sample_id int64 1 417 | video_id stringclasses 18
values | video_url stringclasses 18
values | question stringlengths 31 140 | answer_complete stringlengths 56 1k | answer_summary stringlengths 2 275 | answer_evidence stringlengths 56 557 | evidence dict | type stringclasses 5
values |
|---|---|---|---|---|---|---|---|---|
101 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | What sequence of components is handled on the shaft after it is processed into the gear plate hole? | The operator inserts a large gear, then a small spacer, and finally screws a nut. <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand. <38.67-42.53> the operator insert [large gear 11] onto [shaft 10] by hand. <42.60-45.27> the operator insert [small spacer 15] onto [shaft 10] by hand. <45.87... | The operator inserts a large gear, then a small spacer, and finally screws a nut. | <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand. <38.67-42.53> the operator insert [large gear 11] onto [shaft 10] by hand. <42.60-45.27> the operator insert [small spacer 15] onto [shaft 10] by hand. <45.87-51.93> the operator screw [nut 17] onto [shaft 10] by hand. | {
"temporal": {
"<T1>": [
"23.33",
"35.20"
],
"<T2>": [
"38.67",
"42.53"
],
"<T3>": [
"42.60",
"45.27"
],
"<T4>": [
"45.87",
"51.93"
]
},
"spatial": {
"shaft": "{10}",
"gear plate hole 1": "{5}",
"large gear": "{11}",
... | Type 1: [Action Sequence] |
102 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | How are the large gear, small spacer, and nut processed during their assembly onto the shaft? | The large gear, small spacer, and nut are all assembled onto the shaft by hand. <38.67-42.53> the operator insert [large gear 11] onto [shaft 10] by hand. <42.60-45.27> the operator insert [small spacer 15] onto [shaft 10] by hand. <45.87-51.93> the operator screw [nut 17] onto [shaft 10] by hand. | The large gear, small spacer, and nut are all assembled onto the shaft by hand. | <38.67-42.53> the operator insert [large gear 11] onto [shaft 10] by hand. <42.60-45.27> the operator insert [small spacer 15] onto [shaft 10] by hand. <45.87-51.93> the operator screw [nut 17] onto [shaft 10] by hand. | {
"temporal": {
"<T1>": [
"38.67",
"42.53"
],
"<T2>": [
"42.60",
"45.27"
],
"<T3>": [
"45.87",
"51.93"
]
},
"spatial": {
"large gear": "{11}",
"shaft": "{10}",
"small spacer": "{15}",
"nut": "{17}"
}
} | Type 3:[Operation Manner] |
103 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | What action is performed immediately after the small spacer is moved onto the shaft? | <45.87-51.93> the operator screw [nut 17] onto [shaft 10] by hand. | the operator screw nut onto shaft by hand. | <45.87-51.93> the operator screw [nut 17] onto [shaft 10] by hand. | {
"temporal": {
"<T1>": [
"45.87",
"51.93"
]
},
"spatial": {
"nut": "{17}",
"shaft": "{10}"
}
} | Type 4:[Anchor Tracking] |
104 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | What is the sequence of actions performed to handle the components during the assembly of the gear plate and box? | [Direct Summary Answer] The operator first places a worm gear into the box, followed by screwing a philips screw and two shafts into the gear plate holes. [Exhaustive Evidence List] <8.07-11.60> the operator place [worm gear 7] into [box 3] by hand. <11.67-23.27> the operator screw [philips screw 8] into [gear plate ho... | The operator first places a worm gear into the box, followed by screwing a philips screw and two shafts into the gear plate holes. | [Exhaustive Evidence List] <8.07-11.60> the operator place [worm gear 7] into [box 3] by hand. <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand. <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand. <52.00-56.93> the operator screw [shaft 9] into [gear plat... | {
"temporal": {
"<T1>": [
"8.07",
"11.60"
],
"<T2>": [
"11.67",
"23.27"
],
"<T3>": [
"23.33",
"35.20"
],
"<T4>": [
"52.00",
"56.93"
]
},
"spatial": {
"worm gear": "{7}",
"box": "{3}",
"philips screw": "{8}",
"gear plat... | Type 1: [Action Sequence] |
105 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | How are the shafts handled when being processed in the gear plate holes? | [Direct Summary Answer] The shafts are screwed into the gear plate holes by hand. [Exhaustive Evidence List] <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand. <52.00-56.93> the operator screw [shaft 9] into [gear plate hole 2 6] by hand. | The shafts are screwed into the gear plate holes by hand. | [Exhaustive Evidence List] <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand. <52.00-56.93> the operator screw [shaft 9] into [gear plate hole 2 6] by hand. | {
"temporal": {
"<T1>": [
"23.33",
"35.20"
],
"<T2>": [
"52.00",
"56.93"
]
},
"spatial": {
"shaft": "{9, 10}",
"gear plate hole 1": "{5}",
"gear plate hole 2": "{6}"
}
} | Type 3:[Operation Manner] |
106 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | How many gear plate holes are processed throughout the assembly sequence? | [Direct Summary Answer] A total of 3 gear plate holes are processed. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand. <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand. <52.00-56.93> the operator screw [shaft 9] into [gear pla... | A total of 3 gear plate holes are processed. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand. <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand. <52.00-56.93> the operator screw [shaft 9] into [gear plate hole 2 6] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"52.00",
"56.93"
]
},
"spatial": {
"philips screw": "{8}",
"gear plate hole 3": "{4}",
"shaft": "{9, 10}",
"gear plate hole 1": "{5}",
"gear plate h... | Type 2:[Spatial Counting] |
107 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | How many gear plate holes are handled throughout the assembly? | The operator handles 3 gear plate holes. <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand; <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand; <57.00-61.40> the operator screw [shaft 9] into [gear plate hole 2 6] by hand. | The operator handles 3 gear plate holes. | <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand; <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand; <57.00-61.40> the operator screw [shaft 9] into [gear plate hole 2 6] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"57.00",
"61.40"
]
},
"spatial": {
"philips screw": "{8}",
"gear plate hole 3": "{4}",
"shaft": "{9, 10}",
"gear plate hole 1": "{5}",
"gear plate h... | Type 2:[Spatial Counting] |
108 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | What is the chronological sequence of actions performed on the gear plate holes and the shafts? | The operator handles the gear plate holes by screwing a philips screw and two shafts into them, while also inserting a small gear into a shaft. <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand; <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand; <57.00-61... | The operator handles the gear plate holes by screwing a philips screw and two shafts into them, while also inserting a small gear into a shaft. | <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand; <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand; <57.00-61.40> the operator screw [shaft 9] into [gear plate hole 2 6] by hand; <57.00-58.93> the operator insert [small gear 18] into [shaft 9] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"57.00",
"61.40"
],
"<T4>": [
"57.00",
"58.93"
]
},
"spatial": {
"philips screw": "{8}",
"gear plate hole 3": "{4}",
"shaft": "{9, 10}",... | Type 1: [Action Sequence] |
109 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | How is the small gear processed in relation to the shafts? | <57.00-58.93> the operator insert [small gear 18] into [shaft 9] by hand | the operator insert small gear into shaft by hand | <57.00-58.93> the operator insert [small gear 18] into [shaft 9] by hand | {
"temporal": {
"<T1>": [
"57.00",
"58.93"
]
},
"spatial": {
"small gear": "{18}",
"shaft": "{9}"
}
} | Type 3:[Operation Manner] |
110 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | What is the sequence of items processed within the gear plate holes? | [Direct Summary Answer] The operator screws a philips screw, followed by two shafts into the gear plate holes. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand, <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand, and <61.47-66.8... | The operator screws a philips screw, followed by two shafts into the gear plate holes. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand, <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand, and <61.47-66.87> the operator screw [shaft 9] into [gear plate hole 2 6] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"61.47",
"66.87"
]
},
"spatial": {
"philips screw": "{8}",
"gear plate hole 3": "{4}",
"shaft": "{9, 10}",
"gear plate hole 1": "{5}",
"gear plate h... | Type 1: [Action Sequence] |
111 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | How many gear plate holes are handled throughout the assembly process? | [Direct Summary Answer] There are 3 gear plate holes handled in total. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand, <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand, and <61.47-66.87> the operator screw [shaft 9] into [ge... | There are 3 gear plate holes handled in total. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand, <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand, and <61.47-66.87> the operator screw [shaft 9] into [gear plate hole 2 6] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"61.47",
"66.87"
]
},
"spatial": {
"philips screw": "{8}",
"gear plate hole 3": "{4}",
"shaft": "{9, 10}",
"gear plate hole 1": "{5}",
"gear plate h... | Type 2:[Spatial Counting] |
112 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | How does the operator process the items within the gear plate holes? | [Direct Summary Answer] All items are screwed into the gear plate holes by hand. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand, <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand, and <61.47-66.87> the operator screw [shaft 9... | All items are screwed into the gear plate holes by hand. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand, <23.33-35.20> the operator screw [shaft 10] into [gear plate hole 1 5] by hand, and <61.47-66.87> the operator screw [shaft 9] into [gear plate hole 2 6] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"61.47",
