2100769519,
2024060531,
1551276924
] | During the last few years, most production-based businesses have been under enormous pressure to improve their top-line growth and bottom-line savings. As a result, many companies are turning to systems and technologies that can help optimise their supply chain activities. In this paper, we discuss a real-world applica... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Scheduling in iron ore open-pit mining |
56,967,118 | 2007-01-01 | 2,764,461,748 | [
2165299997,
2152195021,
2158814833,
2128208761
] | [
2142183404,
2152195021,
2158814833,
1639032689,
2109364787,
4234406933,
2128208761,
1659842140,
2165299997,
2001619934
] | In the capacitated open pit mining problem, we consider the sequential extraction of blocks in order to maximize the total discounted profit under an extraction capacity during each period of the horizon. We propose a formulation closely related to the resource-constrained project scheduling problem(RCPSP) where the ge... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of a Particle Swarm Algorithm to the Capacitated Open Pit Mining Problem |
2,761,766,846 | 2017-01-01 | null | [] | [] | How to effectively plan, sequence and schedule for extraction the areas within an underground mining operation is a financial reward-maximising issue for the mining community. The mining industry is one that has a heightened level of uncertainty due to the fact that the product is not known with certainty until after i... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Using the single index model to create a short-term mine plan |
3,135,217,054 | 2021-03-04 | 48,643,595 | [
2024060531,
2100769519,
1992710140,
2160763688,
1918344999,
1979015826,
2543580944,
2130796978,
2068546981,
2185734033,
1969483356,
2000715618,
1534941005,
2065332058,
2094566145
] | [
1497256448,
2094566145,
2126895748,
1976744965,
2105002757,
1996707465,
2169245194,
1993885071,
2543580944,
2185734033,
1979015826,
4236127247,
2170480532,
4234406933,
2169528473,
2154929945,
2060929952,
2053920929,
1988729251,
1972121892,
2068546981,
2122244604,
19183449... | The open pit mine production scheduling problem determines a sequence of three-dimensional, notional block extraction that maximises net present value (NPV) of future cash flows and satisfies technical and operational constraints such as precedence between blocks and resource availability. Since the 1960s, researchers ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Review of Solution Methodologies for Open Pit Mine Production Scheduling Problem |
3,215,528,506 | 2021-11-22 | 48,643,595 | [
2128361327,
1979015826
] | [
2126895748,
2185734033,
1979015826,
1972121892,
2160763688,
1985080107,
2043345585,
2130796978,
2140170679,
2078286011,
1976122053,
2090359754,
2140764876,
1534941005,
2041085006,
1969483356,
1493454437,
2128361327,
2100769519,
2037551729,
2011430131,
2128208761,
15512769... | Despite the upward trend in using semi-mobile in-pit crushing and conveying system (SMIPCC), some mining companies still hesitate to use SMIPCC in their operations. Therefore, a framework is needed to facilitate decision-making between SMIPCC and truck and shovel system (TS) and satisfy the location and relocation time... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimisation of open-pit mine production scheduling considering optimum transportation system between truck haulage and semi-mobile in-pit crushing and conveying |
3,000,412,397 | 2020-01-06 | 138,400,101 | [
1985080107,
2118465040,
1988786380
] | [
2059757952,
2019291268,
2134807435,
1647779468,
2118465040,
2060929952,
1918344999,
2160763688,
3124407081,
1995834279,
1985080107,
2126258480,
1569990960,
1971394868,
4365787967,
2104795328,
2020999234,
1988786380,
2146612430,
1497179728,
1997426513,
2077791698,
20653320... | The purpose of this study is to generate efficient policies for the selection and postponement of copper sales contracts by a mining company. To do so, it uses a two‐stage stochastic programming model that determines solutions considering different contract types, random prices, and risk aversion. The results show how ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Efficient selection of copper sales contracts for small‐ and medium‐sized mining |
2,397,141,481 | 2016-05-01 | 4,306,497,965 | [] | [
2041208362,
2161005291,
2139824765,
2057798351
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | MODELING AND OPTIMIZATION FOR LED BULB ASSEMBLY LINE |
