text
stringlengths 1
2.97k
|
|---|
> labnetwork mailing list
|
> labnetwork at mtl.mit.edu
|
> https://mtl.mit.edu/mailman/listinfo.cgi/labnetwork
|
From wjkiethe at ncsu.edu Fri Aug 18 11:30:14 2023
|
From: wjkiethe at ncsu.edu (William Kiether)
|
Date: Fri, 18 Aug 2023 11:30:14 -0400
|
Subject: [labnetwork] Ebara Pump Setup
|
Message-ID: <CAN1vinst1xU2XJteyYm37M6Z17EEMQDATR40=B5V1zz5rMd4fQ@mail.gmail.com>
|
Hello,
|
We are trying to test some Ebara dry pump/blower combos that we got from a
|
tool donation and are having problems with the setup. The pumps are
|
EST200WN models with both a pump and a blower, but the controllers are only
|
recognizing them as EST10N, which are smaller units w/o the blower option.
|
When powered up, only the pump will turn on. This occurs whether we are
|
using the Ebara controller or the remote option with jumpers. The power is
|
208 - 3phase, and we also tried switching the 2 of the phases. Has anybody
|
encountered this problem? The Ebara documentation has not been helpful for
|
this issue.
|
Bill Kiether
|
NCSU Nanofabrication Facility
|
-------------- next part --------------
|
An HTML attachment was scrubbed...
|
URL: <https://mtl.mit.edu/pipermail/labnetwork/attachments/20230818/aae26f7a/attachment.html>
|
From schweig at umich.edu Fri Aug 18 12:27:38 2023
|
From: schweig at umich.edu (Dennis Schweiger)
|
Date: Fri, 18 Aug 2023 12:27:38 -0400
|
Subject: [labnetwork] Ebara Pump Setup
|
In-Reply-To: <CAN1vinst1xU2XJteyYm37M6Z17EEMQDATR40=B5V1zz5rMd4fQ@mail.gmail.com>
|
References: <CAN1vinst1xU2XJteyYm37M6Z17EEMQDATR40=B5V1zz5rMd4fQ@mail.gmail.com>
|
Message-ID: <CAKzi2_PrVWtj0q6KgMkfP5K_x0pS6tP=BW6zS6jU1V1K8ixaQA@mail.gmail.com>
|
Bill,
|
On the Ebara A70's we use, there is a delay that is vacuum related between
|
the start of the mechanical pump, before the blower fires up. Is it
|
possible that this is your issue?
|
Dennis
|
734.647.2055 Ofc
|
On Fri, Aug 18, 2023 at 12:21?PM William Kiether <wjkiethe at ncsu.edu> wrote:
|
> Hello,
|
>
|
> We are trying to test some Ebara dry pump/blower combos that we got from a
|
> tool donation and are having problems with the setup. The pumps are
|
> EST200WN models with both a pump and a blower, but the controllers are only
|
> recognizing them as EST10N, which are smaller units w/o the blower option.
|
> When powered up, only the pump will turn on. This occurs whether we are
|
> using the Ebara controller or the remote option with jumpers. The power is
|
> 208 - 3phase, and we also tried switching the 2 of the phases. Has anybody
|
> encountered this problem? The Ebara documentation has not been helpful for
|
> this issue.
|
>
|
> Bill Kiether
|
> NCSU Nanofabrication Facility
|
> _______________________________________________
|
> labnetwork mailing list
|
> labnetwork at mtl.mit.edu
|
> https://mtl.mit.edu/mailman/listinfo.cgi/labnetwork
|
>
|
-------------- next part --------------
|
An HTML attachment was scrubbed...
|
URL: <https://mtl.mit.edu/pipermail/labnetwork/attachments/20230818/8b3c5ff8/attachment.html>
|
From wjkiethe at ncsu.edu Fri Aug 18 13:26:36 2023
|
From: wjkiethe at ncsu.edu (William Kiether)
|
Date: Fri, 18 Aug 2023 13:26:36 -0400
|
Subject: [labnetwork] Ebara Pump Setup
|
In-Reply-To: <CAKzi2_PrVWtj0q6KgMkfP5K_x0pS6tP=BW6zS6jU1V1K8ixaQA@mail.gmail.com>
|
References: <CAN1vinst1xU2XJteyYm37M6Z17EEMQDATR40=B5V1zz5rMd4fQ@mail.gmail.com>
|
<CAKzi2_PrVWtj0q6KgMkfP5K_x0pS6tP=BW6zS6jU1V1K8ixaQA@mail.gmail.com>
|
Message-ID: <CAN1vinvPBr4KBC+8MjinEp4AUW84sieiNRmirMgS2mKhoFh_Jw@mail.gmail.com>
|
No, we are aware of the 30 second delay, and have let it go for up to 10
|
minutes - we also haven?t detected any voltage being sent to the blowers
|
Bill
|
On Fri, Aug 18, 2023 at 12:29 PM Dennis Schweiger <schweig at umich.edu> wrote:
|
> Bill,
|
>
|
> On the Ebara A70's we use, there is a delay that is vacuum related between
|
> the start of the mechanical pump, before the blower fires up. Is it
|
> possible that this is your issue?
|
>
|
> Dennis
|
>
|
> 734.647.2055 Ofc
|
>
|
> On Fri, Aug 18, 2023 at 12:21?PM William Kiether <wjkiethe at ncsu.edu>
|
> wrote:
|
>
|
>> Hello,
|
>>
|
>> We are trying to test some Ebara dry pump/blower combos that we got from
|
>> a tool donation and are having problems with the setup. The pumps are
|
>> EST200WN models with both a pump and a blower, but the controllers are only
|
>> recognizing them as EST10N, which are smaller units w/o the blower option.
|
>> When powered up, only the pump will turn on. This occurs whether we are
|
>> using the Ebara controller or the remote option with jumpers. The power is
|
>> 208 - 3phase, and we also tried switching the 2 of the phases. Has anybody
|
>> encountered this problem? The Ebara documentation has not been helpful for
|
>> this issue.
|
>>
|
>> Bill Kiether
|
>> NCSU Nanofabrication Facility
|
>>
|
> _______________________________________________
|
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.