"66.87"
]
},
"spatial": {
"philips screw": "{8}",
"gear plate hole 3": "{4}",
"shaft": "{9, 10}",
"gear plate hole 1": "{5}",
"gear plate h... | Type 3:[Operation Manner] |
113 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | What item is processed at the same time as the operator handles the last of the shafts within the gear plate holes? | <61.47-66.07> the operator screw [nut 16] onto [shaft 9] by hand. | the operator screw nut onto shaft by hand. | <61.47-66.07> the operator screw [nut 16] onto [shaft 9] by hand. | {
"temporal": {
"<T1>": [
"61.47",
"66.07"
]
},
"spatial": {
"nut": "{16}",
"shaft": "{9}"
}
} | Type 5:[Comparative Reasoning] |
114 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | What is the first item handled after the worm gear is moved into the box? | <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand. | the operator screw philips screw into gear plate hole 3 by hand. | <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
]
},
"spatial": {
"philips screw": "{8}",
"gear plate hole 3": "{4}"
}
} | Type 1: [Action Sequence] |
115 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | What is the sequence of actions performed on the gear plate holes after the worm gear is handled? | [Direct Summary Answer] After the worm gear is placed into the box, the operator screws a philips screw and two shafts into the gear plate holes by hand. [Exhaustive Evidence List] <8.07-11.60> the operator place [worm gear 7] into [box 3] by hand. <11.67-23.27> the operator screw [philips screw 8] into [gear plate hol... | After the worm gear is placed into the box, the operator screws a philips screw and two shafts into the gear plate holes by hand. | [Exhaustive Evidence List] <8.07-11.60> the operator place [worm gear 7] into [box 3] by hand. <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand. <23.33-35.20> the operator screw [shaft 10 10] into [gear plate hole 1 5] by hand. <66.93-69.60> the operator screw [shaft 9 9] into [gear... | {
"temporal": {
"<T1>": [
"8.07",
"11.60"
],
"<T2>": [
"11.67",
"23.27"
],
"<T3>": [
"23.33",
"35.20"
],
"<T4>": [
"66.93",
"69.60"
]
},
"spatial": {
"worm gear": "{7}",
"box": "{3}",
"philips screw": "{8}",
"gear plat... | Type 1: [Action Sequence] |
116 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | How many gear plate holes are processed throughout the assembly task? | [Direct Summary Answer] A total of 3 gear plate holes are processed during the assembly. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand. <23.33-35.20> the operator screw [shaft 10 10] into [gear plate hole 1 5] by hand. <66.93-69.60> the operator screw [... | A total of 3 gear plate holes are processed during the assembly. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 8] into [gear plate hole 3 4] by hand. <23.33-35.20> the operator screw [shaft 10 10] into [gear plate hole 1 5] by hand. <66.93-69.60> the operator screw [shaft 9 9] into [gear plate hole 2 6] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"66.93",
"69.60"
]
},
"spatial": {
"philips screw": "{8}",
"gear plate hole 3": "{4}",
"shaft 10": "{10}",
"gear plate hole 1": "{5}",
"shaft 9": "{... | Type 2:[Spatial Counting] |
117 | S04A05I01M0 | /NexusBench/video/assembly/S04A05I01M0.mp4 | How is the worm gear handled during the time interval from 1046 to 1191? | <69.67-79.33> the operator rotate [worm gear 7] by hand. | the operator rotate worm gear by hand. | <69.67-79.33> the operator rotate [worm gear 7] by hand. | {
"temporal": {
"<T1>": [
"69.67",
"79.33"
]
},
"spatial": {
"worm gear": "{7}"
}
} | Type 3:[Operation Manner] |
118 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What is the sequence of objects handled starting from the worm gear? | Following the worm gear, the operator processes the philips screw and then the shaft. <8.07-11.60> the operator place [worm gear 13] into [box 17] by hand, <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand, <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand... | Following the worm gear, the operator processes the philips screw and then the shaft. | <8.07-11.60> the operator place [worm gear 13] into [box 17] by hand, <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand, <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand. | {
"temporal": {
"<T1>": [
"8.07",
"11.60"
],
"<T2>": [
"11.67",
"23.27"
],
"<T3>": [
"23.33",
"35.20"
]
},
"spatial": {
"worm gear": "{13}",
"box": "{17}",
"philips screw": "{16}",
"gear plate hole": "{3}",
"shaft": "{3}",
"gear p... | Type 1: [Action Sequence] |
119 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How is the worm gear handled when it is moved into the box? | <8.07-11.60> the operator place [worm gear 13] into [box 17] by hand. | the operator place worm gear into box by hand. | <8.07-11.60> the operator place [worm gear 13] into [box 17] by hand. | {
"temporal": {
"<T1>": [
"8.07",
"11.60"
]
},
"spatial": {
"worm gear": "{13}",
"box": "{17}"
}
} | Type 3:[Operation Manner] |
120 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What object is processed immediately after the worm gear is handled? | The philips screw is handled immediately after the worm gear. <8.07-11.60> the operator place [worm gear 13] into [box 17] by hand, <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand. | The philips screw is handled immediately after the worm gear. | <8.07-11.60> the operator place [worm gear 13] into [box 17] by hand, <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand. | {
"temporal": {
"<T1>": [
"8.07",
"11.60"
],
"<T2>": [
"11.67",
"23.27"
]
},
"spatial": {
"worm gear": "{13}",
"box": "{17}",
"philips screw": "{16}",
"gear plate hole": "{3}"
}
} | Type 4:[Anchor Tracking] |
121 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What sequence of actions is performed on the shaft after the worm gear is handled? | Following the handling of the worm gear, the shaft is screwed into a gear plate hole and then serves as the target for a spacer insertion. <23.33-35.60> the operator screw [shaft 3] into [gear plate hole 1 14] by hand; <35.27-38.60> the operator insert [large spacer 7] into [shaft 3] by hand. | Following the handling of the worm gear, the shaft is screwed into a gear plate hole and then serves as the target for a spacer insertion. | <23.33-35.60> the operator screw [shaft 3] into [gear plate hole 1 14] by hand; <35.27-38.60> the operator insert [large spacer 7] into [shaft 3] by hand. | {
"temporal": {
"<T1>": [
"23.33",
"35.60"
],
"<T2>": [
"35.27",
"38.60"
]
},
"spatial": {
"shaft": "{3}",
"gear plate hole 1": "{14}",
"large spacer": "{7}"
}
} | Type 1: [Action Sequence] |
122 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How is the large spacer handled when it is processed with the shaft? | <35.27-38.60> the operator insert [large spacer 7] into [shaft 3] by hand. | the operator insert large spacer into shaft by hand. | <35.27-38.60> the operator insert [large spacer 7] into [shaft 3] by hand. | {
"temporal": {
"<T1>": [
"35.27",
"38.60"
]
},
"spatial": {
"large spacer": "{7}",
"shaft": "{3}"
}
} | Type 3:[Operation Manner] |
123 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How many gear plate holes are processed during the assembly? | A total of 3 gear plate holes are processed. <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand, <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand, and <52.00-56.93> the operator screw [shaft 4] into [gear plate hole 2 15] by hand. | A total of 2 gear plate holes are processed. | <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand; <23.33-35.60> the operator screw [shaft 3] into [gear plate hole 1 14] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"52.00",
"56.93"
]
},
"spatial": {
"philips screw": "{16}",
"gear plate hole": "{3}",
"shaft": "{3, 4}",
"gear plate hole 1": "{14}",
"gear plate ho... | Type 2:[Spatial Counting] |
124 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What is the next object processed after the philips screw is handled? | <23.33-35.60> the operator screw [shaft 3] into [gear plate hole 1 14] by hand. | the operator screw shaft into gear plate hole 1 by hand. | <23.33-35.60> the operator screw [shaft 3] into [gear plate hole 1 14] by hand. | {
"temporal": {
"<T1>": [
"23.33",
"35.60"
]
},
"spatial": {
"shaft": "{3}",
"gear plate hole 1": "{14}"
}
} | Type 4:[Anchor Tracking] |
125 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What is the sequence of actions performed to handle the components on the shaft after it has been processed into the gear plate hole? | Following the shaft installation, the operator inserts a large gear, then a small spacer, and finally screws a nut onto the shaft. <38.67-42.53> the operator insert [large gear 5] onto [shaft 3] by hand, <42.60-45.27> the operator insert [small spacer 9] onto [shaft 3] by hand, and <45.87-51.93> the operator screw [nut... | Following the shaft installation, the operator inserts a large gear, then a small spacer, and finally screws a nut onto the shaft. | <38.67-42.53> the operator insert [large gear 5] onto [shaft 3] by hand, <42.60-45.27> the operator insert [small spacer 9] onto [shaft 3] by hand, and <45.87-51.93> the operator screw [nut 11] onto [shaft 3] by hand. | {
"temporal": {
"<T1>": [
"38.67",
"42.53"
],
"<T2>": [
"42.60",
"45.27"
],
"<T3>": [
"45.87",
"51.93"
]
},
"spatial": {
"large gear": "{5}",
"shaft": "{3}",
"small spacer": "{9}",
"nut": "{11}"
}
} | Type 1: [Action Sequence] |
126 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How many components are processed and attached to the shaft after it is secured to the gear plate? | There are 3 components attached to the shaft in the subsequent steps. <38.67-42.53> the operator insert [large gear 5] onto [shaft 3] by hand, <42.60-45.27> the operator insert [small spacer 9] onto [shaft 3] by hand, and <45.87-51.93> the operator screw [nut 11] onto [shaft 3] by hand. | There are 3 components attached to the shaft in the subsequent steps. | <38.67-42.53> the operator insert [large gear 5] onto [shaft 3] by hand, <42.60-45.27> the operator insert [small spacer 9] onto [shaft 3] by hand, and <45.87-51.93> the operator screw [nut 11] onto [shaft 3] by hand. | {