2,374,288,338 | 2005-01-01 | 2,765,068,731 | [] | [] | The risk analysis is the most crucial element in the investment decision-making of oil-gas exploration project. The parameters for reserves, exploitation, oil recovery and financial affairs are indeterminate. If these parameters are determined, the uniqueness of evaluation result is contrary to the high risk of explora... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | RISK ANALYSIS TECHNOLOGY FOR THE SINGLE EXPLORATION PROJECT |
2,003,899,936 | 2014-08-01 | 4,306,418,839 | [] | [
2114915621
] | Articulated vehicles are suitable for working on bumpy road and in narrow space. They are used in open-pit mine vehicles and underground vehicles. In this paper we focus on driving control strategy of 4-wheel articulated electric drive vehicles. By analyzing characteristics of articulated vehicles and working performan... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research on driving control strategy of 4-wheel articulated electric drive vehicles |
2,885,533,152 | 2018-01-01 | 110,258,470 | [] | [] | The design of pushbacks in an open pit mine has a significant impact on the mine's profitability. Automatic generation of practical pushbacks is a highly desirable feature, but current automatic solutions fail to sufficiently account for complex geometric requirements of pushbacks, including slopes, phase bench and bot... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Automatic generation of feasible mining pushbacks for open pit strategic planning |
4,285,540,054 | 2021-01-01 | 2,764,472,783 | [] | [] | The Additional Mining Design for coal exploitation at the open pit "Potrlica" - Pljevlja for the period 2020 - 2025, has defined the exploitation system important parameters and development of the open pit. Among others, for the first half of 2022, it is planned to move the crushing plant to a new position, in a direct... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Technical-economic analysis of variants of a micro location for the DTO crushing plant of the DTO system and connecting conveyor T1 at the open pit Potrlica, Pljevlja |
3,128,895,505 | 2004-01-01 | 4,306,509,410 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Bilkent Üniversitesi personel taşıma sistemi için etkin ve ekonomik çözüm |
2,075,205,575 | 2013-02-01 | 128,754,310 | [] | [
2137100320,
1998440482,
2143157063,
2112737587,
2118889717,
2121608917,
2043260411,
2130212796,
2013117405,
1975687263
] | A design of long-distance and high-accuracy rail subgrade deformation monitoring system based on Zigbee wireless network is proposed according to the requirement of inclination measurement for the Qinghai-Tibet railway rail subgrade. This paper selects Atmega128 as the microprocessor of the system, and uses SCA103T as ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Design of Long-Distance and High-Accuracy Rail Subgrade Deformation Monitoring System Based on Zigbee Wireless Network |
1,490,214,796 | 2016-02-05 | 72,171,858 | [
2160763688
] | [
2053920929,
2126895748,
2068546981,
1972121892,
2160763688,
3217061993,
1496852045,
1534941005,
2100769519,
2126258480,
2043345585,
2130796978,
1979015826,
2128208761,
2169528473,
1551276924,
2151675709
] | Decision-making in mining is a challenging task. Optimal decisions regarding shovel and truck allocations, in consideration to the short-term production schedule, are very important to keep the operations inline with the planned objectives of the company in long term. This paper presents a mixed integer linear goal pro... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Truck-shovel allocation optimisation: a goal programming approach |
2,784,517,077 | 2018-01-01 | null | [
1969483356
] | [
2060929952,
2094566145,
1972121892,
2126895748,
1985080107,
1534941005,
2043345585,
1551276924,
1969483356
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Production Schedule Optimisation—Meeting Targets by Hedging Against Geological Risk While Addressing Environmental and Equipment Concerns |
3,186,521,885 | 2021-07-16 | 178,238,111 | [] | [
1995723008,
2094566145,
2112935810,
2043129860,
2168175751,
2107974152,
2056246536,
2115231242,
1965087246,
2013158160,
2118167953,
1979015826,
1932372884,
2090972948,
2083127319,
4239510810,
2116859162,
2483010461,
2090838176,
2097467169,
2060929952,
599776289,
201157610... | Nowadays, one of the most significant problems in mining activities is the significance of analyzing environmental issues along with mining, concentration, and mineral processing operations to achieve the goals of sustainable development. Nevertheless, mine owners refuse to include environmental costs (EC) and consider... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis of Environmental Costs’ Effect in Green Mining Strategy Using a System Dynamics Approach: A Case Study |