"temporal": {
"<T1>": [
"38.67",
"42.53"
],
"<T2>": [
"42.60",
"45.27"
],
"<T3>": [
"45.87",
"51.93"
]
},
"spatial": {
"large gear": "{5}",
"shaft": "{3}",
"small spacer": "{9}",
"nut": "{11}"
}
} | Type 2:[Spatial Counting] |
127 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How does the operator process the components that are added to the shaft after its initial attachment? | The components are assembled onto the shaft by hand without using any tools. <38.67-42.53> the operator insert [large gear 5] onto [shaft 3] by hand, <42.60-45.27> the operator insert [small spacer 9] onto [shaft 3] by hand, and <45.87-51.93> the operator screw [nut 11] onto [shaft 3] by hand. | The components are assembled onto the shaft by hand without using any tools. | <38.67-42.53> the operator insert [large gear 5] onto [shaft 3] by hand, <42.60-45.27> the operator insert [small spacer 9] onto [shaft 3] by hand, and <45.87-51.93> the operator screw [nut 11] onto [shaft 3] by hand. | {
"temporal": {
"<T1>": [
"38.67",
"42.53"
],
"<T2>": [
"42.60",
"45.27"
],
"<T3>": [
"45.87",
"51.93"
]
},
"spatial": {
"large gear": "{5}",
"shaft": "{3}",
"small spacer": "{9}",
"nut": "{11}"
}
} | Type 3:[Operation Manner] |
128 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What action is performed immediately after the small spacer is handled on the shaft? | <45.87-51.93> the operator screw [nut 11] onto [shaft 3] by hand. | the operator screw nut onto shaft by hand. | <45.87-51.93> the operator screw [nut 11] onto [shaft 3] by hand. | {
"temporal": {
"<T1>": [
"45.87",
"51.93"
]
},
"spatial": {
"nut": "{11}",
"shaft": "{3}"
}
} | Type 4:[Anchor Tracking] |
129 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What is the sequence of actions performed on the gear plate holes after the worm gear is placed into the box? | [Direct Summary Answer] After the worm gear is placed, the operator screws a philips screw and then two shafts into the gear plate holes. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand, <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14... | After the worm gear is placed, the operator screws a philips screw and then two shafts into the gear plate holes. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand, <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand, and <52.00-56.93> the operator screw [shaft 4] into [gear plate hole 2 15] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"52.00",
"56.93"
]
},
"spatial": {
"philips screw": "{16}",
"gear plate hole": "{3}",
"shaft": "{3, 4}",
"gear plate hole 1": "{14}",
"gear plate ho... | Type 1: [Action Sequence] |
130 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How many gear plate holes are processed during the assembly? | [Direct Summary Answer] Three gear plate holes are processed during the assembly. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand, <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand, and <52.00-56.93> the operator screw [shaft 4... | Three gear plate holes are processed during the assembly. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand, <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand, and <52.00-56.93> the operator screw [shaft 4] into [gear plate hole 2 15] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"52.00",
"56.93"
]
},
"spatial": {
"philips screw": "{16}",
"gear plate hole": "{3}",
"shaft": "{3, 4}",
"gear plate hole 1": "{14}",
"gear plate ho... | Type 2:[Spatial Counting] |
131 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How are the components handled when being secured to the gear plate holes? | [Direct Summary Answer] All components, including the philips screw and the shafts, are screwed into the gear plate holes by hand. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand, <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by ha... | All components, including the philips screw and the shafts, are screwed into the gear plate holes by hand. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand, <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand, and <52.00-56.93> the operator screw [shaft 4] into [gear plate hole 2 15] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"52.00",
"56.93"
]
},
"spatial": {
"philips screw": "{16}",
"gear plate hole": "{3}",
"shaft": "{3, 4}",
"gear plate hole 1": "{14}",
"gear plate ho... | Type 3:[Operation Manner] |
132 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What is the sequence of components processed in the gear plate holes? | [Direct Summary Answer] The operator screws a philips screw and then two shafts into the gear plate holes. [Exhaustive Evidence] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand; <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1] by hand; <57.00-61.40> the operator s... | The operator screws a philips screw and then two shafts into the gear plate holes. | [Exhaustive Evidence] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand; <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1] by hand; <57.00-61.40> the operator screw [shaft 4] into [gear plate hole 2] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"57.00",
"61.40"
]
},
"spatial": {
"philips screw": "{16}",
"gear plate hole": "{1, 2, 3}",
"shaft": "{3, 4}"
}
} | Type 1: [Action Sequence] |
133 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What does the operator do while the small gear is being handled? | <57.00-58.93> the operator insert [small gear 6] onto [shaft 4] by hand while the operator screw [shaft 4] into [gear plate hole 2] by hand. | the operator insert small gear onto shaft by hand while the operator screw shaft into gear plate hole by hand. | <57.00-58.93> the operator insert [small gear 6] onto [shaft 4] by hand while the operator screw [shaft 4] into [gear plate hole 2] by hand. | {
"temporal": {
"<T1>": [
"57.00",
"58.93"
]
},
"spatial": {
"small gear": "{6}",
"shaft": "{4}",
"gear plate hole": "{2}"
}
} | Type 4:[Anchor Tracking] |
134 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How many gear plate holes are processed by the operator during the assembly? | [Direct Summary Answer] Three gear plate holes are processed. [Exhaustive Evidence] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand; <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1] by hand; <57.00-61.40> the operator screw [shaft 4] into [gear plate hole 2] by ha... | Three gear plate holes are processed. | [Exhaustive Evidence] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand; <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1] by hand; <57.00-61.40> the operator screw [shaft 4] into [gear plate hole 2] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"57.00",
"61.40"
]
},
"spatial": {
"philips screw": "{16}",
"gear plate hole": "{1, 2, 3}",
"shaft": "{3, 4}"
}
} | Type 2:[Spatial Counting] |
135 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What is the chronological sequence of actions performed on the gear plate holes throughout the assembly? | [Direct Summary] The operator screws different components into three gear plate holes in a specific order. [Exhaustive Evidence] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand; <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand; <61.47-66.87> the operato... | The operator screws different components into three gear plate holes in a specific order. | [Exhaustive Evidence] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand; <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand; <61.47-66.87> the operator screw [shaft 4] into [gear plate hole 2 15] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"61.47",
"66.87"
]
},
"spatial": {
"philips screw": "{16}",
"gear plate hole": "{3}",
"shaft": "{3, 4}",
"gear plate hole 1": "{14}",
"gear plate ho... | Type 1: [Action Sequence] |
136 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How are the shafts handled during the assembly process? | [Direct Summary] Two shafts are screwed into gear plate holes by hand. [Exhaustive Evidence] <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand; <61.47-66.87> the operator screw [shaft 4] into [gear plate hole 2 15] by hand. | Two shafts are screwed into gear plate holes by hand. | [Exhaustive Evidence] <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand; <61.47-66.87> the operator screw [shaft 4] into [gear plate hole 2 15] by hand. | {
"temporal": {
"<T1>": [
"23.33",
"35.20"
],
"<T2>": [
"61.47",
"66.87"
]
},
"spatial": {
"shaft": "{3, 4}",
"gear plate hole 1": "{14}",
"gear plate hole 2": "{15}"
}
} | Type 3:[Operation Manner] |
137 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What action is performed simultaneously while the operator handles the final shaft? | While the operator is screwing the final shaft into a gear plate hole, they also screw a nut onto it. <61.47-66.07> the operator screw [nut 12] onto [shaft 4] by hand. | While the operator is screwing the final shaft into a gear plate hole, they also screw a nut onto it. | <61.47-66.07> the operator screw [nut 12] onto [shaft 4] by hand. | {
"temporal": {
"<T1>": [
"61.47",
"66.07"
]
},
"spatial": {
"nut": "{12}",
"shaft": "{4}"
}
} | Type 4:[Anchor Tracking] |
138 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How many gear plate holes are processed during the assembly? | [Direct Summary] A total of 3 gear plate holes are processed. [Exhaustive Evidence] [gear plate hole 3] is processed at <11.67-23.27>; [gear plate hole 1 14] is processed at <23.33-35.20>; [gear plate hole 2 15] is processed at <61.47-66.87>. | A total of 3 gear plate holes are processed. | [Exhaustive Evidence] [gear plate hole 3] is processed at <11.67-23.27>; [gear plate hole 1 14] is processed at <23.33-35.20>; [gear plate hole 2 15] is processed at <61.47-66.87>. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"61.47",
"66.87"
]
},
"spatial": {
"gear plate hole": "{3}",
"gear plate hole 1": "{14}",
"gear plate hole 2": "{15}"
}
} | Type 2:[Spatial Counting] |
139 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What happens after the worm gear is moved into the box? | After the worm gear is placed into the box, the operator proceeds to screw a philips screw into one of the gear plate holes. <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand. | After the worm gear is placed into the box, the operator proceeds to screw a philips screw into one of the gear plate holes. | <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
]
},
"spatial": {
"philips screw": "{16}",
"gear plate hole": "{3}"
}
} | Type 1: [Action Sequence] |
140 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What is the chronological sequence of tasks performed on the gear plate holes after the worm gear is processed? | [Direct Summary Answer] After the worm gear is processed, the operator screws a philips screw and the shafts into the gear plate holes by hand. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand; <23.33-35.20> the operator screw [shaft 3] into [gear plate hol... | After the worm gear is processed, the operator screws a philips screw and the shafts into the gear plate holes by hand. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand; <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand; <66.93-69.60> the operator screw [shaft 4] into [gear plate hole 2 15] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"66.93",
"69.60"
]
},
"spatial": {
"philips screw": "{16}",
"gear plate hole": "{3}",
"shaft": "{3, 4}",
"gear plate hole 1": "{14}",
"gear plate ho... | Type 1: [Action Sequence] |
141 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How are the shafts handled while being processed with the gear plate holes? | [Direct Summary Answer] The shafts are screwed into the gear plate holes by hand. [Exhaustive Evidence List] <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand; <66.93-69.60> the operator screw [shaft 4] into [gear plate hole 2 15] by hand. | The shafts are screwed into the gear plate holes by hand. | [Exhaustive Evidence List] <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand; <66.93-69.60> the operator screw [shaft 4] into [gear plate hole 2 15] by hand. | {
"temporal": {
"<T1>": [
"23.33",
"35.20"
],
"<T2>": [
"66.93",
"69.60"
]
},
"spatial": {
"shaft": "{3, 4}",
"gear plate hole 1": "{14}",
"gear plate hole 2": "{15}"
}
} | Type 3:[Operation Manner] |
142 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How many gear plate holes are interacted with throughout the assembly? | [Direct Summary Answer] A total of 3 gear plate holes are processed. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand; <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand; <66.93-69.60> the operator screw [shaft 4] into [gear plat... | A total of 3 gear plate holes are processed. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 16] into [gear plate hole 3] by hand; <23.33-35.20> the operator screw [shaft 3] into [gear plate hole 1 14] by hand; <66.93-69.60> the operator screw [shaft 4] into [gear plate hole 2 15] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"66.93",
"69.60"
]
},
"spatial": {
"philips screw": "{16}",
"gear plate hole": "{3}",
"shaft": "{3, 4}",
"gear plate hole 1": "{14}",
"gear plate ho... | Type 2:[Spatial Counting] |
143 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | What is the sequence of actions performed on the worm gear throughout the assembly process? | [Direct Summary Answer] The worm gear is first placed into the box and then later rotated. [Exhaustive Evidence List] <8.07-11.60> the operator place [worm gear 13] into [box 17] by hand; <69.67-79.33> the operator rotate [worm gear 13] by hand. | The worm gear is first placed into the box and then later rotated. | [Exhaustive Evidence List] <8.07-11.60> the operator place [worm gear 13] into [box 17] by hand; <69.67-79.33> the operator rotate [worm gear 13] by hand. | {
"temporal": {
"<T1>": [
"8.07",
"11.60"
],
"<T2>": [
"69.67",
"79.33"
]
},
"spatial": {
"worm gear": "{13}",
"box": "{17}"
}
} | Type 1: [Action Sequence] |
144 | S04A05I01S1 | /NexusBench/video/assembly/S04A05I01S1.mp4 | How is the worm gear handled after the shaft is processed? | <69.67-79.33> the operator rotate [worm gear 13] by hand. | the operator rotate worm gear by hand. | <69.67-79.33> the operator rotate [worm gear 13] by hand. | {
"temporal": {
"<T1>": [
"69.67",
"79.33"
]
},
"spatial": {
"worm gear": "{13}"
}
} | Type 4:[Anchor Tracking] |
145 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What sequence of actions follows the movement of the worm gear into the box? | After the worm gear is placed, the operator screws a philips screw into a gear plate hole, followed by screwing a shaft into another gear plate hole. <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand. | After the worm gear is placed, the operator screws a philips screw into a gear plate hole, followed by screwing a shaft into another gear plate hole. | <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}",
"shaft": "{6}",
"gear plate hole 1": "{16}"
}
} | Type 1: [Action Sequence] |
146 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How is the worm gear handled when it is positioned in the box? | <8.07-11.60> the operator place [worm gear 4] into [box 3] by hand. | the operator place worm gear into box by hand. | <8.07-11.60> the operator place [worm gear 4] into [box 3] by hand. | {
"temporal": {
"<T1>": [
"8.07",
"11.60"
]
},
"spatial": {
"worm gear": "{4}",
"box": "{3}"
}
} | Type 3:[Operation Manner] |
147 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | Identify the part handled immediately after the worm gear is processed. | <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand. | the operator screw philips screw into gear plate hole 3 by hand. | <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}"
}
} | Type 4:[Anchor Tracking] |
148 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What is the complete sequence of objects processed by the operator throughout the assembly? | The operator first handles the worm gear and box, then the philips screw and a gear plate hole, followed by the shaft and another gear plate hole, and finally the large spacer. <8.07-11.60> the operator place [worm gear 4] into [box 3] by hand, <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 ... | The operator first handles the worm gear and box, then the philips screw and a gear plate hole, followed by the shaft and another gear plate hole, and finally the large spacer. | <8.07-11.60> the operator place [worm gear 4] into [box 3] by hand, <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.60> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <35.27-38.60> the operator insert [large spacer 8] into [shaft 6] by hand. | {
"temporal": {
"<T1>": [
"8.07",
"11.60"
],
"<T2>": [
"11.67",
"23.27"
],
"<T3>": [
"23.33",
"35.60"
],
"<T4>": [
"35.27",
"38.60"
]
},
"spatial": {
"worm gear": "{4}",
"box": "{3}",
"philips screw": "{5}",
"gear plat... | Type 1: [Action Sequence] |
149 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | Which object is processed at the same time the operator is finishing the work on the shaft? | The large spacer is processed simultaneously as the operator finishes the work on the shaft. <35.27-35.60> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <35.27-35.60> the operator insert [large spacer 8] into [shaft 6] by hand. | The large spacer is processed simultaneously as the operator finishes the work on the shaft. | <35.27-35.60> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <35.27-35.60> the operator insert [large spacer 8] into [shaft 6] by hand. | {
"temporal": {
"<T1>": [
"35.27",
"35.60"
],
"<T2>": [
"35.27",
"35.60"
]
},
"spatial": {
"shaft": "{6}",
"gear plate hole 1": "{16}",
"large spacer": "{8}"
}
} | Type 5:[Comparative Reasoning] |
150 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How many gear plate holes are processed during the assembly? | A total of 3 gear plate holes are processed. <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <57.00-58.93> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | A total of two gear plate holes are processed. | <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.60> the operator screw [shaft 6] into [gear plate hole 1 16] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"57.00",
"58.93"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}",
"shaft": "{6, 7}",
"gear plate hole 1": "{16}",
"gear plate ... | Type 2:[Spatial Counting] |
151 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What is the sequence of components processed on the shaft after it is screwed into the gear plate hole? | After the shaft is secured, a large gear and a small spacer are inserted onto it, followed by a nut being screwed on. <38.67-42.53> the operator insert [large gear 10] onto [shaft 6] by hand, <42.60-45.27> the operator insert [small spacer 12] onto [shaft 6] by hand, and <45.87-51.93> the operator screw [nut 14] onto [... | After the shaft is secured, a large gear and a small spacer are inserted onto it, followed by a nut being screwed on. | <38.67-42.53> the operator insert [large gear 10] onto [shaft 6] by hand, <42.60-45.27> the operator insert [small spacer 12] onto [shaft 6] by hand, and <45.87-51.93> the operator screw [nut 14] onto [shaft 6] by hand. | {
"temporal": {
"<T1>": [
"38.67",
"42.53"
],
"<T2>": [
"42.60",
"45.27"
],
"<T3>": [
"45.87",
"51.93"
]
},
"spatial": {
"large gear": "{10}",
"shaft": "{6}",
"small spacer": "{12}",
"nut": "{14}"
}
} | Type 1: [Action Sequence] |
152 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How are the large gear, small spacer, and nut handled as they are moved onto the shaft? | The large gear, small spacer, and nut are all processed onto the shaft by hand without the use of tools. <38.67-42.53> the operator insert [large gear 10] onto [shaft 6] by hand, <42.60-45.27> the operator insert [small spacer 12] onto [shaft 6] by hand, and <45.87-51.93> the operator screw [nut 14] onto [shaft 6] by h... | The large gear, small spacer, and nut are all processed onto the shaft by hand without the use of tools. | <38.67-42.53> the operator insert [large gear 10] onto [shaft 6] by hand, <42.60-45.27> the operator insert [small spacer 12] onto [shaft 6] by hand, and <45.87-51.93> the operator screw [nut 14] onto [shaft 6] by hand. | {