2,153,658,095 | 2001-09-01 | 28,359,369 | [] | [] | Life of mine scheduling involves sequencing and timing of ore and waste movement during the life of a mine and therefore, has a significant effect on the cash flow of a mining operation. Mine planners often seek to optimise the production schedule with respect to maximise net present value (NPV) of the cash flows. The ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimising Life of Mine Production Schedules in Multiple Open Pit Mining Operations A Study of Effects of Production Constraints on NPV |
1,501,026,819 | 2005-08-08 | 2,764,461,748 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A new approach for the fuzzy shortest path problem |
3,099,411,306 | 2020-07-10 | 4,210,238,743 | [
2140481308
] | [
2140481308
] | PT PJB UPJ O&M PLTU Paiton is a steam power plant that uses coal as fuel for coal handling plant. However, the infrastructure conditions of PT PJB UPJ O&M PLTU Paiton do not support coal multisuppliers. The objectives of this study are to obtain a design model that can simulate coal removal systems at coal hand... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | SIMULATION OF COAL HANDLING PLANT TO SUPPORT THE STABILITY OF COAL SUPPLY |
1,491,479,970 | 2009-01-01 | 4,306,527,432 | [
2140170679
] | [
2130796978,
2010334716,
2140170679
] | Este trabalho apresenta uma nova formulacao para o problema de planejamento operacional de lavra (POLAD). Neste problema, cada frente possui caracteristicas de qualidade diferentes e o ritmo de lavra deve ser realizado de forma proporcional, de forma a gerar uma alimentacao que atenda as metas de qualidade e producao p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Uma nova formulação de programacão matemática para o problema de planejamento de lavra |
2,027,131,578 | 2002-09-01 | 46,124,462 | [] | [] | An expert system was developed for equipment selection for various unit operations in open pit mining. For each unit operation, it considers a wide variety of equipment and ranks them based on their suitability. A major difference between this system and other published expert systems in the considered domain is that i... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Expert System for Equipment Selection |
2,051,902,589 | 2008-06-01 | 72,171,858 | [] | [
2313274380,
1534941005
] | This paper focuses on the problem of optimising the design of an underground mine decline, so as to minimise the costs associated with infrastructure development and haulage over the lifetime of the mine. A key design consideration is that the decline must be navigable by trucks and mining equipment, hence must satisfy... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Decline design in underground mines using constrained path optimisation |
2,940,894,022 | 2019-08-01 | 58,516,903 | [
2160763688
] | [
1969397762,
2126895748,
3123282572,
1981557392,
1979015826,
2090972948,
2052447638,
2169528473,
2164946207,
2053920929,
2162666018,
1972121892,
2068546981,
2160763688,
1965278510,
2126258480,
2130796978,
2031817269,
2008936765,
2151675709,
2055013323,
1496852045,
20578979... | Off-The-Road (OTR) tires represent an important part of the operational costs of the mining industry. Each year, a typical operation consumes hundreds of tires. In general worn and damaged tires are not reused and represent a major issue for mining sustainability. In terms of operational costs, tires are only second to... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Reducing mining footprint by matching haul fleet demand and route-oriented tire types |
3,213,782,900 | 2021-11-12 | 2,737,336,974 | [
1988115241,
2040870580,
2051434435,
1918344999,
2137983211,
2185734033
] | [
2094566145,
2126895748,
2046372107,
2543580944,
2185734033,
1979015826,
2157098139,
2060929952,
2053920929,
1918344999,
2078327207,
1988115241,
2160763688,
1985080107,
2162145193,
2090132397,
2152358062,
2150593711,
1569990960,
2043345585,
2130796978,
2032331699,
20408705... | With the increased use of digital technologies in the mining industry, the amount of centrally stored production data is continuously growing. However, datasets in mines and processing plants are not fully utilized to build links between extracted materials and metallurgical plant performances. This article shows a cas... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Applied Machine Learning for Geometallurgical Throughput Prediction—A Case Study Using Production Data at the Tropicana Gold Mining Complex |