"temporal": {
"<T1>": [
"38.67",
"42.53"
],
"<T2>": [
"42.60",
"45.27"
],
"<T3>": [
"45.87",
"51.93"
]
},
"spatial": {
"large gear": "{10}",
"shaft": "{6}",
"small spacer": "{12}",
"nut": "{14}"
}
} | Type 3:[Operation Manner] |
153 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What assembly steps occur in the video after the philips screw is processed? | Following the processing of the philips screw, a shaft is screwed into a gear plate hole, then a large gear and small spacer are inserted onto that shaft, and finally a nut is screwed on. <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <38.67-42.53> the operator insert [large gear 10] on... | Following the processing of the philips screw, a shaft is screwed into a gear plate hole, then a large gear and small spacer are inserted onto that shaft, and finally a nut is screwed on. | <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <38.67-42.53> the operator insert [large gear 10] onto [shaft 6] by hand, <42.60-45.27> the operator insert [small spacer 12] onto [shaft 6] by hand, and <45.87-51.93> the operator screw [nut 14] onto [shaft 6] by hand. | {
"temporal": {
"<T1>": [
"23.33",
"35.20"
],
"<T2>": [
"38.67",
"42.53"
],
"<T3>": [
"42.60",
"45.27"
],
"<T4>": [
"45.87",
"51.93"
]
},
"spatial": {
"shaft": "{6}",
"gear plate hole 1": "{16}",
"large gear": "{10}",
... | Type 1: [Action Sequence] |
154 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What is the sequence of actions performed on the gear plate holes after the worm gear is moved? | After the worm gear is placed into the box, the operator screws a philips screw and then two shafts into the gear plate holes. <8.07-11.60> the operator place [worm gear 4] into [box 3] by hand; <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-51.93> the operator screw [sha... | After the worm gear is placed into the box, the operator screws a philips screw and then two shafts into the gear plate holes. | <8.07-11.60> the operator place [worm gear 4] into [box 3] by hand; <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-51.93> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <52.00-56.93> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | {
"temporal": {
"<T1>": [
"8.07",
"11.60"
],
"<T2>": [
"11.67",
"23.27"
],
"<T3>": [
"23.33",
"51.93"
],
"<T4>": [
"52.00",
"56.93"
]
},
"spatial": {
"worm gear": "{4}",
"box": "{3}",
"philips screw": "{5}",
"gear plat... | Type 1: [Action Sequence] |
155 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How are the gear plate holes handled by the operator throughout the assembly process? | The gear plate holes are processed by the operator screwing various components into them by hand. <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-51.93> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <52.00-56.93> the operator screw [shaft 7] into [gear ... | The gear plate holes are processed by the operator screwing various components into them by hand. | <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-51.93> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <52.00-56.93> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"51.93"
],
"<T3>": [
"52.00",
"56.93"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}",
"shaft": "{6, 7}",
"gear plate hole 1": "{16}",
"gear plate ... | Type 3:[Operation Manner] |
156 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How many gear plate holes are interacted with in total during the video? | A total of 3 gear plate holes are interacted with. [gear plate hole 3 18] is processed from <11.67-23.27>; [gear plate hole 1 16] is processed from <23.33-51.93>; [gear plate hole 2 17] is processed from <52.00-56.93>. | A total of 3 gear plate holes are interacted with. | [gear plate hole 3 18] is processed from <11.67-23.27>; [gear plate hole 1 16] is processed from <23.33-51.93>; [gear plate hole 2 17] is processed from <52.00-56.93>. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"51.93"
],
"<T3>": [
"52.00",
"56.93"
]
},
"spatial": {
"gear plate hole 3": "{18}",
"gear plate hole 1": "{16}",
"gear plate hole 2": "{17}"
}
} | Type 2:[Spatial Counting] |
157 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What is the sequence of actions performed to process the gear plate holes? | [Direct Summary] The operator screws components into the gear plate holes in a specific chronological sequence. [Exhaustive Evidence] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <57.00-58.93> the ... | The operator screws components into the gear plate holes in a specific chronological sequence. | [Exhaustive Evidence] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <57.00-58.93> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"57.00",
"58.93"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}",
"shaft": "{6, 7}",
"gear plate hole 1": "{16}",
"gear plate ... | Type 1: [Action Sequence] |
158 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What action is performed with the left hand while the small gear is being handled? | <57.00-58.93> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | the operator screw shaft into gear plate hole 2 by hand. | <57.00-58.93> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | {
"temporal": {
"<T1>": [
"57.00",
"58.93"
]
},
"spatial": {
"shaft": "{7}",
"gear plate hole 2": "{17}"
}
} | Type 4:[Anchor Tracking] |
159 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How many gear plate holes are interacted with throughout the assembly task? | [Direct Summary] A total of 3 gear plate holes are interacted with. [Exhaustive Evidence] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <57.00-58.93> the operator screw [shaft 7] into [gear plate ho... | A total of 3 gear plate holes are interacted with. | [Exhaustive Evidence] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <57.00-58.93> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"57.00",
"58.93"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}",
"shaft": "{6, 7}",
"gear plate hole 1": "{16}",
"gear plate ... | Type 2:[Spatial Counting] |
160 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How are the gear plate holes processed during the assembly? | [Direct Summary] The gear plate holes are processed by screwing components into them by hand. [Exhaustive Evidence] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <57.00-58.93> the operator screw [sh... | The gear plate holes are processed by screwing components into them by hand. | [Exhaustive Evidence] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <57.00-58.93> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"57.00",
"58.93"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}",
"shaft": "{6, 7}",
"gear plate hole 1": "{16}",
"gear plate ... | Type 3:[Operation Manner] |
161 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What is the chronological sequence of actions involving the gear plate holes? | The operator handles the gear plate holes by screwing in a philips screw, followed by two different shafts. <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <59.00-66.07> the operator screw [shaft 7] i... | The operator handles the gear plate holes by screwing in a philips screw, followed by two different shafts. | <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <59.00-66.07> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"59.00",
"66.07"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}",
"shaft": "{6, 7}",
"gear plate hole 1": "{16}",
"gear plate ... | Type 1: [Action Sequence] |
162 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How are the shafts handled throughout the video? | The shafts are screwed into gear plate holes by hand, with one shaft also having a small spacer inserted into it. <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <59.00-61.40> the operator insert [small spacer 13] into [shaft 7] by hand; <59.00-66.07> the operator screw [shaft 7] into [g... | The shafts are screwed into gear plate holes by hand, with one shaft also having a small spacer inserted into it. | <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <59.00-61.40> the operator insert [small spacer 13] into [shaft 7] by hand; <59.00-66.07> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | {
"temporal": {
"<T1>": [
"23.33",
"35.20"
],
"<T2>": [
"59.00",
"61.40"
],
"<T3>": [
"59.00",
"66.07"
]
},
"spatial": {
"shaft": "{6, 7}",
"gear plate hole 1": "{16}",
"small spacer": "{13}",
"gear plate hole 2": "{17}"
}
} | Type 3:[Operation Manner] |
163 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How many gear plate holes are utilized to secure parts in this assembly? | Three gear plate holes are utilized to secure components. <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <59.00-66.07> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | Three gear plate holes are utilized to secure components. | <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <59.00-66.07> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"59.00",
"66.07"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}",
"shaft": "{6, 7}",
"gear plate hole 1": "{16}",
"gear plate ... | Type 2:[Spatial Counting] |
164 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What action is performed with the small spacer while the operator handles the shaft? | <59.00-61.40> the operator insert [small spacer 13] into [shaft 7] by hand. | the operator insert small spacer into shaft by hand. | <59.00-61.40> the operator insert [small spacer 13] into [shaft 7] by hand. | {
"temporal": {
"<T1>": [
"59.00",
"61.40"
]
},
"spatial": {
"small spacer": "{13}",
"shaft": "{7}"
}
} | Type 4:[Anchor Tracking] |
165 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What is the chronological sequence of actions performed on the gear plate holes throughout the video? | [Direct Summary] The operator screws a philips screw and two shafts into three different gear plate holes by hand. [Exhaustive List] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, and <66.13-68.80> t... | The operator screws a philips screw and two shafts into three different gear plate holes by hand. | [Exhaustive List] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, and <66.13-68.80> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"66.13",
"68.80"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}",
"shaft": "{6, 7}",
"gear plate hole 1": "{16}",
"gear plate ... | Type 1: [Action Sequence] |
166 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How many gear plate holes are processed during the assembly task? | [Direct Summary] A total of 3 gear plate holes are processed. [Exhaustive List] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, and <66.13-68.80> the operator screw [shaft 7] into [gear plate hole 2 1... | A total of 3 gear plate holes are processed. | [Exhaustive List] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, and <66.13-68.80> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"66.13",
"68.80"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}",
"shaft": "{6, 7}",
"gear plate hole 1": "{16}",
"gear plate ... | Type 2:[Spatial Counting] |
167 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How are the shafts handled when they are being processed into the gear plate holes? | [Direct Summary] Both shafts are screwed into their respective gear plate holes by hand. [Exhaustive List] <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, and <66.13-68.80> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | Both shafts are screwed into their respective gear plate holes by hand. | [Exhaustive List] <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, and <66.13-68.80> the operator screw [shaft 7] into [gear plate hole 2 17] by hand. | {
"temporal": {
"<T1>": [
"23.33",
"35.20"
],
"<T2>": [
"66.13",
"68.80"
]
},
"spatial": {
"shaft": "{6, 7}",
"gear plate hole 1": "{16}",
"gear plate hole 2": "{17}"
}
} | Type 3:[Operation Manner] |
168 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What action is performed immediately after the worm gear is handled? | <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand. | the operator screw philips screw into gear plate hole 3 by hand. | <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand. | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}"
}
} | Type 4:[Anchor Tracking] |
169 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How many gear plate holes are processed in total during the assembly? | [Direct Summary Answer] 3 gear plate holes are processed. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand, <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand, <57.00-58.93> the operator screw [shaft 7] into [gear plate hole 2 ... | 4 gear plate holes are processed. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <35.27-46.60> the operator screw [shaft 7] into [gear plate hole 2 17] by hand; <46.67-57.93> the operator screw [philips scr... | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"57.00",
"58.93"
]
},
"spatial": {
"philips screw": "{5}",
"gear plate hole 3": "{18}",
"shaft": "{6, 7}",
"gear plate hole 1": "{16}",
"gear plate ... | Type 2:[Spatial Counting] |
170 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What is the sequence of philips screws and shafts handled in relation to the gear plate holes? | [Direct Summary Answer] The operator first screws a philips screw, followed by two shafts, then another philips screw, and finally screws one of the shafts again. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-35.20> the operator screw [shaft 6]... | The operator first screws a philips screw, followed by two shafts, then another philips screw, and finally screws one of the shafts again. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <35.27-46.60> the operator screw [shaft 7] into [gear plate hole 2 17] by hand; <46.67-57.93> the operator screw [philips scr... | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"35.27",
"46.60"
],
"<T4>": [
"46.67",
"57.93"
],
"<T5>": [
"68.87",
"69.60"
]
},
"spatial": {
"philips screw": "{5, 8}",
... | Type 1: [Action Sequence] |
171 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | How are the gear plate holes handled by the operator throughout the video? | [Direct Summary Answer] The operator screws components into the gear plate holes by hand without the use of tools. [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <35.27-46.... | The operator screws components into the gear plate holes by hand without the use of tools. | [Exhaustive Evidence List] <11.67-23.27> the operator screw [philips screw 5] into [gear plate hole 3 18] by hand; <23.33-35.20> the operator screw [shaft 6] into [gear plate hole 1 16] by hand; <35.27-46.60> the operator screw [shaft 7] into [gear plate hole 2 17] by hand; <46.67-57.93> the operator screw [philips scr... | {
"temporal": {
"<T1>": [
"11.67",
"23.27"
],
"<T2>": [
"23.33",
"35.20"
],
"<T3>": [
"35.27",
"46.60"
],
"<T4>": [
"46.67",
"57.93"
],
"<T5>": [
"68.87",
"69.60"
]
},
"spatial": {
"philips screw": "{5, 8}",
... | Type 3:[Operation Manner] |
172 | S04A05I01S2 | /NexusBench/video/assembly/S04A05I01S2.mp4 | What action is performed on the worm gear at the same time the operator handles the gear plate holes for the final time? | <68.87-79.33> the operator rotate [worm gear 4] by hand. | the operator rotate worm gear by hand. | <68.87-79.33> the operator rotate [worm gear 4] by hand. | {
"temporal": {
"<T1>": [
"68.87",
"79.33"
]
},
"spatial": {
"worm gear": "{4}"
}
} | Type 5:[Comparative Reasoning] |
173 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | What sequence of actions is performed after the operator rotates the dial? | Following the rotation of the dial, the operator inserts the components into the general plate holes and ports, and then screws a nut onto a stud. <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand. <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand. <14.40-17.07... | Following the rotation of the dial, the operator inserts the components into the general plate holes and ports, and then screws a nut onto a stud. | <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand. <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand. <14.40-17.07> the operator insert [usb male 8] into [general plate usb female 5] by hand. <17.13-17.33> the operator screw [nut 10] onto [general plate stud 13... | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"14.40",
"17.07"
],
"<T4>": [
"17.13",
"17.33"
]
},
"spatial": {
"bar": "{6}",
"general plate hole 2": "{4}",
"rod": "{7}",
"general ... | Type 1: [Action Sequence] |
174 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | How many components are processed during the insertion stage into the general plate holes and ports? | A total of three components are inserted into the general plate. <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand. <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand. <14.40-17.07> the operator insert [usb male 8] into [general plate usb female 5] by hand. | A total of three components are inserted into the general plate. | <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand. <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand. <14.40-17.07> the operator insert [usb male 8] into [general plate usb female 5] by hand. | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"14.40",
"17.07"
]
},
"spatial": {
"bar": "{6}",
"general plate hole 2": "{4}",
"rod": "{7}",
"general plate hole 1": "{3}",
"usb male": "{8}",
"... | Type 2:[Spatial Counting] |
175 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | How are the components handled when they are inserted into the general plate holes and ports? | The operator inserts the components into the general plate holes and ports by hand. <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand. <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand. <14.40-17.07> the operator insert [usb male 8] into [general plate usb fema... | The operator inserts the components into the general plate holes and ports by hand. | <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand. <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand. <14.40-17.07> the operator insert [usb male 8] into [general plate usb female 5] by hand. | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"14.40",
"17.07"
]
},
"spatial": {
"bar": "{6}",
"general plate hole 2": "{4}",
"rod": "{7}",
"general plate hole 1": "{3}",
"usb male": "{8}",
"... | Type 3:[Operation Manner] |
176 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | Which objects are manipulated before the operator begins inserting the components into the general plate? | Before the operator begins inserting the components, the quarter-turn handle and the dial are rotated. <6.33-7.40> the operator rotate [quarter-turn handle 15] by hand. <7.47-9.80> the operator rotate [dial 14] by hand. | Before the operator begins inserting the components, the quarter-turn handle and the dial are rotated. | <6.33-7.40> the operator rotate [quarter-turn handle 15] by hand. <7.47-9.80> the operator rotate [dial 14] by hand. | {
"temporal": {
"<T1>": [
"6.33",
"7.40"
],
"<T2>": [
"7.47",
"9.80"
]
},
"spatial": {
"quarter-turn handle": "{15}",
"dial": "{14}"
}
} | Type 4:[Anchor Tracking] |
177 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | What is the sequence of actions performed after the dial is handled? | After the dial is handled, the operator inserts the bar, the rod, and the usb male, and then screws the nut onto the general plate stud. <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand ... <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand ... <14.40-17.07> th... | After the dial is handled, the operator inserts the bar, the rod, and the usb male, and then screws the nut onto the general plate stud. | <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand ... <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand ... <14.40-17.07> the operator insert [usb male 8] into [general plate usb female 5] by hand ... <17.13-26.47> the operator screw [nut 10] onto [general plat... | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"14.40",
"17.07"
],
"<T4>": [
"17.13",
"26.47"
]
},
"spatial": {
"bar": "{6}",
"general plate hole 2": "{4}",
"rod": "{7}",
"general ... | Type 1: [Action Sequence] |