153,688,795 | 2004-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Fractal-based fault simulation using a geological analogue: Quantification of fault risk at Wyong, NSW, Australia |
2,054,796,629 | 2005-10-01 | 103,321,696 | [] | [] | This paper describes the problem of managing a fleet of load-haul-dump (LHD) vehicles in an underground mine. The problem consists of dispatching, routing and scheduling vehicles whenever they need to be assigned to a new task. The solution approach is based on a shortest-path algorithm. Each decision takes into accoun... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A shortest-path algorithm for solving the fleet management problem in underground mines |
2,582,550,132 | 2017-03-01 | 2,764,755,457 | [
2053920929,
2151675709
] | [
2060929952,
2053920929,
2094039233,
2025878787,
1972121892,
2089269509,
2145493798,
2798344481,
2094566145,
2123696861,
1534941005,
2048769967,
2041645394,
2096305430,
2049176600,
2128208761,
2151675709
] | One of the key factors in a profitable open-pit mine is the efficiency of the waste disposal system. Using GPS-technology, the truck-dispatching decisions can be made in real-time but the chosen strategy has a crucial role. Therefore, finding the optimal dispatching strategy for truck-shovel operations is extremely imp... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Digitalization of mine operations: Scenarios to benefit in real-time truck dispatching |
2,971,358,647 | 2019-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization of the cycle time to increase productivity at Ruashi Mining |
16,089,132 | 2014-12-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Payload variance plays a critical role in the fuel consumption of mining haul trucks |
2,064,433,310 | 2013-12-01 | 194,185,345 | [] | [
2059757952,
4210300258,
2126895748,
1972121892,
3217061993,
2126311658,
1985080107,
2090359754,
1534941005,
2146612430,
2126258480,
1639032689,
2077791698,
2165201397,
2128208761,
1551276924
] | Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple processing streams of an open pit mining complex. An optimal cutoff grade strategy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and marketing/refining capacity co... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams |
2,511,818,416 | 2016-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Where to make the transition from open-pit to underground? Using integer programming |
2,558,800,934 | 2016-01-01 | 91,284,046 | [] | [] | The trend in a drive system for dump trucks used in the mining industry is moving away from a mechanical drive system toward an electric drive system because of the increasing efficiency of mining operations. Therefore, an AC drive system for mining dump trucks has been developed. Dump trucks are decelerated by an elec... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stop Control Method of Electrically Driven Mining Dump Trucks |
2,080,118,081 | 2013-09-01 | 4,210,180,762 | [] | [
2126105956,
1534941005
] | When ore is being selected from a regularised block model, a common procedure is to accept as ore any block whose iron content exceeds a cut-off value, and whose content in each contaminant analyte is below an appropriate cut-off value. This method defines a quadrant within the multidimensional analyte space, such that... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Selection of ore from multiple pits |
2,768,085,706 | 2017-01-01 | 45,645,249 | [] | [
2053920929,
1972121892,
2151675709,
1969483356,
2123696861
] | Nowadays and in the near foreseeable future the quarry road transport will be the most common in the open-cut mining method. This is due to a range of advantages of open-pit dump trucks usage as compared with other types of quarry transport, i.e. autonomy, the possibility of using in any mining engineering and climatic... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Selection of Open-Pit Dump Trucks during Quarry Reconstruction |
2,279,757,996 | 2018-01-01 | 4,306,463,937 | [] | [
2122244604,
2151675709
] | A mine landform progression plan can provide a clear outlook of the entire mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or tonnage) and the allocated dumping location. However, current practise mainly focuses on the ore production, over-si... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimising the Long Term Mine Landform Progression and Truck Hour Schedule in a Large Scale Open Pit Mine Using Mixed Integer Programming |