178 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | What is the sequence of actions performed before the nut is handled? | Before the nut is handled, the operator rotates the quarter-turn handle, rotates the dial, and inserts the bar, rod, and usb male. <6.33-7.40> the operator rotate [quarter-turn handle 15] by hand ... <7.47-9.80> the operator rotate [dial 14] by hand ... <9.87-12.53> the operator insert [bar 6] into [general plate hole ... | Before the nut is handled, the operator rotates the quarter-turn handle, rotates the dial, and inserts the bar, rod, and usb male. | <6.33-7.40> the operator rotate [quarter-turn handle 15] by hand ... <7.47-9.80> the operator rotate [dial 14] by hand ... <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand ... <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand ... <14.40-17.07> the operator ins... | {
"temporal": {
"<T1>": [
"6.33",
"7.40"
],
"<T2>": [
"7.47",
"9.80"
],
"<T3>": [
"9.87",
"12.53"
],
"<T4>": [
"12.60",
"14.33"
],
"<T5>": [
"14.40",
"17.07"
]
},
"spatial": {
"quarter-turn handle": "{15}",
... | Type 4:[Anchor Tracking] |
179 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | How many components are handled before the nut is processed? | Five components are handled before the nut is processed. <6.33-7.40> the operator rotate [quarter-turn handle 15] by hand ... <7.47-9.80> the operator rotate [dial 14] by hand ... <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand ... <12.60-14.33> the operator insert [rod 7] into [general p... | Five components are handled before the nut is processed. | <6.33-7.40> the operator rotate [quarter-turn handle 15] by hand ... <7.47-9.80> the operator rotate [dial 14] by hand ... <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand ... <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand ... <14.40-17.07> the operator ins... | {
"temporal": {
"<T1>": [
"6.33",
"7.40"
],
"<T2>": [
"7.47",
"9.80"
],
"<T3>": [
"9.87",
"12.53"
],
"<T4>": [
"12.60",
"14.33"
],
"<T5>": [
"14.40",
"17.07"
]
},
"spatial": {
"quarter-turn handle": "{15}",
... | Type 2:[Spatial Counting] |
180 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | How is the nut processed once it is placed on the general plate stud? | <17.13-26.47> the operator screw [nut 10] onto [general plate stud 13] by hand. | the operator screw nut onto general plate stud by hand. | <17.13-26.47> the operator screw [nut 10] onto [general plate stud 13] by hand. | {
"temporal": {
"<T1>": [
"17.13",
"26.47"
]
},
"spatial": {
"nut": "{10}",
"general plate stud": "{13}"
}
} | Type 3:[Operation Manner] |
181 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | What is the sequence of components processed using the general plate holes? | The operator inserts a bar, followed by a rod, and finally a bolt into the general plate holes. <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand, <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand, and <26.53-28.87> the operator insert [bolt 9] into [general pl... | The operator inserts a bar, followed by a rod, and finally a bolt into the general plate holes. | <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand, <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand, and <26.53-28.87> the operator insert [bolt 9] into [general plate hole 3 16] by hand. | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"26.53",
"28.87"
]
},
"spatial": {
"bar": "{6}",
"general plate hole 2": "{4}",
"rod": "{7}",
"general plate hole 1": "{3}",
"bolt": "{9}",
"gene... | Type 1: [Action Sequence] |
182 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | What action is performed by the left hand while the bolt is handled? | <17.33-28.87> the operator screw [nut 10] onto [general plate stud 13] by hand. | the operator screw nut onto general plate stud by hand. | <17.33-28.87> the operator screw [nut 10] onto [general plate stud 13] by hand. | {
"temporal": {
"<T1>": [
"17.33",
"28.87"
]
},
"spatial": {
"nut": "{10}",
"general plate stud": "{13}"
}
} | Type 4:[Anchor Tracking] |
183 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | How many general plate holes are processed throughout the video? | There are 3 general plate holes processed. <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand, <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand, and <26.53-28.87> the operator insert [bolt 9] into [general plate hole 3 16] by hand. | There are 3 general plate holes processed. | <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand, <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand, and <26.53-28.87> the operator insert [bolt 9] into [general plate hole 3 16] by hand. | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"26.53",
"28.87"
]
},
"spatial": {
"bar": "{6}",
"general plate hole 2": "{4}",
"rod": "{7}",
"general plate hole 1": "{3}",
"bolt": "{9}",
"gene... | Type 2:[Spatial Counting] |
184 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | In what order are the general plate holes processed during the assembly? | [Direct Summary Answer] The operator inserts a bar, a rod, and then a bolt into the general plate holes. [Exhaustive Evidence List] <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand, <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand, and <28.93-36.20> the opera... | The operator inserts a bar, a rod, and then a bolt into the general plate holes. | [Exhaustive Evidence List] <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand, <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand, and <28.93-36.20> the operator insert [bolt 9] into [general plate hole 3 16] by hand. | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"28.93",
"36.20"
]
},
"spatial": {
"bar": "{6}",
"general plate hole 2": "{4}",
"rod": "{7}",
"general plate hole 1": "{3}",
"bolt": "{9}",
"gene... | Type 1: [Action Sequence] |
185 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | How are the nuts handled after the usb male is processed? | [Direct Summary Answer] The nuts are screwed onto the general plate stud and then onto the bolt by hand. [Exhaustive Evidence List] <17.13-28.87> the operator screw [nut 10] onto [general plate stud 13] by hand, <28.93-36.20> the operator screw [nut 10] onto [bolt 9] by hand, and <36.27-39.93> the operator screw [nut 1... | The nuts are screwed onto the general plate stud and then onto the bolt by hand. | [Exhaustive Evidence List] <17.13-28.87> the operator screw [nut 10] onto [general plate stud 13] by hand, <28.93-36.20> the operator screw [nut 10] onto [bolt 9] by hand, and <36.27-39.93> the operator screw [nut 11] onto [bolt 9] by hand. | {
"temporal": {
"<T1>": [
"17.13",
"28.87"
],
"<T2>": [
"28.93",
"36.20"
],
"<T3>": [
"36.27",
"39.93"
]
},
"spatial": {
"nut": "{10, 11}",
"general plate stud": "{13}",
"bolt": "{9}"
}
} | Type 3:[Operation Manner] |
186 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | How many general plate holes are interacted with throughout the video? | [Direct Summary Answer] A total of 3 general plate holes are interacted with. [Exhaustive Evidence List] <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand, <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand, and <28.93-36.20> the operator insert [bolt 9] into [g... | A total of 3 general plate holes are interacted with. | [Exhaustive Evidence List] <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand, <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand, and <28.93-36.20> the operator insert [bolt 9] into [general plate hole 3 16] by hand. | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"28.93",
"36.20"
]
},
"spatial": {
"bar": "{6}",
"general plate hole 2": "{4}",
"rod": "{7}",
"general plate hole 1": "{3}",
"bolt": "{9}",
"gene... | Type 2:[Spatial Counting] |
187 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | After the bar and rod are inserted into the general plate holes, what are the subsequent actions involving the nuts and the philips screw? | [Direct Summary Answer] The operator screws two nuts onto the stud and one philips screw into a hole by hand. [Exhaustive Evidence] <17.13-18.93> the operator screw [nut 10] on [general plate stud 13] by hand; <40.67-42.73> the operator screw [nut 11] on [general plate stud 13] by hand; <40.87-42.73> the operator screw... | The operator screws two nuts onto the stud and one philips screw into a hole by hand. | [Exhaustive Evidence] <17.13-18.93> the operator screw [nut 10] on [general plate stud 13] by hand; <40.67-42.73> the operator screw [nut 11] on [general plate stud 13] by hand; <40.87-42.73> the operator screw [philips screw 12] into [general plate hole 4 17] by hand. | {
"temporal": {
"<T1>": [
"17.13",
"18.93"
],
"<T2>": [
"40.67",
"42.73"
],
"<T3>": [
"40.87",
"42.73"
]
},
"spatial": {
"nut": "{10, 11}",
"general plate stud": "{13}",
"philips screw": "{12}",
"general plate hole 4": "{17}"
}
} | Type 1: [Action Sequence] |
188 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | How are the nut and the philips screw handled during their simultaneous processing? | <40.67-42.73> the operator screw [nut 11] on [general plate stud 13] by hand and <40.87-42.73> the operator screw [philips screw 12] into [general plate hole 4 17] by hand. | the operator screw nut on general plate stud by hand and the operator screw philips screw into general plate hole 4 by hand. | <40.67-42.73> the operator screw [nut 11] on [general plate stud 13] by hand and <40.87-42.73> the operator screw [philips screw 12] into [general plate hole 4 17] by hand. | {
"temporal": {
"<T1>": [
"40.67",
"42.73"
],
"<T2>": [
"40.87",
"42.73"
]
},
"spatial": {
"nut": "{11}",
"general plate stud": "{13}",
"philips screw": "{12}",
"general plate hole 4": "{17}"
}
} | Type 3:[Operation Manner] |
189 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | How many components are placed into the general plate holes throughout the assembly? | [Direct Summary Answer] Three components are placed into the general plate holes: a bar, a rod, and a philips screw. [Exhaustive Evidence] <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand; <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand; <40.87-42.73> the op... | Three components are placed into the general plate holes: a bar, a rod, and a philips screw. | [Exhaustive Evidence] <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand; <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand; <40.87-42.73> the operator screw [philips screw 12] into [general plate hole 4 17] by hand. | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"40.87",
"42.73"
]
},
"spatial": {
"bar": "{6}",
"general plate hole 2": "{4}",
"rod": "{7}",
"general plate hole 1": "{3}",
"philips screw": "{12}",... | Type 2:[Spatial Counting] |
190 | S04A06I01M0 | /NexusBench/video/assembly/S04A06I01M0.mp4 | What is the sequence of actions performed on the general plate holes after the dial is rotated? | After the dial is rotated, the operator inserts a bar, a rod, and a usb male into the general plate holes, followed by screwing a nut and a philips screw. <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand. <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand. <14.... | After the dial is rotated, the operator inserts a bar, a rod, and a usb male into the general plate holes, followed by screwing a nut and a philips screw. | <9.87-12.53> the operator insert [bar 6] into [general plate hole 2 4] by hand. <12.60-14.33> the operator insert [rod 7] into [general plate hole 1 3] by hand. <14.40-17.07> the operator insert [usb male 8] into [general plate usb female 5] by hand. <17.13-17.27> the operator screw [nut 10] onto [general plate stud 13... | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"14.40",
"17.07"
],
"<T4>": [
"17.13",
"17.27"
],
"<T5>": [
"42.80",
"51.40"
]
},
"spatial": {
"bar": "{6}",
"general pla... | Type 1: [Action Sequence] |
191 | S04A06I01S1 | /NexusBench/video/assembly/S04A06I01S1.mp4 | What is the sequence of steps performed by the operator starting from the handling of the quarter-turn handle? | The operator rotates the quarter-turn handle and the dial, then inserts a bar and a rod into holes, followed by a usb male into a port, and finally screws a nut onto a stud. <6.33-7.40> the operator rotate [quarter-turn handle 16] by hand, <7.47-9.80> the operator rotate [dial 17] by hand, <9.87-12.53> the operator ins... | The operator rotates the quarter-turn handle and the dial, then inserts a bar and a rod into holes, followed by a usb male into a port, and finally screws a nut onto a stud. | <6.33-7.40> the operator rotate [quarter-turn handle 16] by hand, <7.47-9.80> the operator rotate [dial 17] by hand, <9.87-12.53> the operator insert [bar 3] into [general plate hole 2 11] by hand, <12.60-14.33> the operator insert [rod 4] into [general plate hole 1 10] by hand, <14.40-17.07> the operator insert [usb m... | {
"temporal": {
"<T1>": [
"6.33",
"7.40"
],
"<T2>": [
"7.47",
"9.80"
],
"<T3>": [
"9.87",
"12.53"
],
"<T4>": [
"12.60",
"14.33"
],
"<T5>": [
"14.40",
"17.07"
],
"<T6>": [
"17.13",
"19.93"
]
},
"... | Type 1: [Action Sequence] |
192 | S04A06I01S1 | /NexusBench/video/assembly/S04A06I01S1.mp4 | How is the quarter-turn handle handled by the operator? | <6.33-7.40> the operator rotate [quarter-turn handle 16] by hand. | the operator rotate quarter-turn handle by hand. | <6.33-7.40> the operator rotate [quarter-turn handle 16] by hand. | {
"temporal": {
"<T1>": [
"6.33",
"7.40"
]
},
"spatial": {
"quarter-turn handle": "{16}"
}
} | Type 3:[Operation Manner] |
193 | S04A06I01S1 | /NexusBench/video/assembly/S04A06I01S1.mp4 | What is the sequence of objects handled by the operator starting from the rotation of the quarter-turn handle? | [Direct Summary] The operator rotates a handle and a dial, then inserts a bar, a rod, and a USB male, and finally screws a nut. <6.33-7.40> the operator rotate [quarter-turn handle 16] by hand, <7.47-9.80> the operator rotate [dial 17] by hand, <9.87-12.53> the operator insert [bar 3] into [general plate hole 2 11] by ... | The operator rotates a handle and a dial, then inserts a bar, a rod, and a USB male, and finally screws a nut. | <6.33-7.40> the operator rotate [quarter-turn handle 16] by hand, <7.47-9.80> the operator rotate [dial 17] by hand, <9.87-12.53> the operator insert [bar 3] into [general plate hole 2 11] by hand, <12.60-14.33> the operator insert [rod 4] into [general plate hole 1 10] by hand, <14.40-17.07> the operator insert [usb m... | {
"temporal": {
"<T1>": [
"6.33",
"7.40"
],
"<T2>": [
"7.47",
"9.80"
],
"<T3>": [
"9.87",
"12.53"
],
"<T4>": [
"12.60",
"14.33"
],
"<T5>": [
"14.40",
"17.07"
],
"<T6>": [
"17.13",
"26.47"
]
},
"... | Type 1: [Action Sequence] |
194 | S04A06I01S1 | /NexusBench/video/assembly/S04A06I01S1.mp4 | How many distinct objects are handled by being placed into the general plate's holes or ports? | [Direct Summary] Three objects are inserted into the general plate. <9.87-12.53> the operator insert [bar 3] into [general plate hole 2 11] by hand, <12.60-14.33> the operator insert [rod 4] into [general plate hole 1 10] by hand, <14.40-17.07> the operator insert [usb male 9] into [general plate usb female 14] by hand... | Three objects are inserted into the general plate. | <9.87-12.53> the operator insert [bar 3] into [general plate hole 2 11] by hand, <12.60-14.33> the operator insert [rod 4] into [general plate hole 1 10] by hand, <14.40-17.07> the operator insert [usb male 9] into [general plate usb female 14] by hand. | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"14.40",
"17.07"
]
},
"spatial": {
"bar": "{3}",
"general plate hole 2": "{11}",
"rod": "{4}",
"general plate hole 1": "{10}",
"usb male": "{9}",
... | Type 2:[Spatial Counting] |
195 | S04A06I01S1 | /NexusBench/video/assembly/S04A06I01S1.mp4 | How is the nut processed once it is placed on the general plate stud? | <17.13-26.47> the operator screw [nut 7] onto [general plate stud 13] by hand. | the operator screw nut onto general plate stud by hand. | <17.13-26.47> the operator screw [nut 7] onto [general plate stud 13] by hand. | {
"temporal": {
"<T1>": [
"17.13",
"26.47"
]
},
"spatial": {
"nut": "{7}",
"general plate stud": "{13}"
}
} | Type 3:[Operation Manner] |
196 | S04A06I01S1 | /NexusBench/video/assembly/S04A06I01S1.mp4 | Which object is handled immediately after the rod is processed? | <14.40-17.07> the operator insert [usb male 9] into [general plate usb female 14] by hand. | the operator insert usb male into general plate usb female by hand. | <14.40-17.07> the operator insert [usb male 9] into [general plate usb female 14] by hand. | {
"temporal": {
"<T1>": [
"14.40",
"17.07"
]
},
"spatial": {
"usb male": "{9}",
"general plate usb female": "{14}"
}
} | Type 1: [Action Sequence] |
197 | S04A06I01S1 | /NexusBench/video/assembly/S04A06I01S1.mp4 | What actions are performed on the quarter-turn handle and the dial at the beginning of the sequence? | [Direct Summary] Both the handle and the dial are rotated by hand. <6.33-7.40> the operator rotate [quarter-turn handle 16] by hand, <7.47-9.80> the operator rotate [dial 17] by hand. | Both the handle and the dial are rotated by hand. | <6.33-7.40> the operator rotate [quarter-turn handle 16] by hand, <7.47-9.80> the operator rotate [dial 17] by hand. | {
"temporal": {
"<T1>": [
"6.33",
"7.40"
],
"<T2>": [
"7.47",
"9.80"
]
},
"spatial": {
"quarter-turn handle": "{16}",
"dial": "{17}"
}
} | Type 1: [Action Sequence] |
198 | S04A06I01S1 | /NexusBench/video/assembly/S04A06I01S1.mp4 | What is the chronological order of objects processed and placed into the holes on the general plate? | The operator inserts a bar, a rod, and then a bolt into the holes. <9.87-12.53> the operator insert [bar 3] into [general plate hole 2 11] by hand, <12.60-14.33> the operator insert [rod 4] into [general plate hole 1 10] by hand, and <26.53-28.87> the operator insert [bolt 5] into [general plate hole 3 15] by hand. | The operator inserts a bar, a rod, and then a bolt into the holes. | <9.87-12.53> the operator insert [bar 3] into [general plate hole 2 11] by hand, <12.60-14.33> the operator insert [rod 4] into [general plate hole 1 10] by hand, and <26.53-28.87> the operator insert [bolt 5] into [general plate hole 3 15] by hand. | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"26.53",
"28.87"
]
},
"spatial": {
"bar": "{3}",
"general plate hole 2": "{11}",
"rod": "{4}",
"general plate hole 1": "{10}",
"bolt": "{5}",
"ge... | Type 1: [Action Sequence] |
199 | S04A06I01S1 | /NexusBench/video/assembly/S04A06I01S1.mp4 | How many holes on the general plate are used to receive objects during the assembly process? | Three holes are used. <9.87-12.53> the operator insert [bar 3] into [general plate hole 2 11] by hand, <12.60-14.33> the operator insert [rod 4] into [general plate hole 1 10] by hand, and <26.53-28.87> the operator insert [bolt 5] into [general plate hole 3 15] by hand. | Three holes are used. | <9.87-12.53> the operator insert [bar 3] into [general plate hole 2 11] by hand, <12.60-14.33> the operator insert [rod 4] into [general plate hole 1 10] by hand, and <26.53-28.87> the operator insert [bolt 5] into [general plate hole 3 15] by hand. | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"26.53",
"28.87"
]
},
"spatial": {
"bar": "{3}",
"general plate hole 2": "{11}",
"rod": "{4}",
"general plate hole 1": "{10}",
"bolt": "{5}",
"ge... | Type 2:[Spatial Counting] |
200 | S04A06I01S1 | /NexusBench/video/assembly/S04A06I01S1.mp4 | How does the operator handle the group of objects that are placed into the general plate holes? | The operator inserts the bar, rod, and bolt into their respective holes by hand without using any tools. <9.87-12.53> the operator insert [bar 3] into [general plate hole 2 11] by hand, <12.60-14.33> the operator insert [rod 4] into [general plate hole 1 10] by hand, and <26.53-28.87> the operator insert [bolt 5] into ... | The operator inserts the bar, rod, and bolt into their respective holes by hand without using any tools. | <9.87-12.53> the operator insert [bar 3] into [general plate hole 2 11] by hand, <12.60-14.33> the operator insert [rod 4] into [general plate hole 1 10] by hand, and <26.53-28.87> the operator insert [bolt 5] into [general plate hole 3 15] by hand. | {
"temporal": {
"<T1>": [
"9.87",
"12.53"
],
"<T2>": [
"12.60",
"14.33"
],
"<T3>": [
"26.53",
"28.87"
]
},
"spatial": {
"bar": "{3}",
"general plate hole 2": "{11}",
"rod": "{4}",
"general plate hole 1": "{10}",
"bolt": "{5}",
"ge... | Type 3:[Operation Manner] |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.